OOGM FS25-1
Cleaning Out and Plugging Fifteen (15) Orphan Gas Wells
Lancaster, Forward, and Connoquenessing Townships, Butler County
Estimated Amount: $1,000,000-$5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug fifteen (15) orphan gas wells, estimated to be 1,100 to 3,500 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: October 15, 2025 at 9:00 a.m.
Department representatives will meet contractors at: Pavillion #6 at Moraine State Park, 40.9667, -80.1238.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 10/30/2025 06:00 PM UTC |
|
OSM 17(7183)101.1
Abandoned Mine Reclamation Project
Goshen West
Goshen Township, Clearfield County
Estimated Amount: $500,000-$1,000,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 Each
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter) – 4,480 L.F.
Clearing and Grubbing, 27.8 Acre
Grading - Grading, 216,478 C.Y.
Grading – Hummocky Piles, 14.3 Acre
Grading – Ripping, 13.5 Acre
Planting – Planting Preparation, 27.8 Acre
Planting – Tree Seedlings, 18.904 Each
| 11/06/2025 07:00 PM UTC |
|
OOGM 25-1
Cleaning Out and Plugging Forty-Four (44) Abandoned/Orphaned Wells Permitted Oil/Gas Wells
Highland Township, Elk County
Estimated Amount: $1,000,000-$5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug forty-four (44) Oil/Gas Wells, estimated to be up to 3,000 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: October 22nd through October 23rd, 2025, at 9:00 a.m.
Department representatives will meet contractors at:
Lamont Tool Shop
Warehouse Rd (FR 337)
41.5347, -78.9143
To access the well locations, it is advised the contractors bring an ATV/UTV to commute between wells. The ATV trail access is between 7 and 8 miles of wooded terrain not accessible by car or truck. No pickup trucks or other vehicles other than ATV’s/UTV’s are permitted on the standalone ATV trail network. The USFS will allow the use of an ATV/UTV under 70” width at the pre-bid. The ride will be at your own risk and all safety equipment should be worn while driving. Although bringing an ATV/UTV is a recommended option, all potential bidders will have the opportunity to view all wells, regardless of if they bring an ATV/UTV to the meeting.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 11/06/2025 07:00 PM UTC |
|
OSM 17(4543)101.1
Abandoned Mine Reclamation Project
Alder Run
Morris Township, Clearfield County
Estimated Amount: $300,000-$500,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (12” Diameter) - 930 L.F.
Clearing and Grubbing, 21.7 ACRE
Grading - Grading, 149,622 C.Y.
Grading - Ripping, 0.6 ACRE
Planting - Planting Preparation, 21.7 ACRE
Planting - Tree Seedlings, 408 EACH
Dewatering Impoundments, 1 L.S.
Sediment Basin and Vernal Pool Construction, 1 L.S.
| 11/06/2025 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
OOGM 17-2
Cleaning Out and Plugging One (1) Orphan Gas Well in Chapman Township, Clinton County. Estimated Amount is $0 to $100,000 (Small Business Only). Term is 20 calendar days. Bid Bond is required. Principle Items of Work and Approximate Quantities are to clean out and plug one (1) orphan gas well, estimated to be 2,600 feet in depth, to Department specifications; to prepare and restore well sites/site; and to mobilize and demobilize plugging equipment. PRE-BID MEETING IS FEBRUARY 1, 2018 AT 11:00 AM AT 26 GRANT AVENUE, CHAPMAN TOWNSHIP (RENOVO) PA 17760.
| 03/08/2018 07:00 PM UTC |
|
OSM 33(6321)101.1
Abandoned Mine Reclamation Project, McGarey South, Beaver Township, Jefferson County. Estimated Amount: $300,000 to $500,000. Term: 240 calendar days. Bid Bond Required. Principal Items of Work and Approximate Quantities: Subsurface Drains with Cleanouts, 250 L.F.; Alkaline Addition, 3,460 TON; Grading, 132,700 C.Y.; Channel and Swale Excavation, 1,025 C.Y.; Erosion Matting, 2,180 S.Y.; Rock Lining, 235 S.Y.; Seeding, 16 ACRE.
| 02/27/2018 07:00 PM UTC |
|
HSCP-3-223-102.1
Hazardous Site Cleanup Project, Intercourse TCE Site Water Supply and Treatment System, Leacock Township, Lancaster County; Estimated Amount: Greater than $5,000,000; Term: 730 Calendar Days; Bid Bond Required; Principal Items of Work and Approximate Quantities: See General Contract Information. Mandatory Pre-Bid Meeting on January 17, 2018 at 10:00 a.m. in the Leacock Township Office, 3545 West Newport Road, Intercourse, PA 17534.
