General Info

Business Logo

Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OOGM 25-2
Cleaning Out and Plugging Eleven (11) Abandoned/Orphaned Wells Howe Township, Forest County Estimated Amount: $300,000-$500,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug eleven (11) Oil/Gas Wells, estimated to be up to 3,000 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: March 11, 2026, at 9:00 a.m. Department representatives will meet contractors at: Parking Area across from Minister Creek Campground on Rt. 666 in Howe Township. 41.6206396, -79.1536190 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
04/09/2026 06:00 PM UTC
OSM 17(3982)101.1 and OSM 17(3982)102.1
Abandoned Mine Reclamation Project Parsonville Northwest and Parsonville Northwest 2 Decatur Township, Clearfield County Estimated Amount: $300,000-$500,000 Term: 240 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 2,700 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Temporary Stream Crossing, 1 L.S. Clearing and Grubbing, 15.5 ACRE Grading – Grading Area 1, 26,000 C.Y. Grading – Grading Area 2, 57,000 C.Y. Planting – Planting Preparation, 15.5 ACRE
04/09/2026 06:00 PM UTC
OOGM FS25-3
Cleaning Out and Plugging Five (5) Orphan Gas Wells Sandycreek Township, Venango County Estimated Amount: $300,000-$500,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug five (5) orphan gas wells, estimated to be 500-1250 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: April 1, 2026, at 10:00 a.m. Department representatives will meet contractors at: Rails to Trails entrance off Belmar Road 41.333279, -79.774949 Belmar Road, Franklin, PA 16323 https://maps.app.goo.gl/wNpiW1xebcDNKF7r5 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
05/07/2026 06:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OSM 17(6801,6806)101.1
Abandoned Mine Reclamation Project, Weber Run South, Cooper Township, Clearfield County. Contract Estimate: $1,000,000 to $5,000,000; Term: 450 calendar days; Bid Bond Required. Principal Items of Work and Approximate Quantities: Maintenance and Protection of Traffic JOB; Clearing and Grubbing JOB; Access Road, No 2A Coarse Aggregate 1,200 TON; Grading 971,830 C.Y.; Drainage Excavation 8,950 C.Y.; Rolled Erosion Control Products 54,825 S.Y.; Rock Lining with Filter Material 3,770 S.Y.; Smooth Interior Corrugated Polyethylene Pipe 213 L.F.; Subsurface Drain 11,750 L.F.; Chimney/Blanket Drain, No. 8 Coarse Aggregate 645 TON; Seeding 99.3 ACRE.
01/08/2019 07:00 PM UTC
EC234291318
Trainer Auto Tank Removal, Trainer Borough, Delaware County. Contract Estimate: $0-$100,000 (Small Business Only); Term: 90 calendar days; Bid Bond is not required. Principal Items of Work and Approximate Quantities: DEP certified tank remover (UMR)- 1 job, Excavation/removal of 6 underground storage tanks (USTs), piping, 8 dispensers, and ancillary equipment- 1 job, Removal/disposal of water/petroleum mixture from inside USTs- approximately 7,500 gallons, Site restrictions/safety measure- 1 job, Backfill- estimated 650 Tons, Sampling and analysis of soil for petroleum compounds- 23 samples, Sampling and analysis of water for petroleum compounds- 11 samples, UST registration form and Closure Report- 1 job, Disposal of contaminated soils (if encountered)- estimated 200 tons. MANDATORY PRE-BID CONFERENCE TO BE HELD ON DECEMBER 13, 2018 AT 10:30AM. DEPARTMENT REPRESENTATIVES WILL MEET CONTRACTORS AT 3608 WEST 9TH STREET, TRAINER BOROUGH, DELAWARE COUNTY 19061. FAILURE TO ATTEND THE PRE-BID CONFERENCE WILL BE CAUSE FOR REJECTION OF BID.
01/03/2019 07:00 PM UTC
OSM 63(0618)104.1
Abandoned Mine Reclamation Project, Black Dog Hollow, East Bethlehem Township, Washington County; Estimated Amount: Greater than $5,000,000; Term: 600 calendar days; Bid Bond Required; Principal Items of Work and Approximate Quantities: Road Agreements, L.S., Excavation and Hauling, 173,000 C.Y., Grading, 608,800 C.Y., Soil Cover, 45.1 Acre, Tied Concrete Block Mat, 5,990 S.Y., Seeding, 51.0 Acre.
11/16/2018 07:00 PM UTC
OSM 02(0459)102.1
Abandoned Mine Reclamation Project, Chalfant Run, Churchill Borough, Allegheny County. Contract Estimate Amount: $0-$100,000 (Small Business Only), Term: 90 Calendar Days, Bid Bond required. Principal Items of Work and Approximate Quantities: Cast-In-Place Inlet Box, 1 Each; Subsurface Drains - Tie-In to Existing Concrete Inlet, 1 L.S.; Subsurface Drains - Twelve-Inch (12") N-12 Dual Wall HDPE Solid Pipe, 32 L.F.; Subsurface Drains - Eight-Inch (8") PVC SDR-35 Solid Pipe, 42 L.F.; Subsurface Drains - Eight-Inch (8") PVC SDR-35 Perforated Pipe with Cleanouts, 240 L.F.; Subsurface Drains - Removal and Disposal of Excavated Material, 1 L.S.; Subsurface Drains - In-Kind Replacement, 1 L.S.; Subsurface Drains - Pavement Replacement, 1 L.S.
