Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSM 10(6495)101.1
Abandoned Mine Reclamation Project, West Liberty South #1, Brady Township, Butler County Estimated Amount: $500,000 to $1,000,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 Each Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 672 L.F. Clearing and Grubbing, 1 L.S. Subsurface Drains with Cleanouts, 1,750 L.F. Grading, 252,589 C.Y. Planting – Tree Seedlings, 9,318 EACH READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 6%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
05/09/2024 06:00 PM UTC
OSM 16(1957)101.1
Abandoned Mine Reclamation Project Mahles Run East Knox and Washington Townships, Clarion County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32"Diameter), 1,414 L.F. Sealing Collapsed Mine Entry, 1 EACH Subsurface Drain, 494 L.F. Grading – Grading, 35,543 C.Y. Seeding – Mulching, 6.8 ACRE
05/30/2024 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OSM 02(1712)301.1
Abandoned Mine Reclamation Project, Renton South, Plum Borough, Allegheny County. PLEASE NOTE THAT THE BID OPENING HAS BEEN EXTENDED TO MAY 7, 2020. Estimated Amount: $100,000 to $200,000 (Small Business Only). Term: 270 calendar days. Bid Bond NOT Required. Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan, Misc. Items Clearing and Grubbing, 1 JOB Selective Grading, 1 JOB Dewatering, Diversion and Care of Water, 1 JOB Excavating, Backfilling and Compacting for Utilities, Slotted PVC Well Pipe, Unclassified, 216 L.F. Excavating, Backfilling and Compacting for Utilities, Slotted PVC Well Pipe, Rock Over-ex., 10 C.Y. Excavating, Backfilling and Compacting for Utilities, Solid PVC Pipe, Unclassified, 162 L.F. Excavating, Backfilling and Compacting for Utilities, Solid PVC Pipe, Rock Over-excavation, 20 C.Y. Precast Concrete Manholes and Appurtenances, 1 EA. Slotted PVC Pipe, Fittings and Appurtenances, 230 L.F. Solid PVC Pipe, Fittings and Appurtenances, 148 L.F. PVC Pipe, Fittings and Appurtenances, Cleanouts and Observation Ports, 3 EA. PVC Pipe, Fittings and Appurtenances, Clay Dikes, 1EA. PVC Geomembrane, 480 S.Y. Paving and Roadway Appurtenances Restoration, Bituminous Driveways and Sidewalks, 1170 S.Y. Paving and Roadway Appurtenances Restoration, Gravel Driveways and Stabilized Shoulders, 1 S.Y. Paving and Roadway Appurtenances Restoration, Paved Shoulders, Type III, 5 S.Y. Landscape Restoration, Plants, Shrubbery, Trees, Misc. Items Allowance for Utility Services, 1 INVOICE
05/07/2020 06:00 PM UTC
OSM 17(6881)101.1
Abandoned Mine Reclamation Project, Waltzvale East Waterline Extension, Gulich Township, Clearfield County. PLEASE NOTE THAT THE BID OPENING HAS BEEN EXTENDED TO APRIL 30, 2020. Estimated Amount: $500,000 to $1,000,000; Term: 120 calendar days; Bid Bond Required. Principle Items of Work and Approximate Quantities: Eight-Inch (8") PVC Pipe or HDPE Pipe Including Fittings, 8,810 L.F. 2A Stone, 4,460 C.Y. Service Lateral Connections, 14 EACH Mobilization and Demobilization, 1 L.S. Site Preparation and Restoration, 1 L.S.