| 02/08/2018 07:00 PM UTC |
|
OSM 17(6483)101.1
Water Main Extension Project, Pine Grove North (Glen Richey) Waterline, Lawrence Township, Clearfield County; Estimated Amount: $1,000,000 to $5,000,000; Term: 365 calendar days; Bid Bond Required; Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 1 L.S.; Site Preparation and Restoration, 1 L.S.; Eight-Inch (8”) and Six-Inch (6”) PVC Pipe Including Fittings, 70,500 L.F.; Eight-Inch (8”) and Six-Inch (6”) Gate Valve and Roadway Valve Box, 70 EACH; 2A Stone, 20,445 C.Y.; Service Lateral Connections, 151 EACH; Highway Crossing Boring, 300 L.F.; Repaving - Twenty-Five (25) mm Superpave Base Course, 2,000 TON; Repaving - Nine (9) mm Superpave Wearing Course, 7,300 S.Y.; SR-153 Krebbs Highway Pressure Reducing Vault, 1 EACH;
Bolted Stainless-Steel Water Storage Tank Including Foundation, 1 L.S.; Packaged Water Booster Pumping Station Complete, 1 L.S.
| 01/25/2018 07:00 PM UTC |
|
OOGM 17-1
Cleaning Out and Plugging One (1) Orphan Gas Well, East Keating Township, Clinton County; Estimated Amount: $100,000 to $200,000 (Small Business Only); Term: 20 calendar days; Bid Bond required; Principal Items of Work and Approximate Quantities: Clean out and plug one (1) orphan gas well, estimated to be 6,000 feet in depth, to Department specifications; Prepare and restore well sites/site; and Mobilize and demobilize plugging equipment. A MANDATORY PRE-BID CONFERENCE WILL BE HELD ON JANUARY 4, 2018 AT 10:00 A.M. AT DCNR, SPROUL FOREST DISTRICT, 15187 RENOVO ROAD, RENOVO, PA 17764.
| 01/25/2018 07:00 PM UTC |
|
AMD 54(4124)105.1
Abandoned Mine Reclamation Project, Rausch Creek Treatment Plant Upgrades, Hegins Township, Schuylkill County; Estimated Amount: $300,000-$500,000; Term: 300 calendar days; Bid Bond Required; Principle Items of Work and Approximate Quantities include: To replace certain pieces of equipment associated with the Rausch Creek Acid Mine Drainage Treatment Plant. Specifically, the standby generator, polymer mixing and distribution pumping system, and certain components of the plant water system are to be replaced. Much of the old equipment will be demolished and disposed of, including the 125-foot-tall elevated 100,000-gallon water storage tank. A MANDATORY PRE-BID MEETING WILL BE HELD ON NOVEMBER 7, 2017 at 11:00AM, Rausch Creek AMD Treatment Plant, 315 Schwenks Road, Valley View, PA 17983-0758.
| 12/21/2017 07:00 PM UTC |
|
OSM 13(3206)101.1
Abandoned Mine Reclamation Project, Tresckow South, Banks Township, Carbon County; Estimated Amount $1,000,000 to $5,000,000; Term 720 calendar days; Bid Bond Required; Principle Items of Work and Approximate Quantities include Clearing and Grubbing 177.6 AC, Grading 1,937,857 CY, Drainage Excavation 8,066 CY, Granular Sodium Bentonite Clay Lining 605 TON.
| 12/19/2017 07:00 PM UTC |
|
OSM 26(2783)101.1
Abandoned Mine Reclamation Project, Everson, Upper Tyrone Township, Fayette County; Estimate Amount $300,000 to $500,000; Term 120 calendar days; Bid Bond required. Principle Items of Work and Approximate Quantities: Overburden Drilling and Casing, 675 L.F.; Four-Inch (4") Air Rotary Drilling, 702 L.F.; Four-Inch (4") Nominal Steel or PVC Injection Casing, 253 L.F.; Injection of Grout Material, 2,851 TON.
| 11/30/2017 07:00 PM UTC |
|
OSM 54(3103)103.1
Abandoned Mine Reclamation Project, Quick Subsidence – Phase 2 Drilling, Mahanoy Township, Schuylkill County, Estimated Amount: $500,000 to $1,000,000, Term: 120 calendar days, Bid Bond Required, Principal Items of Work and Approximate Quantities: Clearing and Grubbing, 4,840 S.Y.; Vertical Air Rotary Drilling to Accommodate Four-Inch (4”) Casing, 1,773 L.F.; Four-Inch (4”) I.D. Steel or PVC Casing, 1,122 L.F.; Fill Material Injection – Flowable Fill Material Through Boreholes, 500 C.Y.; Fill Material Injection – Concrete Fill Material Through Boreholes, 500 C.Y.; Grading, 2,300 C.Y.; Geosynthetic Clay Liner, 605 S.Y.; Topsoil, 440 TON; Seeding, 6,480 S.Y.
| 11/28/2017 07:00 PM UTC |
|
OSM 26(4734)102.1
Abandoned Mine Reclamation Project, Gans Hill School, Springhill Township, Fayette County. Estimated Amount: $0 to $100,000 (Small Business Only). Term: 180 calendar days. Bid Bond Required. Principal Items of Work and Approximate Quantities include Clearing and Grubbing, 1 LS; Grading, 28,000 CY; Seed, 192 LB; Commercial Fertilizer, 640 LB; Agricultural Limestone, 12.8 TON; Mulching, 3.2 ACRE.
| 11/02/2017 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.