General Info

Business Logo

Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
AMD 11(2568)102.1
Passive Treatment Rehabilitation Project Bellwood Reservoir North Reade Township, Cambria County Estimated Amount: $1,000,000 to $5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Mobilization and Demobilization. 1 L.S. Implementation of the Erosion and Sediment Plan – Rock Construction Entrance, 1 Each Implementation of the Erosion and Sediment Plan – Compost Filter Sock, 1 Each Clearing and Grubbing (approximately 7.5 acres) Grading Limestone coarse Aggregate (approximately 7,500 tons) Water Level Control Structures Settling Pond Baffles
10/08/2026 06:00 PM UTC
OOGM FS26-4
Cleaning Out and Plugging Eight (8) Orphan Gas Wells Foster and Otto Townships, McKean County Estimated Amount: $500,000 to $1,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug eight (8) orphan gas wells, estimated to be 1,200 to 1,600 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: September 15, 2026 at 10:00 a.m. Department representatives will meet contractors at: Otto Township VFD Station 9 118 R L Sweitzer Drive Duke Center, PA 16729 41.939576, -78.475261 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
10/15/2026 06:00 PM UTC
OOGM FS26-7
Cleaning Out and Plugging Two (2) Orphan Gas Wells Washington Township Greene County Estimated Amount: $300,000 to $500,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug two (2) orphan gas wells, estimated to be 3,000-6,000 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: September 23, 2026, at 10:00 a.m. Department representatives will meet contractors at: The entrance of EQT’s Good Well Pad 39.99039277, -80.1700023 374 Craynes Run Road Waynesburg, Pennsylvania 15370 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
10/29/2026 06:00 PM UTC
OOGM FS26-6
Cleaning Out and Plugging Twenty-Three (23) Orphan Gas Wells Mahoning and Redbank Townships, Armstrong County Porter and Redbank Townships, Clarion County Estimated Amount: $1,000,000 to $5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug twenty-three (23) orphan gas wells, estimated to be 1,000-3,600 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: October 7, 2026, and October 8, 2026, at 9:00 a.m. Department representatives will meet contractors at: Gumtown Memorial Park 240 Water Street New Bethlehem, PA 16242 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
11/12/2026 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSM 18(1123,6679)101.1
Abandoned Mine Reclamation Project, Huling Branch East Noyes and Leidy Townships, Clinton County Estimated Amount: Greater than $5,000,000 Term: 455 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: AMD Subsurface Underdrains and AMD Subsurface Treatment Cell Perforated Twelve-Inch (12") PE pipe, 3,265 L.F. AMD Subsurface Underdrains and AMD Subsurface Treatment Cell Solid Twelve-Inch (12") PE pipe, 130 L.F. AMD Subsurface Underdrains and AMD Subsurface Treatment Cell AASHTO No. 1 Calcareous Coarse Aggregate, 13,112 Ton AMD Subsurface Underdrains and AMD Subsurface Treatment Cell Calcareous Modified 2A Aggregate, 500 Ton AMD Subsurface Underdrains and AMD Subsurface Treatment Cell Non-Calcareous AASHTO No. 1 Coarse Aggregate, 7,155 Ton AMD Subsurface Underdrains and AMD Subsurface Treatment Cell Ethylene-Propylene-Diene Terpolmer (EPDM) Impervious Lining, 9,496 S.Y. Revamped Treatment Pond Coal Refuse Removal, 12,500 C.Y. Revamped Treatment Pond Ethylene-Propylene-Diene Terpolymer (EPDM) Impervious Lining, 5,393 S.Y. Fence, 1,300 L.F. Alkaline Addition (Limestone Screenings), 50,800 Ton Grading, 450,481 C.Y. Reconstruct Recreational Trails, 5,610 L.F. Forestland Preparation for the Forest Reclamation Approach Backfill, 18.8 Acre Tree Planting, 16,750 Tree Seeding - Wildlife Habitat – Mulching, 22.9 Acre READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. *Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 7%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
02/18/2021 07:00 PM UTC
OSM 17(0111)101.1
Abandoned Mine Reclamation Project Madera North Side, Bigler Township, Clearfield County Estimated Amount: $200,000 to $299,999 (Small Business Only) Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 1 L.S. Diversion and Care of Water, 1 L.S. Trench Excavation, 600 C.Y. Subsurface Drain – Pipe, 500 L.F. Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 500 C.Y. Repaving – Base Course, 77 TON Repaving – Binder Course, 40 TON Traffic Control, 1 L.S. Office Facility, 1 L.S.