04/30/2020 06:00 PM UTC
OSM 35(1796)103.1
PLEASE NOTE THAT THE BID OPENING DATE FOR THIS PROJECT HAS BEEN EXTENDED TO APRIL 23, 2020 AT 2:00 PM. Abandoned Mine Reclamation Project, Demolition at 1517 Euclid Avenue, Scranton, City of Scranton, Lackawanna County. Estimated Amount: $0 to $100,000 (Small Business Only); Term: 60 calendar days; Bid Bond required; Principle Items of Work and Approximate Quantities: Removal and Disposal of Structure - 1 Clean Fill - 800 TON Drilling Coreholes - 10 EACH Flowable Fill - 45 CY Chain Link Fence - 290 LF Seeding - 1000 SY
04/23/2020 06:00 PM UTC
OSM 26(4732)101.1
Abandoned Mine Reclamation Project, Lake Lynn West, Springhill Township, Fayette County. Estimated Amount: $300,000-$500,000. Term:365 calendar days. Bid Bond Required. Principal Items of Work and Approximate Quantities: Mine Seal Construction- Coarse Aggregate, 680 Ton Mine Seal Construction- Mine Drain Pipe, 1,020 L.F. Grading, 55,600 C.Y. Alkaline Addition, 620 Ton Rock Lining with Geotextile, 1,145 S.Y. Seeding, 13.2 Acre
04/23/2020 06:00 PM UTC
OSM 14(0880)101.1
Abandoned Mine Reclamation Project, Shettleston, Snow Shoe Township, Centre County Estimated Amount: $1,000,000 to $5,000,000 Term: 545 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clearing and Grubbing, 44.7 Acre Grading, 390,507 C.Y. Alkaline Addition, 14,880 Ton Trees, 38,275 Seedling No Mandatory Pre-Bid Meeting.
01/30/2020 07:00 PM UTC
OSM 35(2080)105.1 DGS 193-43 Phase 1
Abandoned Mine Reclamation Project, Sterry Creek South - Dolph Mine Fire, Olyphant Borough, Lackawanna County. ADDENDUM NO. 1, ADDENDUM NO. 2 AND ADDENDUM NO. 3 HAVE BEEN UPLOADED UNDER ATTACHMENT LIST. THESE ADDENDUMS MUST BE SIGNED, DATED AND SUBMITTED WITH YOUR BID. Estimated Amount: Greater than $5,000,000. Term: 1,000 calendar days. Bid Bond Required. Principal Items of Work and Approximate Quantities - Base Bid: 1 Mobilization and Demobilization 1 L.S., 2A1 Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance - Geotextile Installation 360 S.Y., 2A2 Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance - AASHTO #1 Aggregate Placement 160 TON, 2A3 Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance - AASHTO #1 Aggregate Removal 160 TON, 2A4 Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance - Geotextile Removal 360 S.Y., 2B1 Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock - Install and Maintain 18" Compost Filter Sock 2,410 L.F., 2B2 Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock - Install and Maintain 24" Compost Filter Sock 200 L.F., 2B3 Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock - Remove Stakes and Cut Open 18" Compost Filter Sock 2,410 L.F., 2B4 Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock - Remove Stakes and Cut Open 24" Compost Filter Sock 200 L.F., 2C Implementation of the Erosion and Sediment Pollution Control Plan - Rock Filter Outlets 4 EA., 2D Implementation of the Erosion and Sediment Pollution Control Plan - Pumped Water Filter Bag 3 EA., 2E Implementation of the Erosion and Sediment Pollution Control Plan - Orange Construction Fence 200 L.F., 3 Clearing and Grubbing 1 L.S., 4A Access Roads - Access Road 'A' 1 L.S., 4B Access Roads - Access Road 'D' 1 L.S., 4C Access Roads - Access Road 'E' 1 L.S., 5 Access Gate 3 EA., 6 Underground Utility Line Equipment Crossing 10 EA., 7 Temporary Stream Crossing 1 EA., 8A Water Storage Ponds - Pond 1, 1 EA., 8B Water Storage Ponds - Pond 2, 1 EA., 8C Water