General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1271058-Hamilton Hall-Room 0002-Remodel
This project will remodel the existing studio space. The scope of work includes, but is not limited to, removing a window from the vestibule wall and installing it in the control room wall; cutting an opening in the vestibule wall for a new window; cutting a large view window into the interior vestibule wood door; and painting all walls, door and window frames. This project also includes numerous lighting additions and upgrades, as well as a large amount of AV equipment.
08/21/2025 07:01 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
CP002541-Memorial Union-Floors 4-6-Renovation
The project consists of, but is not limited to, the renovation of approximately 23,400 square feet on the upper three floors in the Memorial Union. Work includes demolition of existing walls, floors and ceilings, removal of mechanical, electrical and fire protection systems. New work includes gypsum board partitions, finishes, and painting and associated mechanical, electrical, plumbing and telecommunications modifications.
11/12/2020 08:01 PM UTC
CP002706-Institutional Roads 2021-University Boulevard and Haber Road-Signal Replacement
The project consists of, but is not limited to, replacement of the existing traffic signals with new signals that meet current traffic control standards and pavement work at the intersection of University Boulevard and Haber Road on the Iowa State University campus. Scope of work includes new traffic signals, associated hardware and all underground raceways and cables, roadway pavement modifications, new sidewalks, ADA complaint ramps and pavement striping.
10/29/2020 07:01 PM UTC
CP002214-BioCentury Research Farm-Vehicle Dynamometer Facility-Electrical Improvements
The project consists of, but is not limited to, materials and labor to increase the electrical service for the operation of a new vehicle dynamometer in an existing building. The project includes new 2500 amp service, switchboard, and disconnect.
10/29/2020 07:01 PM UTC
CP002604-Parking Lots 2020-Pavement Preservation-Richardson Court
The project consists of, but is not limited to, removal of existing concrete and asphalt pavement, new asphalt pavement with concrete curb and gutter, concrete sidewalks, storm sewer structures and piping, water main installation, sanitary sewer installation, medium voltage electrical and power service to Linden Hall, parking lot and sidewalk lighting, subsurface detention, pavement markings and finish grading.
10/22/2020 07:01 PM UTC
CP002697-Bessey Hall-Rooms 0001, 0003 and 0305-Remodel
The project consists of, but is not limited to, the demolition and remodeling of multiple areas within Bessey Hall, including portions of the existing basement and a research lab on the third floor. Work includes demolition of existing walls, doors, finishes and lab furnishings, equipment and MEP systems associated with multiple lab spaces. Architectural work includes new walls, doors, frames, patching and painting, new fixed equipment, new environmental chambers and upgrades to the MEP systems.
10/13/2020 07:01 PM UTC
CP002697 - Bessey Hall-Room 0001, 0003 and 0305-Remodel
The project consists of, but is not limited to, the demolition and remodeling of multiple areas within Bessey Hall, including portions of the existing basement and a research lab on the third floor. Work includes demolition of existing walls, doors, finishes and lab furnishings, equipment and MEP systems associated with multiple lab spaces. Architectural work includes new walls, doors, frames, patching and painting, new fixed equipment, new environmental chambers and upgrades to the MEP systems.
10/08/2020 06:01 PM UTC
CP002713 - Gilman Hall-AHU15 and AHU16-Coil Replacement
The project consists of, but is not limited to, new coils and associated work for the replacement of the pre-heat and by-pass coils for air handling units 15 and 16.
09/22/2020 07:01 PM UTC
CP002714 - Molecular Biology Building-AHU7-Coil Replacement
The project consists of, but is not limited to, the replacement of the existing heating coil and associated steam piping and accessories in AHU#7 with a new heating coil, move and replace components such as louvers, dampers and filter racks as required to bring the new heating coils into the building. Project includes all related mechanical work as indicated on the contract documents to support the project scope defined above and shown in the contract documents.
09/15/2020 07:01 PM UTC
CP002698 - Gilman Hall-Office and Lab Space-Remodel
The project consists of, but is not limited to, power and mechanical system modifications, finish and lighting updates, and casework replacement.
09/03/2020 07:01 PM UTC
CP002699 - Food Sciences Building-AHU1 Coil-Replacement
The project consists of, but is not limited to, replacement of existing heating coil, air blender, and filter rack in air handler AHU1 with new heating coil, air blender, and filter rack. All replacement components in air handler will be shifted slightly from their current location to a new location further downstream. Work also includes relocation of existing steam condensate receiving tank and pumps and removal of existing electrical transformer serving AHU1 supply fan.
09/01/2020 07:01 PM UTC
211 - 220 of 371 Solicitations
1 2 18 19 20 22 24 25 26 37 38