Pennsylvania Department of Environmental Protection
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSM 61(0807,6967)101.1
Abandoned Mine Reclamation Project
Smith Corners
Clinton Township, Venango County
Estimated Amount: $500,000 to $1,000,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction
Entrance, 3 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32”
Diameter), 4,650 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter
Tube,145 L.F.
Clearing and Grubbing, 23.1 ACRE
Grading – Grading Area 1, 24,450 C.Y.
Grading – Grading Area 2, 141,209 C.Y.
Grading – Grading Area 3, 13,626 C.Y.
Grading – Ripping, 15.2 ACRE
Planting – Planting Preparation, 23.1 ACRE
Planting – Tree Seedlings, 10,345 EACH
Planting – Grass Seed, 240 LB.
Subsurface Drain, 1,990 L.F.
Permanent Channel Excavation, 208 C.Y.
Erosion Matting, 767 S.Y.
Selective Grading, 200 ACRE
Implementation of the Traffic Control Plan, 1 L.S.
| 06/04/2026 06:00 PM UTC |
|
OSM 17(6425)101.1
Abandoned Mine Reclamation Project
Keewaydin
Covington and Karthaus Townships, Clearfield County
Estimated Amount: $1,000,000-$5,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (24” Diameter), 2,580 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 4,370 L.F.
Clearing and Grubbing, 20 ACRE
Demolition, Removal and Disposal of Buildings and Equipment, 1 L.S.
Dewatering and Diversion and Care of Water, 1 L.S.
Stream Crossings - Stream Crossing 1 - Rock Ford, 200 TON
Stream Crossings - Stream Crossing 2 - 60" RCEP, 50 L.F.
Stream Crossings - Stream Crossing 2 - R-6 Rock, 50 S.Y.
Stream Crossings - Stream Crossing 2 - 2A Aggregate, 90 C.Y.
Stream Crossings - Stream Crossing 3 - 72" RCEP, 150 L.F.
Stream Crossings - Stream Crossing 3 - R-6 Rock, 180 S.Y.
Stream Crossings - Stream Crossing 3 - 2A Aggregate, 230 C.Y.
Special Handling of Refuse Material - Baghouse Lime, 2,700 TON
Special Handling of Refuse Material - Placement of Refuse Mixture, 42,420 C.Y.
Grading – Grading, 70,000 C.Y.
Grading – Ripping, 10 ACRE
Selective Grading, 10 ACRE
Access Road, 2,600 L.F.
Planting/Seeding - Planting Preparation, 20 ACRE
Planting/Seeding - Tree Seedlings, 6,800 EACH
| 06/04/2026 06:00 PM UTC |
|
OOGM FS26-3
Cleaning Out and Plugging One (1) Abandoned Gas Well
Moon Township, Allegheny County
Estimated Amount: $100,000-$200,000 (Small Business Only)
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug one (1) abandoned gas well, estimated to be approximately 2000’ feet in depth, to Department specifications.
Prepare and restore well site
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: May 13, 2026, at 10:00 a.m.
Department representatives will meet contractors at:
Robert Morris University
Parking Area on Colonial Way (Next to Baseball Field)
40.523194, -80.210583
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 06/18/2026 06:00 PM UTC |
|
OSM 05(2002,7054)101.1
Abandoned Mine Reclamation Project
Kimber Mountain NW
Broad Top Township, Bedford County
Estimated Amount: Greater than $5,000,000
Term: 730 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 4 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 17,674 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Riprap Apron, 89 S.Y.
Clearing and Grubbing – Grading Area 1, 79.0 ACRE
Clearing and Grubbing – Grading Area 2, 17.2 ACRE
Clearing and Grubbing – Grading Area 3, 7.4 ACRE
Clearing and Grubbing – Grading Area 4, 1.9 ACRE
Clearing and Grubbing – Grading Area 5, 35.6 ACRE
Clearing and Grubbing – Grading Area 6, 7.5 ACRE
Access Road – New Road Construction, 1,826 L.F.
Access Road – Install Two-Inch (2”) PennDOT 2A on all roads at end of project, 2,229 TON
Subsurface Drain, 3,844 L.F.
Dewatering Impoundments, 1 L.S.
Grading – Grading Area 1, 1,133,874 C.Y.
Grading – Grading Area 2, 114,232 C.Y.
Grading – Grading Area 3, 33,166 C.Y.
Grading – Grading Area 4, 8,618 C.Y.
Grading – Grading Area 5, 490,907 C.Y.
Grading – Grading Area 6, 68,351 C.Y.
Permanent Channel Excavation, 360 C.Y.
Rock Lining, 2,436 S.Y.
