General Info

Business Logo

Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OOGM FS25-6
Cleaning Out and Plugging Six (6) Orphan Gas Wells Center Township, Butler County Estimated Amount: $300,000-$500,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug six (6) orphan gas wells, estimated to be 1700 to 2200 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: February 4, 2026, at 10:00 a.m. Department representatives will meet contractors at: Adelman Fields 299 Old Plank Road Butler, PA Meet in parking lot of baseball field. 40.824529, -79.909805 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
02/26/2026 07:00 PM UTC
OOGM FS25-4
Cleaning Out and Plugging Three (3) Orphan Gas Wells Allegheny Township, Westmoreland County Estimated Amount: $300,000-$500,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug three (3) orphan gas wells, estimated to be 3500-4000 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: February 18, 2026, at 10:00 a.m. Department representatives will meet contractors at: Baseball Field #4, 236 Air Shaft Road, Apollo, PA 15613, 40.580182, -79.620358. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
03/26/2026 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OSM 17(6483)101.1
Water Main Extension Project, Pine Grove North (Glen Richey) Waterline, Lawrence Township, Clearfield County; Estimated Amount: $1,000,000 to $5,000,000; Term: 365 calendar days; Bid Bond Required; Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 1 L.S.; Site Preparation and Restoration, 1 L.S.; Eight-Inch (8”) and Six-Inch (6”) PVC Pipe Including Fittings, 70,500 L.F.; Eight-Inch (8”) and Six-Inch (6”) Gate Valve and Roadway Valve Box, 70 EACH; 2A Stone, 20,445 C.Y.; Service Lateral Connections, 151 EACH; Highway Crossing Boring, 300 L.F.; Repaving - Twenty-Five (25) mm Superpave Base Course, 2,000 TON; Repaving - Nine (9) mm Superpave Wearing Course, 7,300 S.Y.; SR-153 Krebbs Highway Pressure Reducing Vault, 1 EACH; Bolted Stainless-Steel Water Storage Tank Including Foundation, 1 L.S.; Packaged Water Booster Pumping Station Complete, 1 L.S.
01/25/2018 07:00 PM UTC
OOGM 17-1
Cleaning Out and Plugging One (1) Orphan Gas Well, East Keating Township, Clinton County; Estimated Amount: $100,000 to $200,000 (Small Business Only); Term: 20 calendar days; Bid Bond required; Principal Items of Work and Approximate Quantities: Clean out and plug one (1) orphan gas well, estimated to be 6,000 feet in depth, to Department specifications; Prepare and restore well sites/site; and Mobilize and demobilize plugging equipment. A MANDATORY PRE-BID CONFERENCE WILL BE HELD ON JANUARY 4, 2018 AT 10:00 A.M. AT DCNR, SPROUL FOREST DISTRICT, 15187 RENOVO ROAD, RENOVO, PA 17764.
01/25/2018 07:00 PM UTC
AMD 54(4124)105.1
Abandoned Mine Reclamation Project, Rausch Creek Treatment Plant Upgrades, Hegins Township, Schuylkill County; Estimated Amount: $300,000-$500,000; Term: 300 calendar days; Bid Bond Required; Principle Items of Work and Approximate Quantities include: To replace certain pieces of equipment associated with the Rausch Creek Acid Mine Drainage Treatment Plant. Specifically, the standby generator, polymer mixing and distribution pumping system, and certain components of the plant water system are to be replaced. Much of the old equipment will be demolished and disposed of, including the 125-foot-tall elevated 100,000-gallon water storage tank. A MANDATORY PRE-BID MEETING WILL BE HELD ON NOVEMBER 7, 2017 at 11:00AM, Rausch Creek AMD Treatment Plant, 315 Schwenks Road, Valley View, PA 17983-0758.
12/21/2017 07:00 PM UTC
OSM 13(3206)101.1
Abandoned Mine Reclamation Project, Tresckow South, Banks Township, Carbon County; Estimated Amount $1,000,000 to $5,000,000; Term 720 calendar days; Bid Bond Required; Principle Items of Work and Approximate Quantities include Clearing and Grubbing 177.6 AC, Grading 1,937,857 CY, Drainage Excavation 8,066 CY, Granular Sodium Bentonite Clay Lining 605 TON.