Storage Ponds - Pond 3, 1 EA., 9B Water Supply - Develop 2018 Drawdown Well Water Source 1 L.S., 9C Water Supply - Develop Valley View Drive Water Source 1 L.S., 9D Water Supply - Water 50,000 PER 1000 GALLONS, 11 Fire Fighting Foam 8,000 GALLONS, 12A Excavation/Backfilling - Overburden/Quenched Material 1,367,500 C.Y., 12B Excavation/Backfilling - Special Handling of Coal 139,100 C.Y., 12C Excavation/Backfilling - Excavation for Backfilling/Final Grading 755,000 C.Y., 12D Excavation/Backfilling - Alkaline Addition Materials 2,500 TON, 13A Blasting - Blasting 559,500 C.Y., 13B Blasting - Pre-Blast Survey 9 EA., 13C Blasting - Post-Blast Survey 9 EA., 14 Drilling Monitoring Boreholes 300 L.F., 15 Steel Casing for Boreholes 300 L.F., 16A Rolled Erosion Control Products - NAG C350 3,900 SY, 16B Rolled Erosion Control Products - NAG SC250 1,280 SY, 16C Rolled Erosion Control Products - NAG W3000 5,150 SY, 17A Seeding - Seed Mixture 1, 95 ACRE, 17B Seeding - Seed Mixture 2, 20 ACRE, 17C Seeding - Supplements 115 ACRE, 17D Seeding - Mulch 115 ACRE, 18 Fence Removal 7,200 L.F., 19 Office Facility 1 L.S. Principal Items of Work and Approximate Quantities - Alternate Bid #1: 5 Access Gate 1 EA., 7 Temporary Stream Crossing 1 EA., 9A Develop Marshwood Reservoir Water Source 1 LS, 10 Jack and Bore of State Road 1 LS. Mandatory Pre-Bid Meeting will be held on December 18, 2019 from 10:00 a.m. to 12:00 noon at PA Department of Transportation, Maintenance District 4-0 / Lackawanna County 4-2, 1034 Morgan Highway, Clarks Summit, PA 18411.
01/16/2020 07:00 PM UTC
OSM 61(1166)101.1
Abandoned Mine Reclamation Project, Dennison Run, Victory Township, Venango County. Estimated Amount: $200,000 to $299,999 (Small Business Only) Term: 210 Calendar Days Bid Bond Required Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 1 L.S. Grading, 57,000 C.Y. Engineered Soil Builder Material, 13 Acre Flexible Growth Medium, 13 Acre Seeding, 13 Acre
01/16/2020 07:00 PM UTC
OSM 11(2725)102.1
Abandoned Mine Reclamation Project, Lilly East Lilly Borough and Washington Township, Cambria County Estimated Amount: $0 to $100,000 (Small Business Only) Term: 180 calendar days Bid Bond Required Principle Items of Work and Approximate Quantities: Alkaline Addition, 250 Ton Selective Grading, 300 S.Y. Grading, 2,700 C.Y. Channel and Dissipater Excavation, 150 C.Y. Erosion Matting, 330 S.Y. Rock Lining, 35 S.Y. Seeding 1.2 Acres
01/07/2020 07:00 PM UTC
OSM 11(0824)102.1
Abandoned Mine Reclamation Project Carrolltown Road No. 1 (II) West Carroll Township, Cambria County Estimated Amount: $300,000 to $500,000 Term: 240 calendar days Bid Bond Required Principle Items of Work and Approximate Quantities: Clearing and Grubbing, 9.8 ACRE; Installation of Thirty-Two-Inch (32”) Compost Filter Socks, 1,150 L.F.; Construction of Rock Sump – R-6 Non-Calcareous Coarse Aggregate, 1,150 TON; Construction of Rock Sump – R-3 Non-Calcareous Coarse Aggregate, 270 TON; Grading, 131,013 C.Y.; Orphan Gas Well, 1 L.S.; Gate, 1 L.S.; Seeding – Mulching, 10.2 ACRE.
12/05/2019 07:00 PM UTC
OSM 02(2195)101.1
Abandoned Mine Reclamation Project, West Allegheny School, North Fayette Township, Allegheny County. Estimated Amount: $100,000 to $200,000 (Small Business Only). Term: 270 Calendar Days. Bid Bond Required. Principle Items of Work and Approximate Quantities: Mobilization and Demobilization, 1 L.S. Grading, 35,000 C.Y. Seeding, 8 Acre
12/05/2019 07:00 PM UTC
71 - 80 of 141 Solicitations