General Info

Business Logo

Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSM 63(0962)102.1
Abandoned Mine Reclamation Project Muse Coal Refuse Pile Cecil Township, Washington County Estimated Amount: $1,000,000-$5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 1,600 L.F. Clearing and Grubbing, 10.8 ACRE Grading, 54,000 C.Y. Planting – Planting Preparation, 11.8 ACRE Subsurface Drains, 900 L.F. Grass Lined Ditches, 1,000 L.F. Culvert – Culvert C-1, 60 L.F. Culvert – Headwall, 1 EACH Demolition and Disposal of Mine Facilities, 5 EACH Gate, 1 EACH Alkaline Addition, 3,500 TON MANDATORY Pre-Bid Training will be held on: August 19, 2025 at 2:00 p.m. FAILURE TO ATTEND THE PRE-BID TRAINING WILL BE CAUSE FOR REJECTION OF THE BID. READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 6%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
09/04/2025 06:00 PM UTC
OSM 11(2713)102.1
Abandoned Mine Reclamation Project Ingleside Northeast Richland Township, Cambria County Estimated Amount: $1,000,000 to $5,000,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 7,800 L.F. Clearing and Grubbing, 44 ACRE Grading – Grading Area 1A, 54,000 C.Y. Grading – Grading Area 1B, 56,658 C.Y. Grading – Grading Area 2, 53,867 C.Y. Grading – Grading Area 3, 304,510 C.Y. Planting – Planting Preparation, 44 ACRE Planting – Tree Seedlings, 27,880 EACH Subsurface Drain, 930 L.F. Rock Lined Channel, 506.1 S.Y. Grass Lined Channel, 373.3 C.Y. Type 2 Right-of-Way Fence, 1,350 L.F.
09/11/2025 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OSM 32(4016)101.1
Abandoned Mine Reclamation Project, Palmer Road Waterline, Burrell Township, Indiana County; Contract Estimate Amount: $300,000 to $500,000; Term: 180 Calendar Days; Bid Bond Required; Principal Items of Work and Approximate Quantities: Installation of Eight-Inch (8”) PVC Pipe Including Fittings, 3,520 L.F.; Service Lateral Connections, 12 Each; Highway Crossing, 400 L.F.; Stream Crossings, 90 L.F.; Typical Manual Air Relief Blow-off Assembly, 3 Each; Penn View Road Six-Inch (6”) Meter and Vault, 1 Each.
04/24/2018 06:00 PM UTC
OOGM 17-3
Cleaning Out and Plugging Two (2) Abandoned Oil and Gas Wells in Concord Township, Jefferson County and Butler Township, Butler County. Contract Estimate Amount: $0 to $100,000 (Small Business Only); Term: 42 calendar days; Bid Bond Required; Principal Items of Work and Approximate Quantities: clean-out and plug two (2) abandoned oil and gas wells, estimated to be 1,600 feet and 2,000 feet in depth, to Department specifications; prepare and restore well sites/site; and mobilize and demobilize plugging equipment. A pre-bid meeting will be held on March 6, 2018 at 10 a.m. at 3 C's Pizza, 1252 West Sunbury Road, West Sunbury, PA 16061.
04/05/2018 06:00 PM UTC
OSM 10(7136)101.1
Abandoned Mine Reclamation Project, Little Bear Creek East, Allegheny Township, Butler County; Contract Estimate Amount: $100,000 to $200,000 (Small Business Only); Term: 180 Calendar Days; Bid Bond Required; Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 1 L.S.; Channel Excavation, 750 C.Y.; Erosion Matting, 2,110 S.Y.; Dewatering Impoundment, 1 L.S.; Grading, 24,180 C.Y.; Seeding, 4.5 ACRE.
03/22/2018 06:00 PM UTC
OOGM 17-2
Cleaning Out and Plugging One (1) Orphan Gas Well in Chapman Township, Clinton County. Estimated Amount is $0 to $100,000 (Small Business Only). Term is 20 calendar days. Bid Bond is required. Principle Items of Work and Approximate Quantities are to clean out and plug one (1) orphan gas well, estimated to be 2,600 feet in depth, to Department specifications; to prepare and restore well sites/site; and to mobilize and demobilize plugging equipment. PRE-BID MEETING IS FEBRUARY 1, 2018 AT 11:00 AM AT 26 GRANT AVENUE, CHAPMAN TOWNSHIP (RENOVO) PA 17760.