10/25/2018 06:00 PM UTC
OSM 11(2812)101.1
Abandoned Mine Reclamation Project, Cymbria East, Susquehanna Township, Cambria County. Contract Estimate Amount: $100,000-$200,000 (Small Business Only), Term: 180 Calendar Days, Bid Bond required. Principle Items of Work and Approximate Quantities: Clearing and Grubbing, 10.6 Acre; Grading, 80,061 C.Y.; Tree Planting, 9,350 Tree.
10/11/2018 06:00 PM UTC
OSM 40(2247)101.5
Abandoned Mine Reclamation Project, Dorrance Exploratory Drilling, City of Wilkes-Barre, Luzerne County. Contract Estimate Amount: $100,000-$200,000 (Small Business Only), Term: 90 Calendar Days, Bid Bond required. Principle Items of Work and Approximate Quantities: Prepare a drilling pad. Drilling of six (6) boreholes to determine if two (2) mine shafts are open or filled. There will be approximately 273 feet of four (4) inch drilling, 273 feet of four (4) inch casing, and 830 feet of Three and Seven-Eighths (3 7/8) Inch Drilling.
10/04/2018 06:00 PM UTC
OSM 63(5042)101.1
Abandoned Mine Reclamation Project, Rylands Hill East, Jefferson Township, Washington County, Contract Estimate Amount: $300,000-$500,000, 360 Calendar Days, Bid Bond required. Principle Items of Work and Approximate Quantities include: Subsurface Drains with Cleanouts, 1,550 L.F.; Grading, 212,900 C.Y.; Channel Excavation, 498 C.Y.; Erosion Matting, 690 S.Y.; Rock Lining, 185 S.Y.; Mine Openings, See Sub Items; Seeding, 25.2 Acre.
09/13/2018 06:00 PM UTC
OOGM 18-3
Cleaning Out and Plugging Three (3) Gas Wells in Huston Township, Clearfield County; Contract Estimate Amount $300,000 - $500,000; Term - 180 calendar days; Bid Bond Required; Principal Items of Work and Approximate Quantities are to clean-out and plug three (3) gas wells, estimated to range in depth from 1,507 feet to 7,078 feet to Department specifications, to prepare and restore well sites, and to mobilize and demobilize plugging equipment. A MANDATORY Pre-Bid Conference is scheduled for August 8, 2018 at 10:00 a.m. Meet at the DCNR Moshannon Forest District, District Office, 3372 State Park Road, Penfield, PA 15849. Failure to attend the Pre-Bid Conference will be cause for rejection of the bid.
08/23/2018 06:00 PM UTC
Capital Bus Company
State Lead Project – UST Product and Tank Removal, Harrisburg City, Dauphin County. Estimated Amount: $0 to $100,000 (Small Business Only); Term: 30 Calendar Days; Bid Bond/Contract Bond not required; Small Diverse Business not required; Principal Items of Work and Approximate Quantities: Site Access and Restriction, 1 LS; Removal/Disposal of Residual Liquids from Underground Storage Tank Systems, 8,933 Gallons; Excavation, Removal & Disposal of Underground Storage Tank Systems, 2 LS; Removal/Disposal of Contaminated Soil from Underground Storage Tank Systems, 50 Tons; Backfill: (Stone), 100 Tons; Backfill: (Asphalt), 17 Tons; Project Completion Report, 1 LS. MANDATORY PRE-BID MEETING WILL BE HELD ON AUGUST 14, 2018 AT 10:00 AM AT 1061 SOUTH CAMERON STREET, HARRISBURG, PA 17105. Failure to attend the Pre-Bid Meeting will be cause for rejection of the bid.
08/23/2018 06:00 PM UTC
OOGM 17-4
Cleaning Out and Plugging One (1) Orphan Gas Well in Franklin Park Borough, Allegheny County. Contract Estimate Amount: $200,000 to $300,000 (Small Business Exempted); Term: 70 Calendar Days; Bid Bond Required; Principal Items of Work and Approximate Quantities: Clean-out and plug one (1) orphan gas well, estimated to be approximately 2,000 feet in depth, to Department specifications; Prepare and Restore Well Sites/Site; Mobilize and Demobilize Plugging Equipment. A mandatory pre-bid meeting was held on August 2, 2018 at 10:00 AM at the 2205 McAleer Road, Franklin Park, PA 15143. Only attendees of this meeting are able to bid on this project.
08/23/2018 06:00 PM UTC
161 - 170 of 198 Solicitations
1 2 12 13 14 15 17 19 20