Pennsylvania Department of Environmental Protection
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSM 63(0962)102.1
Abandoned Mine Reclamation Project
Muse Coal Refuse Pile
Cecil Township, Washington County
Estimated Amount: $1,000,000-$5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction
Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32”
Diameter), 1,600 L.F.
Clearing and Grubbing, 10.8 ACRE
Grading, 54,000 C.Y.
Planting – Planting Preparation, 11.8 ACRE
Subsurface Drains, 900 L.F.
Grass Lined Ditches, 1,000 L.F.
Culvert – Culvert C-1, 60 L.F.
Culvert – Headwall, 1 EACH
Demolition and Disposal of Mine Facilities, 5 EACH
Gate, 1 EACH
Alkaline Addition, 3,500 TON
MANDATORY Pre-Bid Training will be held on: August 19, 2025 at 2:00 p.m. FAILURE TO ATTEND THE PRE-BID TRAINING WILL BE CAUSE FOR REJECTION OF THE BID.
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 6%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 09/04/2025 06:00 PM UTC |
OSM 11(2713)102.1
Abandoned Mine Reclamation Project
Ingleside Northeast
Richland Township, Cambria County
Estimated Amount: $1,000,000 to $5,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 7,800 L.F.
Clearing and Grubbing, 44 ACRE
Grading – Grading Area 1A, 54,000 C.Y.
Grading – Grading Area 1B, 56,658 C.Y.
Grading – Grading Area 2, 53,867 C.Y.
Grading – Grading Area 3, 304,510 C.Y.
Planting – Planting Preparation, 44 ACRE
Planting – Tree Seedlings, 27,880 EACH
Subsurface Drain, 930 L.F.
Rock Lined Channel, 506.1 S.Y.
Grass Lined Channel, 373.3 C.Y.
Type 2 Right-of-Way Fence, 1,350 L.F.
| 09/11/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OOGM 18-3
Cleaning Out and Plugging Three (3) Gas Wells in Huston Township, Clearfield County; Contract Estimate Amount $300,000 - $500,000; Term - 180 calendar days; Bid Bond Required; Principal Items of Work and Approximate Quantities are to clean-out and plug three (3) gas wells, estimated to range in depth from 1,507 feet to 7,078 feet to Department specifications, to prepare and restore well sites, and to mobilize and demobilize plugging equipment. A MANDATORY Pre-Bid Conference is scheduled for August 8, 2018 at 10:00 a.m. Meet at the DCNR Moshannon Forest District, District Office, 3372 State Park Road, Penfield, PA 15849. Failure to attend the Pre-Bid Conference will be cause for rejection of the bid.
| 08/23/2018 06:00 PM UTC |
Capital Bus Company
State Lead Project – UST Product and Tank Removal, Harrisburg City, Dauphin County. Estimated Amount: $0 to $100,000 (Small Business Only); Term: 30 Calendar Days; Bid Bond/Contract Bond not required; Small Diverse Business not required; Principal Items of Work and Approximate Quantities: Site Access and Restriction, 1 LS; Removal/Disposal of Residual Liquids from Underground Storage Tank Systems, 8,933 Gallons; Excavation, Removal & Disposal of Underground Storage Tank Systems, 2 LS; Removal/Disposal of Contaminated Soil from Underground Storage Tank Systems, 50 Tons; Backfill: (Stone), 100 Tons; Backfill: (Asphalt), 17 Tons; Project Completion Report, 1 LS. MANDATORY PRE-BID MEETING WILL BE HELD ON AUGUST 14, 2018 AT 10:00 AM AT 1061 SOUTH CAMERON STREET, HARRISBURG, PA 17105. Failure to attend the Pre-Bid Meeting will be cause for rejection of the bid.
| 08/23/2018 06:00 PM UTC |
OOGM 17-4
Cleaning Out and Plugging One (1) Orphan Gas Well in Franklin Park Borough, Allegheny County. Contract Estimate Amount: $200,000 to $300,000 (Small Business Exempted); Term: 70 Calendar Days; Bid Bond Required; Principal Items of Work and Approximate Quantities: Clean-out and plug one (1) orphan gas well, estimated to be approximately 2,000 feet in depth, to Department specifications; Prepare and Restore Well Sites/Site; Mobilize and Demobilize Plugging Equipment. A mandatory pre-bid meeting was held on August 2, 2018 at 10:00 AM at the 2205 McAleer Road, Franklin Park, PA 15143. Only attendees of this meeting are able to bid on this project.
