General Info

Business Logo

Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OOGM FS25-6
Cleaning Out and Plugging Six (6) Orphan Gas Wells Center Township, Butler County Estimated Amount: $300,000-$500,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug six (6) orphan gas wells, estimated to be 1700 to 2200 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: February 4, 2026, at 10:00 a.m. Department representatives will meet contractors at: Adelman Fields 299 Old Plank Road Butler, PA Meet in parking lot of baseball field. 40.824529, -79.909805 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
02/26/2026 07:00 PM UTC
OOGM FS25-4
Cleaning Out and Plugging Three (3) Orphan Gas Wells Allegheny Township, Westmoreland County Estimated Amount: $300,000-$500,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug three (3) orphan gas wells, estimated to be 3500-4000 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: February 18, 2026, at 10:00 a.m. Department representatives will meet contractors at: Baseball Field #4, 236 Air Shaft Road, Apollo, PA 15613, 40.580182, -79.620358. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
03/26/2026 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OSM 24(0524)101.1
Abandoned Mine Reclamation Project, Spring Run, Jay Township, Elk County, Contract Estimate Amount: $200,000 to $299,999 (Small Business Only), Term: 270 Calendar Days, Principal Items of Work and Approx Quantities: Grading, 110,975 C.Y.; Subsurface Drains, 1,400 L.F.; Seeding, 12.2 Acres.
08/03/2017 06:00 PM UTC
OSM 03(6079)101.1
Abandoned Mine Reclamation Project, Greendale North, Valley Township, Armstrong County, Estimated Amount: $200,000 to $299,999 (Small Business Only), Term: 210 Calendar Days, Principal Items of Work & Approx Quantities: Peoples Natural Gas Representative Time During Gas Line Crossing Work, 1 Invoice; Subsurface Drain with Cleanout, 175 L.F.; Grading, 132,500 C.Y.; Seeding, 11.5 Acres.
08/01/2017 06:00 PM UTC
EC177082717
Environmental Cleanup and Brownfields Project, Removal and Disposal of (4) Underground Storage Tank Systems, Ma and Pa's Old Country Store and Restaurant, Burnside Borough, Clearfield County. Principal Items of Work and Approximate Quantities: DEP-certified “UMR” - Underground storage tank-removal, under Chapter 245.110(b)(2), oversight JOB; Excavation and removal of 4 underground storage tanks systems LS; Removal and Disposal of residual liquids 17 drums; Disposal of 4 steel underground storage tanks and associated fiberglass piping; 18 soil samples. If groundwater is present, 13 soil samples and three groundwater samples; Backfill 110 tons; Project Completion Report. Contract estimate $15,000 to $25,000. Term: 30 calendar days. MANDATORY PRE-BID SITE INSPECTION: JUNE 15, 2017 AT 10:00am, 7494 MAIN STREET, BURNSIDE PA 15721.
07/06/2017 06:00 PM UTC
AMD 18(0817)103.1
Acid Mine Drainage Abatement Project, Fran Contracting Camp Run No. 2, East Keating Township, Clinton County. The principal items of work and approximate quantities include: Excavation and Rebackfilling 1,355,097 C.Y., Alkaline Addition (Limestone Screenings) 161,200 TON, Seed Bed Preparation and Seeding 51.5 ACRE, Tree Planting – Seedlings 30,000 TREE , Rock Underdrains 1,720 L.F., Permanent Access Roads 8,667 S.Y. Contract estimate greater than $5,000,000. Term: 545 calendar days. ADDENDUM NO. 1 REQUIRED
06/06/2017 06:00 PM UTC
OSM 17(1083)102.1
Abandoned Mine Reclamation Project, South Grassflat, Cooper Township, Clearfield County, Principle Items of Work and Approximate Quantities: Clearing and Grubbing JOB Grading 265,620 C.Y. Ditch Excavation 4,800 C.Y. Rolled Erosion Control Products 2,735 S.Y. Rock Lining 2,490 S.Y. Alkaline Addition 7,338 TON Subsurface Drain 875 L.F. Gate 2 EACH Access Roadway Surface Material 3,125 S.Y. Seeding 29.5 ACRE
05/18/2017 06:00 PM UTC
191 - 195 of 195 Solicitations
1 2 12 13 14 15 16 17 18 20 Next →