Seeding – Seed Bed Preparation, 148.6 ACRE
Seeding – Seed, 6,241 LB.
Woodrat Mitigation Structures, 9 EACH
MANDATORY Pre-Bid Conference will be held on: June 1, 2026, at 9:00 a.m.
Department representatives will meet contractors at: 40°07'23.19"N 78°14'20.28"W
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 06/18/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSM 02(0835)102.1
Abandoned Mine Reclamation Project
Eastmont Swim Club
Wilkins Township, Allegheny County
Estimated Amount: $200,000 to $299,999 (Small Business Only)
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 1 L.S.
Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S.
Trench Excavation 400 C.Y.
Subsurface Drain – Eight-Inch (8”) Nominal Diameter PVC SDR-35 Pipe, 450 L.F.
Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 400 C.Y.
Segmented Retaining Wall with Geogrid Reinforcement, 400 S.F.
Patio Replacement, 20 S.Y.
| 09/09/2021 06:00 PM UTC |
|
OSM 26(4702)101.1
Abandoned Mine Reclamation Project, Full Gospel Church, Stewart Township, Fayette County.
Estimated Amount: $500,000 to $1,000,000
Term: 360 calendar days
Bid Bond Required
NO GOALS WERE DETERMINED FOR THIS PROJECT. ATTACHMENT A HAS BEEN OMITTED.
Principal Items of Work and Approximate Quantities:
Clearing and Grubbing 1 Lump Sum; Grading (A) Grading Area A 135,900 C.Y. (B) Grading Area B 44,900 C.Y.; Access Roadway and Parking Lot (A) Roadway Surface Material 925 S.Y. (B) Utility Pole Parking Stop 48 L.F.; Tree Planting 13,260 EACH; Furrow Ripping 10 ACRE; Deer Fencing 6,000 L.F.;
Seeding 1 ACRE; ARRI Seeding 19.5 ACRE.
| 07/22/2021 06:00 PM UTC |
|
OSM 11(3266)102.1
Abandoned Mine Reclamation Project, Cymbria II, Susquehanna Township, Cambria County.
Estimated Amount: $300,000 to $500,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clearing and Grubbing, 20.2 Acre; Permanent Swales with R-4 Rock Check Dams, 1,070 L.F.; Grading, 169,119 C.Y.; Tree Planting, 11,450 Tree.
*There are no goal requirements for this project.
Please note: Contract Drawing 5 of 6 for the Permanent Swales W/ Rock Check Dams should read “ To be lined with erosion matting which shall be Curlex II as manufactured by American Excelsior Company, 850 Avenue H East Arlington, TX 76011 or approved equivalent . Telephone 817-385-3500”.
| 07/08/2021 06:00 PM UTC |
|
OSM 02(1726,0385)103.1
Abandoned Mine Reclamation Project, Penn Hills, Municipality of Penn Hills, Allegheny County.
Estimated Amount: $300,000 to $500,000
Term: 270 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Trench Excavation, 1,165 C.Y.; Smooth Interior Corrugated Polyethylene Pipe, 300 L.F.; Smooth Interior Corrugated Polyethylene Pipe Junction, 12 Each; Rock Lining with Geotextile, 415 Ton; Precast Concrete Inlet Box, 1 Each; PA DOT 2A Stone, 100 C.Y.; Boring - Twenty-four-inch (24”) Steel Casing, 275 L.F.; Subsurface Drain - Twelve-inch (12”) Polyvinyl Chloride (PVC) Pipe, 310 L.F.; Subsurface Drain - Eight-inch (8”) Polyvinyl Chloride (PVC) Pipe, 975 L.F.; Subsurface Drain - AASHTO No. 1 Coarse Aggregate, 860 C.Y.
*There are no goal requirements for this project.
| 07/08/2021 06:00 PM UTC |
|
OSM 32(3246)101.1
Abandoned Mine Reclamation Project
Upper Two Lick West
White Township, Indiana County
Estimated Amount: $500,000 to $1,000,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Eight-Inch (8”) PVC Pipe Including Fittings – 1,250 LF
Eight-Inch (8”) Ductile Iron Pipe Including Fittings – 2,900 LF
Six-Inch (6”) Ductile Iron Pipe Including Fittings – 2,075 LF
Service Lateral Connections - Three-Quarter Inch (3/4") Service – 22 Each
Gas Line Crossing – 150 LF
Stream Crossing – 120 LF
Two-Inch (2”) Automatic Air Release Valve – 3 Each
Typical Above Ground Blow-Off Assembly – 3 Each
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
*Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 5%, VBE - 3%.
If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1.
If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5).
If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5).
Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule.
Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 06/03/2021 06:00 PM UTC |
|
OSM 17(0846)101.1
Abandoned Mine Reclamation Project
Waltzvale West
Gulich and Bigler Townships, Clearfield County
Estimated Amount: $500,000 to $1,000,000
Term: 360 calendar days
Bid Bond Required
NO GOALS WERE DETERMINED FOR THIS PROJECT. ATTACHMENT A HAS BEEN OMITTED.
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 1 L.S.
Implementation of the Erosion and Sediment Pollution Control Plan –
Compost Filter Sock (32” Diameter), 5,000 L.F.
Subsurface Drains with Cleanouts, 350 L.F.
Grading, 220,000 C.Y.
Channel Excavation, 1,400 C.Y.
Rock Lining with Filter Blanket, 650 S.Y.
Seeding – Seed Bed Preparation, 29 Acres
Seeding - Tree Seedlings (25 acres), 17,010 Each
| 05/27/2021 06:00 PM UTC |
|
OOGM 20-3
Cleaning Out and Plugging Six Abandoned Wells
Sugarcreek Borough, Venango County
Estimated Amount: $200,000 to $299,999 (Small Business Only)
Term: 180 calendar days
Bid Bond NOT Required
Principal Items of Work and Approximate Quantities:
Clean out and plug six (6) abandoned wells, estimated to be up to 1,000 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY PRE-BID CONFERENCE:
May 13, 2021 at 9am
Sugar Valley Lodge
323 Causeway Drive
Franklin, PA 16323
FAILURE TO ATTEND THE PRE-BID CONFERENCE WILL BE CAUSE FOR REJECTION OF THE BID.
| 05/27/2021 06:00 PM UTC |
|
OOGM 20-2
Cleaning Out and Plugging One Abandoned Well in Ross Township, Allegheny County.
MANDATORY PRE-BID MEETING SCHEDULED FOR MARCH 25, 2021 AT 10:00 AM. MEET DEP REP AT 129 MAYER DRIVE IN PITTSBURGH, PA 15237.
Estimated Amount of Project: $200,000 to $299,999 (Small Business Only); Term: 120 calendar days; Bid Bond NOT Required.
Principal Items of Work: Clean out and plug one (1) abandoned well, estimated to be up to 3,000 feet in depth, to Department specifications; prepare and restore well site; mobilize and demobilize plugging equipment.
| 04/15/2021 06:00 PM UTC |
|
OSM 32(4806)102.1
Abandoned Mine Reclamation Project, Canoe Ridge South, Canoe Township, Indiana County. Estimated Amount: $100,000 to $200,000 (Small Business Only). Term 360 calendar days. Bid Bond Required.
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 1 L.S.; Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (Eighteen-Inch [18"] Diameter), 2,000 L.F.; Grading, 48,000 C.Y.; Seeding, 9 Acres.
| 03/25/2021 06:00 PM UTC |
|
OSM 18(1123,6679)101.1
Abandoned Mine Reclamation Project, Huling Branch East
Noyes and Leidy Townships, Clinton County
Estimated Amount: Greater than $5,000,000
Term: 455 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
AMD Subsurface Underdrains and AMD Subsurface Treatment Cell
Perforated Twelve-Inch (12") PE pipe, 3,265 L.F.
AMD Subsurface Underdrains and AMD Subsurface Treatment Cell
Solid Twelve-Inch (12") PE pipe, 130 L.F.
AMD Subsurface Underdrains and AMD Subsurface Treatment Cell
AASHTO No. 1 Calcareous Coarse Aggregate, 13,112 Ton
AMD Subsurface Underdrains and AMD Subsurface Treatment Cell
Calcareous Modified 2A Aggregate, 500 Ton
AMD Subsurface Underdrains and AMD Subsurface Treatment Cell
Non-Calcareous AASHTO No. 1 Coarse Aggregate, 7,155 Ton
AMD Subsurface Underdrains and AMD Subsurface Treatment Cell
Ethylene-Propylene-Diene Terpolmer (EPDM) Impervious Lining, 9,496 S.Y.
Revamped Treatment Pond
Coal Refuse Removal, 12,500 C.Y.
Revamped Treatment Pond
Ethylene-Propylene-Diene Terpolymer (EPDM) Impervious Lining, 5,393 S.Y.
Fence, 1,300 L.F.
Alkaline Addition (Limestone Screenings), 50,800 Ton
Grading, 450,481 C.Y.
Reconstruct Recreational Trails, 5,610 L.F.
Forestland Preparation for the Forest Reclamation Approach Backfill, 18.8 Acre
Tree Planting, 16,750 Tree
Seeding - Wildlife Habitat – Mulching, 22.9 Acre
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
*Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 7%, VBE - 3%.
If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1.
If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5).
If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5).
Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule.
Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 02/18/2021 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.