General Info

Business Logo

Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OOGM FS25-1
Cleaning Out and Plugging Fifteen (15) Orphan Gas Wells Lancaster, Forward, and Connoquenessing Townships, Butler County Estimated Amount: $1,000,000-$5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug fifteen (15) orphan gas wells, estimated to be 1,100 to 3,500 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: October 15, 2025 at 9:00 a.m. Department representatives will meet contractors at: Pavillion #6 at Moraine State Park, 40.9667, -80.1238. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
10/30/2025 06:00 PM UTC
OSM 17(7183)101.1
Abandoned Mine Reclamation Project Goshen West Goshen Township, Clearfield County Estimated Amount: $500,000-$1,000,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 Each Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter) – 4,480 L.F. Clearing and Grubbing, 27.8 Acre Grading - Grading, 216,478 C.Y. Grading – Hummocky Piles, 14.3 Acre Grading – Ripping, 13.5 Acre Planting – Planting Preparation, 27.8 Acre Planting – Tree Seedlings, 18.904 Each
11/06/2025 07:00 PM UTC
OOGM 25-1
Cleaning Out and Plugging Forty-Four (44) Abandoned/Orphaned Wells Permitted Oil/Gas Wells Highland Township, Elk County Estimated Amount: $1,000,000-$5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug forty-four (44) Oil/Gas Wells, estimated to be up to 3,000 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: October 22nd through October 23rd, 2025, at 9:00 a.m. Department representatives will meet contractors at: Lamont Tool Shop Warehouse Rd (FR 337) 41.5347, -78.9143 To access the well locations, it is advised the contractors bring an ATV/UTV to commute between wells. The ATV trail access is between 7 and 8 miles of wooded terrain not accessible by car or truck. No pickup trucks or other vehicles other than ATV’s/UTV’s are permitted on the standalone ATV trail network. The USFS will allow the use of an ATV/UTV under 70” width at the pre-bid. The ride will be at your own risk and all safety equipment should be worn while driving. Although bringing an ATV/UTV is a recommended option, all potential bidders will have the opportunity to view all wells, regardless of if they bring an ATV/UTV to the meeting. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
11/06/2025 07:00 PM UTC
OSM 17(4543)101.1
Abandoned Mine Reclamation Project Alder Run Morris Township, Clearfield County Estimated Amount: $300,000-$500,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (12” Diameter) - 930 L.F. Clearing and Grubbing, 21.7 ACRE Grading - Grading, 149,622 C.Y. Grading - Ripping, 0.6 ACRE Planting - Planting Preparation, 21.7 ACRE Planting - Tree Seedlings, 408 EACH Dewatering Impoundments, 1 L.S. Sediment Basin and Vernal Pool Construction, 1 L.S.
11/06/2025 07:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSM 16(2826)101.1
Abandoned Mine Reclamation Project, Fairmount City, Redbank Township, Clarion County; NO Mandatory Pre-Bid Meeting; Estimate $300,000 - $500,000; Term - 270 Calendar Days; Bid Bond Required. Principal Items of Work and Approximate Quantities: Underground Storage Tank Removal, 1 LS; Demolition, Removal and Disposal of Mine Structures, 1 LS; Mine Drain, 1,500 LF; Sealing Mine Entries, 2 Each; Grading, 10,761 CY; Alkaline Addition, 910 Ton; Six-Inch (6") Thick Soil Cover, 2,936 CY.
08/31/2017 06:00 PM UTC
OSM 33(1147)101.1
Abandoned Mine Reclamation Project, Sykesville, Sykesville Borough, Jefferson County. Principal Items of Work and Approximate Quantities: Twelve-Inch (12") Subsurface Drains with Cleanouts, 206 L.F.; Cast-In-Place Inlet Box, 1 Each; Sidewalk Replacement, 40 S.Y.; Pavement Replacement, 45 S.Y. Contract estimate $0 to $100,000 (Small Business Only). Term: 150 calendar days. Bid Bond Required.
