Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
CP1279411-Durham Center-Heating Water Piping-Replacement
This project will replace the heating system piping throughout the Durham Center. The scope of work includes, but is not limited to, the removal of existing piping, risers, valves and supports. Included is the replacement of all materials, including new riser valves to enhance system control and efficiency. Any abatement of hazardous materials will be handled by the university.
| 06/26/2025 07:01 PM UTC |
CP1280467-Agronomy Hall-Room G0525-Renovation
The scope of work includes, but is not limited to, classroom renovation involving demolition of existing built-in island, shelving and pegboards, and installation of new light fixtures with dimming capabilities, new rubber flooring, painting, and new classroom furniture.
| 07/01/2025 07:01 PM UTC |
CP1275701-Durham Center-Room 0139-Remodel
This project will remodel a previously occupied computer lab space to include both open office space and private office spaces. This project includes, but is not limited to, new walls, flooring, paint, and furniture; additional mechanical equipment and controls for private offices; existing mechanical modifications; sprinkler modifications; and new lighting and lighting controls.
| 07/08/2025 07:01 PM UTC |
Number | Deadline |
---|---|
CP002734-Applied Science Complex 4-Renovation
The project consists of, but is not limited to, mechanical and electrical upgrades to an existing single story metal building. Mechanical scope includes new unitary heating and cooling equipment and ductwork, new dust collector, and updates to existing building automation system to support new equipment. Electrical scope includes new electrical transformer and panel, new lighting, and new fire alarm panel. Scope of work includes replacement of existing interior doors with rated doors and modifications to existing gypsum walls to meet fire rating requirements.
| 10/19/2021 07:01 PM UTC |
CP002748-Memorial Union-Great Hall Stage-Renovation
The project consists of, but is not limited to, rigging upgrades, lighting adjustments, and curtain replacement.
| 10/14/2021 07:01 PM UTC |
CP002663-Farm House Lane-Reconstruction
The project consists of, but is not limited to, reconstruction and widening of Farm House Lane from Parking Lot 49 to Troxel Hall. Also included is construction of storm sewer facilities, water main relocation, steam tunnel top and wall replacement, lighting, reconstruction of pedestrian facilities and bicycle parking.
| 10/14/2021 07:01 PM UTC |
CP002630-General Services Building-Sprinkler System Installation
The project consists of, but is not limited to, modifications to the water service entrance; new sprinkler piping and valves; and updating the fire detection and alarm system.
| 09/02/2021 07:01 PM UTC |
CP002717-Parks Library-AHU-Replacement
The project consists of, but is not limited to, replacement of Air Handling Unit #1.
| 08/26/2021 07:01 PM UTC |
CP002694-Carver Hall-Classrooms 0002 and 0004-Remodel
The project consists of, but is not limited to, finish updates, reconfiguration of mechanical distribution, and electrical upgrades.
| 06/29/2021 07:01 PM UTC |
CP002648-Iowa School for the Deaf-Long Hall High School-Upgrades
The project consists of, but is not limited to, removal and replacement of existing exterior windows; miscellaneous exterior masonry repair; mechanical, electrical, and life safety upgrades; and new floor and ceiling finishes.
| 06/17/2021 07:01 PM UTC |
CP002671-Utilities-Campus Sidewalk Lighting Improvement Phase 2
The project consists of, but is not limited to, improving lighting on campus sidewalks by installing new poles and light fixtures, relocating existing sidewalk poles, installing solar-powered sidewalk lights, and adding/replacing building mounted lights.
| 06/10/2021 07:01 PM UTC |
CP002734-Applied Science Complex 4-Renovation
The project consists of, but is not limited to, mechanical and electrical upgrades to an existing single story metal building. Mechanical scope includes new unitary heating and cooling equipment and ductwork, new dust collector, and updates to existing building automation system to support new equipment. Electrical scope includes new electrical transformer and panel, new lighting, and new fire alarm panel. Scope of work includes replacement of existing interior doors with rated doors and modifications to existing gypsum walls to meet fire rating requirements.
| 06/03/2021 07:01 PM UTC |
CP002683-Jack Trice Stadium-East Gateway Bridge
The project consists of, but is not limited to, the construction of an elevated gateway bridge over South University Boulevard to connect the east concourse of Jack Trice Stadium and game day parking east of South University Boulevard. A sidewalk will be added along the east side of the existing stadium ring road. The existing Reiman Gardens fencing on the north will be continued along the west side of University Boulevard.
| 05/27/2021 07:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.