| 08/23/2018 06:00 PM UTC |
OOGM 17-4
Cleaning Out and Plugging One (1) Orphan Gas Well in Franklin Park Borough, Allegheny County. Contract Estimate Amount: $200,000 to $300,000 (Small Business Exempted); Term: 70 Calendar Days; Bid Bond Required; Principal Items of Work and Approximate Quantities: Clean-out and plug one (1) orphan gas well, estimated to be approximately 2,000 feet in depth, to Department specifications; Prepare and Restore Well Sites/Site; Mobilize and Demobilize Plugging Equipment. A mandatory pre-bid meeting will be held on August 2, 2018 at 10:00 AM at the 2205 McAleer Road, Franklin Park, PA 15143. Failure to attend the pre-bid meeting will be cause for rejection of the bid.
| 08/16/2018 06:00 PM UTC |
OOGM 18-1
Cleaning Out and Plugging One (1) Orphan Gas Well in Pike Township, Potter County. Contract Estimate Amount: $0 to $100,000 (Small Business Only); Term: 30 Calendar Days; Bid Bond Required; Principal Items of Work and Approximate Quantities: Clean-out and plug one (1) orphan gas well, estimated to be approximately 2,000 feet in depth, to Department specifications; Prepare and restore well sites/site; Mobilize and demobilize plugging equipment. A pre-bid meeting will be held on July 26, 2018 at 10:00 AM at the intersection of Loucks Mills Road and Hard Scrabble Road, Pike Township, PA 16948 (west of Galeton).
| 08/09/2018 06:00 PM UTC |
OSM 17(0098)101.1
Abandoned Mine Reclamation Project, Boardman – Potts Run No. 3, Knox Township, Clearfield County. Contract Estimate: $1,000,000 to $5,000,000. Term: 270 Calendar Days. Bid Bond required. Principal Items of Work and Approximate Quantities include: Mobilization and Demobilization, 1 L.S.; Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S.; Subsurface Underdrains, 3,150 L.F.; Permanent Access Road and Gate, 2,170 L.F.; Alkaline Addition, 13,200 TON; Construction of Rock Sump, 1,800 TON; Clearing and Grubbing, Grading, Seeding, Tree Planting Preparation and Tree Planting, 23.7 ACRE.
| 07/26/2018 06:00 PM UTC |
OOGM 17-3R
Cleaning Out and Plugging Two (2) Abandoned Oil and Gas Wells in Concord and Jefferson Townships, Butler County. Contract Estimate Amount: $0 to $100,000 (Small Business Only); Term: 60 Calendar Days; Bid Bond Required; Principal Items of Work and Approximate Quantities: clean-out and plug two (2) abandoned oil and gas wells, estimated to be 1,600 feet and 2,000 feet in depth, to Department specifications; prepare and restore well sites/site; and mobilize and demobilize plugging equipment. A pre-bid meeting will be held on June 8, 2018 at 10:00 AM at 3 C's Pizza, 1252 West Sunbury Road, West Sunbury, PA 16061.
| 06/21/2018 06:00 PM UTC |
OSM 13,40(3202,3204)101.1
Abandoned Mine Reclamation Project, Beaver Brook East/Beaver Brook South, Hazle and Banks Townships, Luzerne and Carbon Counties. Contract Estimate: $100,000 to $200,000 (Small Business Only). Term: 120 Calendar Days. Bid Bond required. Principal Items of Work and Approximate Quantities include: Clearing and Grubbing 5.1 AC; Grading 44,000 CY; Drainage Excavation 936 CY; Rock Lining 962 SY.
| 05/03/2018 06:00 PM UTC |
OOGM 17-1R
Cleaning Out and Plugging One (1) Orphan Gas Well in East Keating Township, Clinton County. Contract Estimate: $100,000 to $200,000 (Small Business Only). Term: 60 Calendar Days. Bid Bond Required. Principle Items of Work and Approximate Quantities: clean out and plug one (1) orphan gas well, estimated to be 6,000 feet in depth, to Department specifications; prepare and restore well sites/site; and mobilize and demobilize plugging equipment. MANDATORY PRE-BID meeting will be held on April 18, 2018 at 10:00 A.M. at DCNR Sproul Forest District, 15187 Renovo Road, Renovo, PA 17764. FAILURE TO ATTEND THE PRE-BID CONFERENCE WILL BE CAUSE FOR REJECTION OF THE BID.
| 05/01/2018 06:00 PM UTC |
OSM 11(0854)101.1
Abandoned Mine Reclamation Project, Glasgow Northeast Waterline Extension, Reade Township, Cambria County; Contract Estimate Amount: $500,000 to $1,000,000; Term: 120 Calendar Days; Bid Bond Required; Principle Items of Work and Approximate Quantities: Installation of Six-Inch (6”) PVC Pipe Including Fittings, 6,800 L.F.; Service Lateral Connections, 5 Each; Roadway Crossings, 1 Each; Typical Above Ground Blow-Off Assembly, 1 Each; Hydrant Blow-Off Assembly, 1 Each; Roadway Crossings, 20 L.F.; Six-Inch (6”) Meter and Vault, 1 Each.
| 04/26/2018 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.