08/24/2017 06:00 PM UTC
OSM 04(4460)101.1
Abandoned Mine Reclamation Project, Homewood Southeast, North Sewickley Township, Beaver County, Contract Estimate Amount $300,000 - $500,000, Term: 270 Calendar Days, Principal Items of Work and Approx Quantities: Subsurface Drains with Cleanouts, 1,200 L.F.; Grading, 136,000 C.Y.; Erosion Matting, 2,230 S.Y.; Rock Lining, 780 S.Y.; Greer Property Drainage Conveyance, 1 L.S.; Construction of Bat Gate, 85 L.F.; Seeding, 18.4 Acres.
08/08/2017 06:00 PM UTC
OSM 24(0524)101.1
Abandoned Mine Reclamation Project, Spring Run, Jay Township, Elk County, Contract Estimate Amount: $200,000 to $299,999 (Small Business Only), Term: 270 Calendar Days, Principal Items of Work and Approx Quantities: Grading, 110,975 C.Y.; Subsurface Drains, 1,400 L.F.; Seeding, 12.2 Acres.
08/03/2017 06:00 PM UTC
OSM 03(6079)101.1
Abandoned Mine Reclamation Project, Greendale North, Valley Township, Armstrong County, Estimated Amount: $200,000 to $299,999 (Small Business Only), Term: 210 Calendar Days, Principal Items of Work & Approx Quantities: Peoples Natural Gas Representative Time During Gas Line Crossing Work, 1 Invoice; Subsurface Drain with Cleanout, 175 L.F.; Grading, 132,500 C.Y.; Seeding, 11.5 Acres.
08/01/2017 06:00 PM UTC
EC177082717
Environmental Cleanup and Brownfields Project, Removal and Disposal of (4) Underground Storage Tank Systems, Ma and Pa's Old Country Store and Restaurant, Burnside Borough, Clearfield County. Principal Items of Work and Approximate Quantities: DEP-certified “UMR” - Underground storage tank-removal, under Chapter 245.110(b)(2), oversight JOB; Excavation and removal of 4 underground storage tanks systems LS; Removal and Disposal of residual liquids 17 drums; Disposal of 4 steel underground storage tanks and associated fiberglass piping; 18 soil samples. If groundwater is present, 13 soil samples and three groundwater samples; Backfill 110 tons; Project Completion Report. Contract estimate $15,000 to $25,000. Term: 30 calendar days. MANDATORY PRE-BID SITE INSPECTION: JUNE 15, 2017 AT 10:00am, 7494 MAIN STREET, BURNSIDE PA 15721.
07/06/2017 06:00 PM UTC
AMD 18(0817)103.1
Acid Mine Drainage Abatement Project, Fran Contracting Camp Run No. 2, East Keating Township, Clinton County. The principal items of work and approximate quantities include: Excavation and Rebackfilling 1,355,097 C.Y., Alkaline Addition (Limestone Screenings) 161,200 TON, Seed Bed Preparation and Seeding 51.5 ACRE, Tree Planting – Seedlings 30,000 TREE , Rock Underdrains 1,720 L.F., Permanent Access Roads 8,667 S.Y. Contract estimate greater than $5,000,000. Term: 545 calendar days. ADDENDUM NO. 1 REQUIRED
06/06/2017 06:00 PM UTC
OSM 17(1083)102.1
Abandoned Mine Reclamation Project, South Grassflat, Cooper Township, Clearfield County, Principle Items of Work and Approximate Quantities: Clearing and Grubbing JOB Grading 265,620 C.Y. Ditch Excavation 4,800 C.Y. Rolled Erosion Control Products 2,735 S.Y. Rock Lining 2,490 S.Y. Alkaline Addition 7,338 TON Subsurface Drain 875 L.F. Gate 2 EACH Access Roadway Surface Material 3,125 S.Y. Seeding 29.5 ACRE
05/18/2017 06:00 PM UTC
171 - 178 of 178 Solicitations
1 2 10 11 12 13 14 15 16 18 Next →