03/08/2018 07:00 PM UTC
OSM 33(6321)101.1
Abandoned Mine Reclamation Project, McGarey South, Beaver Township, Jefferson County. Estimated Amount: $300,000 to $500,000. Term: 240 calendar days. Bid Bond Required. Principal Items of Work and Approximate Quantities: Subsurface Drains with Cleanouts, 250 L.F.; Alkaline Addition, 3,460 TON; Grading, 132,700 C.Y.; Channel and Swale Excavation, 1,025 C.Y.; Erosion Matting, 2,180 S.Y.; Rock Lining, 235 S.Y.; Seeding, 16 ACRE.
02/27/2018 07:00 PM UTC
HSCP-3-223-102.1
Hazardous Site Cleanup Project, Intercourse TCE Site Water Supply and Treatment System, Leacock Township, Lancaster County; Estimated Amount: Greater than $5,000,000; Term: 730 Calendar Days; Bid Bond Required; Principal Items of Work and Approximate Quantities: See General Contract Information. Mandatory Pre-Bid Meeting on January 17, 2018 at 10:00 a.m. in the Leacock Township Office, 3545 West Newport Road, Intercourse, PA 17534.
02/08/2018 07:00 PM UTC
OSM 17(6483)101.1
Water Main Extension Project, Pine Grove North (Glen Richey) Waterline, Lawrence Township, Clearfield County; Estimated Amount: $1,000,000 to $5,000,000; Term: 365 calendar days; Bid Bond Required; Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 1 L.S.; Site Preparation and Restoration, 1 L.S.; Eight-Inch (8”) and Six-Inch (6”) PVC Pipe Including Fittings, 70,500 L.F.; Eight-Inch (8”) and Six-Inch (6”) Gate Valve and Roadway Valve Box, 70 EACH; 2A Stone, 20,445 C.Y.; Service Lateral Connections, 151 EACH; Highway Crossing Boring, 300 L.F.; Repaving - Twenty-Five (25) mm Superpave Base Course, 2,000 TON; Repaving - Nine (9) mm Superpave Wearing Course, 7,300 S.Y.; SR-153 Krebbs Highway Pressure Reducing Vault, 1 EACH; Bolted Stainless-Steel Water Storage Tank Including Foundation, 1 L.S.; Packaged Water Booster Pumping Station Complete, 1 L.S.
01/25/2018 07:00 PM UTC
OOGM 17-1
Cleaning Out and Plugging One (1) Orphan Gas Well, East Keating Township, Clinton County; Estimated Amount: $100,000 to $200,000 (Small Business Only); Term: 20 calendar days; Bid Bond required; Principal Items of Work and Approximate Quantities: Clean out and plug one (1) orphan gas well, estimated to be 6,000 feet in depth, to Department specifications; Prepare and restore well sites/site; and Mobilize and demobilize plugging equipment. A MANDATORY PRE-BID CONFERENCE WILL BE HELD ON JANUARY 4, 2018 AT 10:00 A.M. AT DCNR, SPROUL FOREST DISTRICT, 15187 RENOVO ROAD, RENOVO, PA 17764.
01/25/2018 07:00 PM UTC
AMD 54(4124)105.1
Abandoned Mine Reclamation Project, Rausch Creek Treatment Plant Upgrades, Hegins Township, Schuylkill County; Estimated Amount: $300,000-$500,000; Term: 300 calendar days; Bid Bond Required; Principle Items of Work and Approximate Quantities include: To replace certain pieces of equipment associated with the Rausch Creek Acid Mine Drainage Treatment Plant. Specifically, the standby generator, polymer mixing and distribution pumping system, and certain components of the plant water system are to be replaced. Much of the old equipment will be demolished and disposed of, including the 125-foot-tall elevated 100,000-gallon water storage tank. A MANDATORY PRE-BID MEETING WILL BE HELD ON NOVEMBER 7, 2017 at 11:00AM, Rausch Creek AMD Treatment Plant, 315 Schwenks Road, Valley View, PA 17983-0758.
12/21/2017 07:00 PM UTC
OSM 13(3206)101.1
Abandoned Mine Reclamation Project, Tresckow South, Banks Township, Carbon County; Estimated Amount $1,000,000 to $5,000,000; Term 720 calendar days; Bid Bond Required; Principle Items of Work and Approximate Quantities include Clearing and Grubbing 177.6 AC, Grading 1,937,857 CY, Drainage Excavation 8,066 CY, Granular Sodium Bentonite Clay Lining 605 TON.
12/19/2017 07:00 PM UTC
151 - 160 of 171 Solicitations
1 2 10 11 12 13 14 16 18