General Info

Business Logo

Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSM 63(0962)102.1
Abandoned Mine Reclamation Project Muse Coal Refuse Pile Cecil Township, Washington County Estimated Amount: $1,000,000-$5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 1,600 L.F. Clearing and Grubbing, 10.8 ACRE Grading, 54,000 C.Y. Planting – Planting Preparation, 11.8 ACRE Subsurface Drains, 900 L.F. Grass Lined Ditches, 1,000 L.F. Culvert – Culvert C-1, 60 L.F. Culvert – Headwall, 1 EACH Demolition and Disposal of Mine Facilities, 5 EACH Gate, 1 EACH Alkaline Addition, 3,500 TON MANDATORY Pre-Bid Training will be held on: August 19, 2025 at 2:00 p.m. FAILURE TO ATTEND THE PRE-BID TRAINING WILL BE CAUSE FOR REJECTION OF THE BID. READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 6%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
09/04/2025 06:00 PM UTC
OSM 11(2713)102.1
Abandoned Mine Reclamation Project Ingleside Northeast Richland Township, Cambria County Estimated Amount: $1,000,000 to $5,000,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 7,800 L.F. Clearing and Grubbing, 44 ACRE Grading – Grading Area 1A, 54,000 C.Y. Grading – Grading Area 1B, 56,658 C.Y. Grading – Grading Area 2, 53,867 C.Y. Grading – Grading Area 3, 304,510 C.Y. Planting – Planting Preparation, 44 ACRE Planting – Tree Seedlings, 27,880 EACH Subsurface Drain, 930 L.F. Rock Lined Channel, 506.1 S.Y. Grass Lined Channel, 373.3 C.Y. Type 2 Right-of-Way Fence, 1,350 L.F.
09/11/2025 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OOGM 18-3
Cleaning Out and Plugging Three (3) Gas Wells in Huston Township, Clearfield County; Contract Estimate Amount $300,000 - $500,000; Term - 180 calendar days; Bid Bond Required; Principal Items of Work and Approximate Quantities are to clean-out and plug three (3) gas wells, estimated to range in depth from 1,507 feet to 7,078 feet to Department specifications, to prepare and restore well sites, and to mobilize and demobilize plugging equipment. A MANDATORY Pre-Bid Conference is scheduled for August 8, 2018 at 10:00 a.m. Meet at the DCNR Moshannon Forest District, District Office, 3372 State Park Road, Penfield, PA 15849. Failure to attend the Pre-Bid Conference will be cause for rejection of the bid.
08/23/2018 06:00 PM UTC
Capital Bus Company
State Lead Project – UST Product and Tank Removal, Harrisburg City, Dauphin County. Estimated Amount: $0 to $100,000 (Small Business Only); Term: 30 Calendar Days; Bid Bond/Contract Bond not required; Small Diverse Business not required; Principal Items of Work and Approximate Quantities: Site Access and Restriction, 1 LS; Removal/Disposal of Residual Liquids from Underground Storage Tank Systems, 8,933 Gallons; Excavation, Removal & Disposal of Underground Storage Tank Systems, 2 LS; Removal/Disposal of Contaminated Soil from Underground Storage Tank Systems, 50 Tons; Backfill: (Stone), 100 Tons; Backfill: (Asphalt), 17 Tons; Project Completion Report, 1 LS. MANDATORY PRE-BID MEETING WILL BE HELD ON AUGUST 14, 2018 AT 10:00 AM AT 1061 SOUTH CAMERON STREET, HARRISBURG, PA 17105. Failure to attend the Pre-Bid Meeting will be cause for rejection of the bid.
08/23/2018 06:00 PM UTC
OOGM 17-4
Cleaning Out and Plugging One (1) Orphan Gas Well in Franklin Park Borough, Allegheny County. Contract Estimate Amount: $200,000 to $300,000 (Small Business Exempted); Term: 70 Calendar Days; Bid Bond Required; Principal Items of Work and Approximate Quantities: Clean-out and plug one (1) orphan gas well, estimated to be approximately 2,000 feet in depth, to Department specifications; Prepare and Restore Well Sites/Site; Mobilize and Demobilize Plugging Equipment. A mandatory pre-bid meeting was held on August 2, 2018 at 10:00 AM at the 2205 McAleer Road, Franklin Park, PA 15143. Only attendees of this meeting are able to bid on this project.
08/23/2018 06:00 PM UTC
OOGM 17-4
Cleaning Out and Plugging One (1) Orphan Gas Well in Franklin Park Borough, Allegheny County. Contract Estimate Amount: $200,000 to $300,000 (Small Business Exempted); Term: 70 Calendar Days; Bid Bond Required; Principal Items of Work and Approximate Quantities: Clean-out and plug one (1) orphan gas well, estimated to be approximately 2,000 feet in depth, to Department specifications; Prepare and Restore Well Sites/Site; Mobilize and Demobilize Plugging Equipment. A mandatory pre-bid meeting will be held on August 2, 2018 at 10:00 AM at the 2205 McAleer Road, Franklin Park, PA 15143. Failure to attend the pre-bid meeting will be cause for rejection of the bid.
