Pennsylvania Department of Environmental Protection
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSM 61(0807,6967)101.1
Abandoned Mine Reclamation Project
Smith Corners
Clinton Township, Venango County
Estimated Amount: $500,000 to $1,000,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction
Entrance, 3 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32”
Diameter), 4,650 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter
Tube,145 L.F.
Clearing and Grubbing, 23.1 ACRE
Grading – Grading Area 1, 24,450 C.Y.
Grading – Grading Area 2, 141,209 C.Y.
Grading – Grading Area 3, 13,626 C.Y.
Grading – Ripping, 15.2 ACRE
Planting – Planting Preparation, 23.1 ACRE
Planting – Tree Seedlings, 10,345 EACH
Planting – Grass Seed, 240 LB.
Subsurface Drain, 1,990 L.F.
Permanent Channel Excavation, 208 C.Y.
Erosion Matting, 767 S.Y.
Selective Grading, 200 ACRE
Implementation of the Traffic Control Plan, 1 L.S.
| 06/04/2026 06:00 PM UTC |
|
OSM 17(6425)101.1
Abandoned Mine Reclamation Project
Keewaydin
Covington and Karthaus Townships, Clearfield County
Estimated Amount: $1,000,000-$5,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (24” Diameter), 2,580 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 4,370 L.F.
Clearing and Grubbing, 20 ACRE
Demolition, Removal and Disposal of Buildings and Equipment, 1 L.S.
Dewatering and Diversion and Care of Water, 1 L.S.
Stream Crossings - Stream Crossing 1 - Rock Ford, 200 TON
Stream Crossings - Stream Crossing 2 - 60" RCEP, 50 L.F.
Stream Crossings - Stream Crossing 2 - R-6 Rock, 50 S.Y.
Stream Crossings - Stream Crossing 2 - 2A Aggregate, 90 C.Y.
Stream Crossings - Stream Crossing 3 - 72" RCEP, 150 L.F.
Stream Crossings - Stream Crossing 3 - R-6 Rock, 180 S.Y.
Stream Crossings - Stream Crossing 3 - 2A Aggregate, 230 C.Y.
Special Handling of Refuse Material - Baghouse Lime, 2,700 TON
Special Handling of Refuse Material - Placement of Refuse Mixture, 42,420 C.Y.
Grading – Grading, 70,000 C.Y.
Grading – Ripping, 10 ACRE
Selective Grading, 10 ACRE
Access Road, 2,600 L.F.
Planting/Seeding - Planting Preparation, 20 ACRE
Planting/Seeding - Tree Seedlings, 6,800 EACH
| 06/04/2026 06:00 PM UTC |
|
OOGM FS26-3
Cleaning Out and Plugging One (1) Abandoned Gas Well
Moon Township, Allegheny County
Estimated Amount: $100,000-$200,000 (Small Business Only)
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug one (1) abandoned gas well, estimated to be approximately 2000’ feet in depth, to Department specifications.
Prepare and restore well site
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: May 13, 2026, at 10:00 a.m.
Department representatives will meet contractors at:
Robert Morris University
Parking Area on Colonial Way (Next to Baseball Field)
40.523194, -80.210583
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 06/18/2026 06:00 PM UTC |
|
OSM 05(2002,7054)101.1
Abandoned Mine Reclamation Project
Kimber Mountain NW
Broad Top Township, Bedford County
Estimated Amount: Greater than $5,000,000
Term: 730 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 4 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 17,674 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Riprap Apron, 89 S.Y.
Clearing and Grubbing – Grading Area 1, 79.0 ACRE
Clearing and Grubbing – Grading Area 2, 17.2 ACRE
Clearing and Grubbing – Grading Area 3, 7.4 ACRE
Clearing and Grubbing – Grading Area 4, 1.9 ACRE
Clearing and Grubbing – Grading Area 5, 35.6 ACRE
Clearing and Grubbing – Grading Area 6, 7.5 ACRE
Access Road – New Road Construction, 1,826 L.F.
Access Road – Install Two-Inch (2”) PennDOT 2A on all roads at end of project, 2,229 TON
Subsurface Drain, 3,844 L.F.
