General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1271054-Ringgenberg Farm-Storm Water Improvements
The scope of work includes, but is not limited to, the construction of a grassed waterway, storm sewer connections, and miscellaneous drainage improvements for the Ringgenberg Farm.
12/16/2025 08:01 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
CP002756-Student Services Building-Common Area Improvements
This project will improve the overall first impressions and circulation of the Student Services building common areas. This project includes, but is not limited to, space reconfiguration, updating finishes, new furniture, and new technology.
10/26/2021 07:01 PM UTC
CP002734-Applied Science Complex 4-Renovation
The project consists of, but is not limited to, mechanical and electrical upgrades to an existing single story metal building. Mechanical scope includes new unitary heating and cooling equipment and ductwork, new dust collector, and updates to existing building automation system to support new equipment. Electrical scope includes new electrical transformer and panel, new lighting, and new fire alarm panel. Scope of work includes replacement of existing interior doors with rated doors and modifications to existing gypsum walls to meet fire rating requirements.
10/19/2021 07:01 PM UTC
CP002748-Memorial Union-Great Hall Stage-Renovation
The project consists of, but is not limited to, rigging upgrades, lighting adjustments, and curtain replacement.
10/14/2021 07:01 PM UTC
CP002663-Farm House Lane-Reconstruction
The project consists of, but is not limited to, reconstruction and widening of Farm House Lane from Parking Lot 49 to Troxel Hall. Also included is construction of storm sewer facilities, water main relocation, steam tunnel top and wall replacement, lighting, reconstruction of pedestrian facilities and bicycle parking.
10/14/2021 07:01 PM UTC
CP002630-General Services Building-Sprinkler System Installation
The project consists of, but is not limited to, modifications to the water service entrance; new sprinkler piping and valves; and updating the fire detection and alarm system.
09/02/2021 07:01 PM UTC
CP002717-Parks Library-AHU-Replacement
The project consists of, but is not limited to, replacement of Air Handling Unit #1.
08/26/2021 07:01 PM UTC
CP002694-Carver Hall-Classrooms 0002 and 0004-Remodel
The project consists of, but is not limited to, finish updates, reconfiguration of mechanical distribution, and electrical upgrades.
06/29/2021 07:01 PM UTC
CP002648-Iowa School for the Deaf-Long Hall High School-Upgrades
The project consists of, but is not limited to, removal and replacement of existing exterior windows; miscellaneous exterior masonry repair; mechanical, electrical, and life safety upgrades; and new floor and ceiling finishes.
06/17/2021 07:01 PM UTC
CP002671-Utilities-Campus Sidewalk Lighting Improvement Phase 2
The project consists of, but is not limited to, improving lighting on campus sidewalks by installing new poles and light fixtures, relocating existing sidewalk poles, installing solar-powered sidewalk lights, and adding/replacing building mounted lights.
06/10/2021 07:01 PM UTC
CP002734-Applied Science Complex 4-Renovation
The project consists of, but is not limited to, mechanical and electrical upgrades to an existing single story metal building. Mechanical scope includes new unitary heating and cooling equipment and ductwork, new dust collector, and updates to existing building automation system to support new equipment. Electrical scope includes new electrical transformer and panel, new lighting, and new fire alarm panel. Scope of work includes replacement of existing interior doors with rated doors and modifications to existing gypsum walls to meet fire rating requirements.
06/03/2021 07:01 PM UTC
181 - 190 of 378 Solicitations
1 2 15 16 17 19 21 22 23 37 38