02/04/2021 07:00 PM UTC
OSM 11(2464)103.1
Abandoned Mine Reclamation Project Vintondale Refuse Pile Reclamation Vintondale Borough, Cambria County Estimated Amount: $1,000,000 to $5,000,000 Term: 910 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Preparation and Implementation of the Erosion and Sediment Pollution Control Plan and Highway Occupancy Permit, 1 L.S. Coal Refuse Removal and Grading - Coal Refuse Removal, 215,000 C.Y. Coal Refuse Removal and Grading - Coal Refuse Grading, 10 ACRE Equipment Storage Area, 278 S.Y. Seeding - Mulching, 10 ACRE READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. *Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 9%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
02/04/2021 07:00 PM UTC
OSM 40(0493,3724,3725)101.1
Abandoned Mine Reclamation Project Hollars Hill South AML - Cranberry Creek Gateway Project Hazle Township, Luzerne County Estimated Amount: Greater than $5,000,000 Term: 600 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Eight Inch (8") Ductile Iron Pipe Including Fittings - 1,015 L.F. Connection to Existing Water Main - 1 L.S. Drilling of Boreholes - 448 L.F. Furnishing and Installing Casing Pipe - 285 L.F. Fill Material Injection - Flowable Fill Material/Concrete Material - 200/200 C.Y. Removal and Disposal of Structures - 7 Grading, Hauling and Compaction - 742,666 C.Y. Disposal of Solid Waste - 10,000 Tons Drainage Excavation - 2,645 C.Y. Rock Lining - 4,099 S.Y. Seeding - 66 ACRE Addendum No. 1 was issued on December 1, 2020. Addendum No. 2 was issued on December 9, 2020. *Small Diverse Business and Veteran Business Enterprise Participation Goals: The Issuing Office and the Department of General Services’ Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) have not set Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals for this procurement. This procurement is either under the dollar threshold for setting SDB and VBE Participation goals, or the Issuing Office and BDISBO have determined that the SDB and/or VBE participation opportunities for the scope of work for this procurement are de minimis. There are no additional SDB, VBE or Small Business requirements for this procurement. However, SDB, VBE and Small Business utilization is encouraged when possible. Attachment A is not applicable under these circumstances.
12/17/2020 07:00 PM UTC
OOGM 19-3
Cleaning Out and Plugging One (1) Abandoned Well Mill Creek Township, Lycoming County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 120 calendar days Bid Bond Not Required Principal Items of Work and Approximate Quantities: Prepare and restore well site. Mobilize and demobilize plugging equipment. Clean-out and plug one abandoned well, estimated to be up to 6,854 feet in depth, to Department specifications.
10/29/2020 06:00 PM UTC
OSM 17(6806)101.1
Abandoned Mine Reclamation Project Weber Run South Cooper Township, Clearfield County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 210 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clearing and Grubbing, 1 L.S. Grading, 80,100 C.Y. Seeding, 9.5 Acre
09/17/2020 06:00 PM UTC
OSM 24(3895)102.1
Abandoned Mine Reclamation Project Winslow Hill III (East) Benezette Township, Elk County Estimated Amount: $500,000 to $1,000,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clearing and Grubbing, 1 L.S. Alkaline Addition, 4,608 Ton Subsurface Drain with Cleanout, 250 L.F. Grading, 524,000 C.Y. Erosion Matting, 1,950 S.Y. Rock Lining, 100 S.Y. Culvert Pipe - Eighteen Inch (18") Smooth-Interior Corrugated N-12 Pipe, 50 L.F. Culvert Pipe - Twelve Inch (12") Smooth-Interior Corrugated N-12 Pipe, 30 L.F. Seeding, 45 Acre Tree Planting, 260 Tree Stone Aggregate, AASHTO No. 1 Stone, 328 Ton Stone Aggregate, PA DOT No. 2A Stone, 192 Ton
09/10/2020 06:00 PM UTC
OSM 17(7087)101.1
Abandoned Mine Reclamation Project Morgan Run Recreational Facility – West Decatur PO Boggs Township, Clearfield County Estimated Amount: $300,000 to $500,000 Term: 270 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Dewatering Impoundments, 1 L.S. Clearing and Grubbing, 1 L.S. Subsurface Drain with Cleanouts, 430 L.F. Grading, 73,600 C.Y. Parking Area Construction, 1 L.S. Recreational Trail - Construction, 1 L.S. Recreational Trail - Culvert Pipe, 40 L.F. Amphitheater Construction, 1 L.S. Erosion Matting, 1,485 S.Y. Stone Aggregate - AASHTO No. 1, 1,800 Ton Stone Aggregate - PA DOT No. 2A, 1,910 Ton Rock Lining, 35 S.Y. Seeding, 12.4 Acre
09/10/2020 06:00 PM UTC
OSM 33(6102)101.1
Abandoned Mine Reclamation Project, Saint Tobias Cemetery, Snyder Township, Jefferson County. Mandatory Pre-Bid Meeting: No; Estimated Amount: $1,000,000 to $5,000,000; Term: 420 calendar days; Bid Bond Required. Principal Items of Work and Approximate Quantities: Clearing and Grubbing 1 Lump Sum; Grading 162,500 C.Y.; Trench Drain (A) Excavation 20,900 C.Y.; (B) Filter Fabric 17,595 S.Y.; (C) R-4 Rock 12,900 TON; (D) R-6 Rock 22,100 TON; Rolled Erosion Control Products 28,900 S.Y.; Access Roadway Surface Material 905 S.Y.; Seeding 22 ACRE.
09/03/2020 06:00 PM UTC
OSM 02(1726,0385)102.1
Abandoned Mine Reclamation Project Penn Hills Penn Hills Township, Allegheny County Estimated Amount: $200,000 to $299,999 (Small Business Only) Term: 270 Calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Removal and Disposal of Garage and Solid Waste Disposal, 10 Ton Diversion and Care of Water, 1 L.S. Boring, 250 L.F. Siphon Pipe and Siphoning Process, 400 L.F. Polyethylene Pipe, 200 L.F. Channel Excavation, 65 C.Y. Cement Concrete Floor and Driveway, 100 S.Y. Replacement of Garage, 1 L.S.
07/23/2020 06:00 PM UTC
131 - 140 of 215 Solicitations
1 2 … 10 11 12 14 16 17 18 … 21 22