Dewatering Impoundments, 1 L.S.
Grading – Grading Area 1, 1,133,874 C.Y.
Grading – Grading Area 2, 114,232 C.Y.
Grading – Grading Area 3, 33,166 C.Y.
Grading – Grading Area 4, 8,618 C.Y.
Grading – Grading Area 5, 490,907 C.Y.
Grading – Grading Area 6, 68,351 C.Y.
Permanent Channel Excavation, 360 C.Y.
Rock Lining, 2,436 S.Y.
Seeding – Seed Bed Preparation, 148.6 ACRE
Seeding – Seed, 6,241 LB.
Woodrat Mitigation Structures, 9 EACH
MANDATORY Pre-Bid Conference will be held on: June 1, 2026, at 9:00 a.m.
Department representatives will meet contractors at: 40°07'23.19"N 78°14'20.28"W
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 06/18/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSM 11(2812)101.1
Abandoned Mine Reclamation Project, Cymbria East, Susquehanna Township, Cambria County. Contract Estimate Amount: $100,000-$200,000 (Small Business Only), Term: 180 Calendar Days, Bid Bond required. Principle Items of Work and Approximate Quantities: Clearing and Grubbing, 10.6 Acre; Grading, 80,061 C.Y.; Tree Planting, 9,350 Tree.
| 10/11/2018 06:00 PM UTC |
|
OSM 40(2247)101.5
Abandoned Mine Reclamation Project, Dorrance Exploratory Drilling, City of Wilkes-Barre, Luzerne County. Contract Estimate Amount: $100,000-$200,000 (Small Business Only), Term: 90 Calendar Days, Bid Bond required. Principle Items of Work and Approximate Quantities: Prepare a drilling pad. Drilling of six (6) boreholes to determine if two (2) mine shafts are open or filled. There will be approximately 273 feet of four (4) inch drilling, 273 feet of four (4) inch casing, and 830 feet of Three and Seven-Eighths (3 7/8) Inch Drilling.
| 10/04/2018 06:00 PM UTC |
|
OSM 63(5042)101.1
Abandoned Mine Reclamation Project, Rylands Hill East, Jefferson Township, Washington County, Contract Estimate Amount: $300,000-$500,000, 360 Calendar Days, Bid Bond required. Principle Items of Work and Approximate Quantities include: Subsurface Drains with Cleanouts, 1,550 L.F.; Grading, 212,900 C.Y.; Channel Excavation, 498 C.Y.; Erosion Matting, 690 S.Y.; Rock Lining, 185 S.Y.; Mine Openings, See Sub Items; Seeding, 25.2 Acre.
| 09/13/2018 06:00 PM UTC |
|
OOGM 18-3
Cleaning Out and Plugging Three (3) Gas Wells in Huston Township, Clearfield County; Contract Estimate Amount $300,000 - $500,000; Term - 180 calendar days; Bid Bond Required; Principal Items of Work and Approximate Quantities are to clean-out and plug three (3) gas wells, estimated to range in depth from 1,507 feet to 7,078 feet to Department specifications, to prepare and restore well sites, and to mobilize and demobilize plugging equipment. A MANDATORY Pre-Bid Conference is scheduled for August 8, 2018 at 10:00 a.m. Meet at the DCNR Moshannon Forest District, District Office, 3372 State Park Road, Penfield, PA 15849. Failure to attend the Pre-Bid Conference will be cause for rejection of the bid.
| 08/23/2018 06:00 PM UTC |
|
Capital Bus Company
State Lead Project – UST Product and Tank Removal, Harrisburg City, Dauphin County. Estimated Amount: $0 to $100,000 (Small Business Only); Term: 30 Calendar Days; Bid Bond/Contract Bond not required; Small Diverse Business not required; Principal Items of Work and Approximate Quantities: Site Access and Restriction, 1 LS; Removal/Disposal of Residual Liquids from Underground Storage Tank Systems, 8,933 Gallons; Excavation, Removal & Disposal of Underground Storage Tank Systems, 2 LS; Removal/Disposal of Contaminated Soil from Underground Storage Tank Systems, 50 Tons; Backfill: (Stone), 100 Tons; Backfill: (Asphalt), 17 Tons; Project Completion Report, 1 LS. MANDATORY PRE-BID MEETING WILL BE HELD ON AUGUST 14, 2018 AT 10:00 AM AT 1061 SOUTH CAMERON STREET, HARRISBURG, PA 17105. Failure to attend the Pre-Bid Meeting will be cause for rejection of the bid.