12/19/2017 07:00 PM UTC
OSM 26(2783)101.1
Abandoned Mine Reclamation Project, Everson, Upper Tyrone Township, Fayette County; Estimate Amount $300,000 to $500,000; Term 120 calendar days; Bid Bond required. Principle Items of Work and Approximate Quantities: Overburden Drilling and Casing, 675 L.F.; Four-Inch (4") Air Rotary Drilling, 702 L.F.; Four-Inch (4") Nominal Steel or PVC Injection Casing, 253 L.F.; Injection of Grout Material, 2,851 TON.
11/30/2017 07:00 PM UTC
OSM 54(3103)103.1
Abandoned Mine Reclamation Project, Quick Subsidence – Phase 2 Drilling, Mahanoy Township, Schuylkill County, Estimated Amount: $500,000 to $1,000,000, Term: 120 calendar days, Bid Bond Required, Principal Items of Work and Approximate Quantities: Clearing and Grubbing, 4,840 S.Y.; Vertical Air Rotary Drilling to Accommodate Four-Inch (4”) Casing, 1,773 L.F.; Four-Inch (4”) I.D. Steel or PVC Casing, 1,122 L.F.; Fill Material Injection – Flowable Fill Material Through Boreholes, 500 C.Y.; Fill Material Injection – Concrete Fill Material Through Boreholes, 500 C.Y.; Grading, 2,300 C.Y.; Geosynthetic Clay Liner, 605 S.Y.; Topsoil, 440 TON; Seeding, 6,480 S.Y.
11/28/2017 07:00 PM UTC
OSM 26(4734)102.1
Abandoned Mine Reclamation Project, Gans Hill School, Springhill Township, Fayette County. Estimated Amount: $0 to $100,000 (Small Business Only). Term: 180 calendar days. Bid Bond Required. Principal Items of Work and Approximate Quantities include Clearing and Grubbing, 1 LS; Grading, 28,000 CY; Seed, 192 LB; Commercial Fertilizer, 640 LB; Agricultural Limestone, 12.8 TON; Mulching, 3.2 ACRE.
11/02/2017 06:00 PM UTC
OSM 16(2826)101.1
Abandoned Mine Reclamation Project, Fairmount City, Redbank Township, Clarion County; NO Mandatory Pre-Bid Meeting; Estimate $300,000 - $500,000; Term - 270 Calendar Days; Bid Bond Required. Principal Items of Work and Approximate Quantities: Underground Storage Tank Removal, 1 LS; Demolition, Removal and Disposal of Mine Structures, 1 LS; Mine Drain, 1,500 LF; Sealing Mine Entries, 2 Each; Grading, 10,761 CY; Alkaline Addition, 910 Ton; Six-Inch (6") Thick Soil Cover, 2,936 CY.
08/31/2017 06:00 PM UTC
OSM 33(1147)101.1
Abandoned Mine Reclamation Project, Sykesville, Sykesville Borough, Jefferson County. Principal Items of Work and Approximate Quantities: Twelve-Inch (12") Subsurface Drains with Cleanouts, 206 L.F.; Cast-In-Place Inlet Box, 1 Each; Sidewalk Replacement, 40 S.Y.; Pavement Replacement, 45 S.Y. Contract estimate $0 to $100,000 (Small Business Only). Term: 150 calendar days. Bid Bond Required.
08/24/2017 06:00 PM UTC
OSM 04(4460)101.1
Abandoned Mine Reclamation Project, Homewood Southeast, North Sewickley Township, Beaver County, Contract Estimate Amount $300,000 - $500,000, Term: 270 Calendar Days, Principal Items of Work and Approx Quantities: Subsurface Drains with Cleanouts, 1,200 L.F.; Grading, 136,000 C.Y.; Erosion Matting, 2,230 S.Y.; Rock Lining, 780 S.Y.; Greer Property Drainage Conveyance, 1 L.S.; Construction of Bat Gate, 85 L.F.; Seeding, 18.4 Acres.
08/08/2017 06:00 PM UTC
181 - 190 of 195 Solicitations
1 2 12 13 14 15 16 17 19