OSM 10(6495)101.1
Abandoned Mine Reclamation Project, West Liberty South #1, Brady Township, Butler County
Estimated Amount: $500,000 to $1,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 Each
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 672 L.F.
Clearing and Grubbing, 1 L.S.
Subsurface Drains with Cleanouts, 1,750 L.F.
Grading, 252,589 C.Y.
Planting – Tree Seedlings, 9,318 EACH
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 6%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 05/09/2024 06:00 PM UTC |
OSM 16(1957)101.1
Abandoned Mine Reclamation Project
Mahles Run East
Knox and Washington Townships, Clarion County
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32"Diameter), 1,414 L.F.
Sealing Collapsed Mine Entry, 1 EACH
Subsurface Drain, 494 L.F.
Grading – Grading, 35,543 C.Y.
Seeding – Mulching, 6.8 ACRE
| 05/30/2024 06:00 PM UTC |
Number | Deadline |
---|---|
OSM 17(1083)102.1
Abandoned Mine Reclamation Project,
South Grassflat,
Cooper Township, Clearfield County,
Principle Items of Work and Approximate Quantities:
Clearing and Grubbing JOB
Grading 265,620 C.Y.
Ditch Excavation 4,800 C.Y.
Rolled Erosion Control Products 2,735 S.Y.
Rock Lining 2,490 S.Y.
Alkaline Addition 7,338 TON
Subsurface Drain 875 L.F.
Gate 2 EACH
Access Roadway Surface Material 3,125 S.Y.
Seeding 29.5 ACRE
| 05/18/2017 06:00 PM UTC |