| 08/23/2018 06:00 PM UTC |
|
OOGM 17-4
Cleaning Out and Plugging One (1) Orphan Gas Well in Franklin Park Borough, Allegheny County. Contract Estimate Amount: $200,000 to $300,000 (Small Business Exempted); Term: 70 Calendar Days; Bid Bond Required; Principal Items of Work and Approximate Quantities: Clean-out and plug one (1) orphan gas well, estimated to be approximately 2,000 feet in depth, to Department specifications; Prepare and Restore Well Sites/Site; Mobilize and Demobilize Plugging Equipment. A mandatory pre-bid meeting was held on August 2, 2018 at 10:00 AM at the 2205 McAleer Road, Franklin Park, PA 15143. Only attendees of this meeting are able to bid on this project.
| 08/23/2018 06:00 PM UTC |
|
OOGM 17-4
Cleaning Out and Plugging One (1) Orphan Gas Well in Franklin Park Borough, Allegheny County. Contract Estimate Amount: $200,000 to $300,000 (Small Business Exempted); Term: 70 Calendar Days; Bid Bond Required; Principal Items of Work and Approximate Quantities: Clean-out and plug one (1) orphan gas well, estimated to be approximately 2,000 feet in depth, to Department specifications; Prepare and Restore Well Sites/Site; Mobilize and Demobilize Plugging Equipment. A mandatory pre-bid meeting will be held on August 2, 2018 at 10:00 AM at the 2205 McAleer Road, Franklin Park, PA 15143. Failure to attend the pre-bid meeting will be cause for rejection of the bid.
| 08/16/2018 06:00 PM UTC |
|
OOGM 18-1
Cleaning Out and Plugging One (1) Orphan Gas Well in Pike Township, Potter County. Contract Estimate Amount: $0 to $100,000 (Small Business Only); Term: 30 Calendar Days; Bid Bond Required; Principal Items of Work and Approximate Quantities: Clean-out and plug one (1) orphan gas well, estimated to be approximately 2,000 feet in depth, to Department specifications; Prepare and restore well sites/site; Mobilize and demobilize plugging equipment. A pre-bid meeting will be held on July 26, 2018 at 10:00 AM at the intersection of Loucks Mills Road and Hard Scrabble Road, Pike Township, PA 16948 (west of Galeton).
| 08/09/2018 06:00 PM UTC |
|
OSM 17(0098)101.1
Abandoned Mine Reclamation Project, Boardman – Potts Run No. 3, Knox Township, Clearfield County. Contract Estimate: $1,000,000 to $5,000,000. Term: 270 Calendar Days. Bid Bond required. Principal Items of Work and Approximate Quantities include: Mobilization and Demobilization, 1 L.S.; Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S.; Subsurface Underdrains, 3,150 L.F.; Permanent Access Road and Gate, 2,170 L.F.; Alkaline Addition, 13,200 TON; Construction of Rock Sump, 1,800 TON; Clearing and Grubbing, Grading, Seeding, Tree Planting Preparation and Tree Planting, 23.7 ACRE.
| 07/26/2018 06:00 PM UTC |
|
OOGM 17-3R
Cleaning Out and Plugging Two (2) Abandoned Oil and Gas Wells in Concord and Jefferson Townships, Butler County. Contract Estimate Amount: $0 to $100,000 (Small Business Only); Term: 60 Calendar Days; Bid Bond Required; Principal Items of Work and Approximate Quantities: clean-out and plug two (2) abandoned oil and gas wells, estimated to be 1,600 feet and 2,000 feet in depth, to Department specifications; prepare and restore well sites/site; and mobilize and demobilize plugging equipment. A pre-bid meeting will be held on June 8, 2018 at 10:00 AM at 3 C's Pizza, 1252 West Sunbury Road, West Sunbury, PA 16061.
| 06/21/2018 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.