08/16/2018 06:00 PM UTC
OOGM 18-1
Cleaning Out and Plugging One (1) Orphan Gas Well in Pike Township, Potter County. Contract Estimate Amount: $0 to $100,000 (Small Business Only); Term: 30 Calendar Days; Bid Bond Required; Principal Items of Work and Approximate Quantities: Clean-out and plug one (1) orphan gas well, estimated to be approximately 2,000 feet in depth, to Department specifications; Prepare and restore well sites/site; Mobilize and demobilize plugging equipment. A pre-bid meeting will be held on July 26, 2018 at 10:00 AM at the intersection of Loucks Mills Road and Hard Scrabble Road, Pike Township, PA 16948 (west of Galeton).
08/09/2018 06:00 PM UTC
OSM 17(0098)101.1
Abandoned Mine Reclamation Project, Boardman – Potts Run No. 3, Knox Township, Clearfield County. Contract Estimate: $1,000,000 to $5,000,000. Term: 270 Calendar Days. Bid Bond required. Principal Items of Work and Approximate Quantities include: Mobilization and Demobilization, 1 L.S.; Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S.; Subsurface Underdrains, 3,150 L.F.; Permanent Access Road and Gate, 2,170 L.F.; Alkaline Addition, 13,200 TON; Construction of Rock Sump, 1,800 TON; Clearing and Grubbing, Grading, Seeding, Tree Planting Preparation and Tree Planting, 23.7 ACRE.
07/26/2018 06:00 PM UTC
OOGM 17-3R
Cleaning Out and Plugging Two (2) Abandoned Oil and Gas Wells in Concord and Jefferson Townships, Butler County. Contract Estimate Amount: $0 to $100,000 (Small Business Only); Term: 60 Calendar Days; Bid Bond Required; Principal Items of Work and Approximate Quantities: clean-out and plug two (2) abandoned oil and gas wells, estimated to be 1,600 feet and 2,000 feet in depth, to Department specifications; prepare and restore well sites/site; and mobilize and demobilize plugging equipment. A pre-bid meeting will be held on June 8, 2018 at 10:00 AM at 3 C's Pizza, 1252 West Sunbury Road, West Sunbury, PA 16061.
06/21/2018 06:00 PM UTC
OSM 13,40(3202,3204)101.1
Abandoned Mine Reclamation Project, Beaver Brook East/Beaver Brook South, Hazle and Banks Townships, Luzerne and Carbon Counties. Contract Estimate: $100,000 to $200,000 (Small Business Only). Term: 120 Calendar Days. Bid Bond required. Principal Items of Work and Approximate Quantities include: Clearing and Grubbing 5.1 AC; Grading 44,000 CY; Drainage Excavation 936 CY; Rock Lining 962 SY.
05/03/2018 06:00 PM UTC
OOGM 17-1R
Cleaning Out and Plugging One (1) Orphan Gas Well in East Keating Township, Clinton County. Contract Estimate: $100,000 to $200,000 (Small Business Only). Term: 60 Calendar Days. Bid Bond Required. Principle Items of Work and Approximate Quantities: clean out and plug one (1) orphan gas well, estimated to be 6,000 feet in depth, to Department specifications; prepare and restore well sites/site; and mobilize and demobilize plugging equipment. MANDATORY PRE-BID meeting will be held on April 18, 2018 at 10:00 A.M. at DCNR Sproul Forest District, 15187 Renovo Road, Renovo, PA 17764. FAILURE TO ATTEND THE PRE-BID CONFERENCE WILL BE CAUSE FOR REJECTION OF THE BID.
05/01/2018 06:00 PM UTC
OSM 11(0854)101.1
Abandoned Mine Reclamation Project, Glasgow Northeast Waterline Extension, Reade Township, Cambria County; Contract Estimate Amount: $500,000 to $1,000,000; Term: 120 Calendar Days; Bid Bond Required; Principle Items of Work and Approximate Quantities: Installation of Six-Inch (6”) PVC Pipe Including Fittings, 6,800 L.F.; Service Lateral Connections, 5 Each; Roadway Crossings, 1 Each; Typical Above Ground Blow-Off Assembly, 1 Each; Hydrant Blow-Off Assembly, 1 Each; Roadway Crossings, 20 L.F.; Six-Inch (6”) Meter and Vault, 1 Each.
04/26/2018 06:00 PM UTC
141 - 150 of 171 Solicitations
1 2 10 11 12 13 15 17 18