General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1303338-Howe Hall-Room 1200 Remodel
****THIS BID HAS BEEN CANCELLED**** This project will remodel room 1200 in Howe Hall. Work includes, but is not limited to: demolition of existing cubicles; construction of two offices and a front reception space; associated mechanical and electrical improvements; painting; carpeting; and lighting.
04/02/2026 07:01 PM UTC
CP1300765-Town Engineering Building-Rooms 142, 148 and 156 Remodel
This project includes interior renovations to two existing lab spaces (Rooms 142 and 148) and one storage room (Room 156) at the west end of Town Engineering along the existing loading dock, totaling 3,000 square feet. The existing labs will be renovated to better support existing space uses and the existing storage room will be renovated into a cleaning and storage space. Demolition work includes but is not limited to; demolition of two existing concrete masonry walls, concrete slab, casework, and exterior access doors. New work includes but is not limited to: exterior wall patching and finishes. Mechanical scope includes but is not limited to: demolition of existing gas lines, new dust collection system, and replacement of existing grilles and diffusers. Electrical scope includes but is not limited to: renovations to power and lighting systems.
04/07/2026 07:01 PM UTC
CP1295340-Institutional Roads 2026-Pavement Preservation
Planned work includes, but is not limited to, asphalt and concrete improvements on various Institutional Roads segments across campus.
04/14/2026 07:01 PM UTC
CP1248808-Lake LaVerne-Improvements
The project consists of, but is not limited to, dewatering, excavation and disposal of lakebed sediment from Lake LaVerne as well as pavement removal, regrading of the lakebed, reshaping the lake edge, bank stabilization, placement of limestone outcropping and fieldstone along the lake edge, cut limestone walls, extending lake overflow channel, PCC sidewalks, railing replacement, site lighting, and seeding.
04/16/2026 07:01 PM UTC
CP1300581-Memorial Union-Roof Sections B, C, G, J, K, W, Z and 1 Replacement
MEMORIAL UNION-ROOF REPLACEMENT-SECTIONS G, Z, 1 This project will replace Memorial Union roof sections G, Z, and 1. The scope of work includes, but is not limited to, demolishing existing roof systems and replacing them with new roofing systems.
04/21/2026 07:01 PM UTC
CP1289859-Beardshear Hall-Rooms 0530, 0810, 0880, 3410 Improvement
Scope for Accounts Receivable, ID Card Office, Treasury, and a shared space in 3410 Beardshear for Accounts Receivable and Financial Aid. Accounts Receivable 0810 Beardshear: Reconfigure space to accommodate the ID Card Office 0810A: Reconfigure current Conference Room into two workstations and a small kitchenette 0810C: Reconfigure current office into two work stations to support ID Card 0880: Reconfigure AR Front Office to move kitchenette out and add small student workstations 0530 Beardshear: Remodel current card office for Treasury space 3410 Beardshear: Update paint and carpet, in addition to office furniture for 3410A, 3410C to allow for shared workspace offices
04/23/2026 07:01 PM UTC
CP1275129-Linden Residence Hall-North Retaining Wall-Repairs
This project will repair and replace segments of the retaining wall and replace stairs on the north side of Linden Residence Hall. The scope of work includes, but is not limited to, retaining wall footing and masonry replacement, site lighting, concrete stairs, sidewalk replacement, landscaping, and site drainage improvements. An accessible pedestrian and equipment access route will be provided to the plaza level.
04/28/2026 07:01 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
CP002225-Student Innovation Center-Dust Collection System
The project consists of, but is not limited to, installation of a new dust collection system serving the level 1 fabrication space in the Student Innovation Center. Work requires selective demolition, installation of a full dust collection system including controls, fire suppression, compressed air, and all other items to support the full system, and integration with existing building systems.
12/17/2020 08:01 PM UTC
CP002675-Veterinary Medicine-Roof Replacement-Sections 3 and 4
The project consists of, but is not limited to, removal of the existing ballasted roof system down to the existing asphaltic built up roof layer. Installation of new insulation and fully adhered 90 mil EPDM roof membrane roof (base bid) or PVC roof membrane (alternate #1). Removal and reinstallation of metal flashings, disconnection and reconnection of equipment as needed, extension of curbs and new walk pads.
12/15/2020 08:01 PM UTC
CP002710-Genetics Laboratory and Genetics Poultry Laboratory-Demolition
The project consists of, but is not limited to, demolition of the Genetics Laboratory and Genetics Poultry Laboratory as well as utility abandonment, utility demolition, pavement and sidewalk removal, earth excavation, grading, pavement replacement and lighting. The project is located on the north side of Pammel Drive between Morrill Road and Winlock Road.
12/08/2020 08:01 PM UTC
CP002627-Utilities-Power Plant-Control Room
The project consists of, but is not limited to, infill work, building a control room with a kitchenette, providing work stations, and installing owner-provided LCD screens. Control room will require an HVAC unit and also require some mechanical tie-ins to existing building systems. Electrical wiring and lighting is also included in the scope of work.
11/24/2020 08:01 PM UTC
CP002541-Memorial Union-Floors 4-6-Renovation
The project consists of, but is not limited to, the renovation of approximately 23,400 square feet on the upper three floors in the Memorial Union. Work includes demolition of existing walls, floors and ceilings, removal of mechanical, electrical and fire protection systems. New work includes gypsum board partitions, finishes, and painting and associated mechanical, electrical, plumbing and telecommunications modifications.
11/12/2020 08:01 PM UTC
CP002706-Institutional Roads 2021-University Boulevard and Haber Road-Signal Replacement
The project consists of, but is not limited to, replacement of the existing traffic signals with new signals that meet current traffic control standards and pavement work at the intersection of University Boulevard and Haber Road on the Iowa State University campus. Scope of work includes new traffic signals, associated hardware and all underground raceways and cables, roadway pavement modifications, new sidewalks, ADA complaint ramps and pavement striping.
10/29/2020 07:01 PM UTC
CP002214-BioCentury Research Farm-Vehicle Dynamometer Facility-Electrical Improvements
The project consists of, but is not limited to, materials and labor to increase the electrical service for the operation of a new vehicle dynamometer in an existing building. The project includes new 2500 amp service, switchboard, and disconnect.
10/29/2020 07:01 PM UTC
CP002604-Parking Lots 2020-Pavement Preservation-Richardson Court
The project consists of, but is not limited to, removal of existing concrete and asphalt pavement, new asphalt pavement with concrete curb and gutter, concrete sidewalks, storm sewer structures and piping, water main installation, sanitary sewer installation, medium voltage electrical and power service to Linden Hall, parking lot and sidewalk lighting, subsurface detention, pavement markings and finish grading.
10/22/2020 07:01 PM UTC
CP002697-Bessey Hall-Rooms 0001, 0003 and 0305-Remodel
The project consists of, but is not limited to, the demolition and remodeling of multiple areas within Bessey Hall, including portions of the existing basement and a research lab on the third floor. Work includes demolition of existing walls, doors, finishes and lab furnishings, equipment and MEP systems associated with multiple lab spaces. Architectural work includes new walls, doors, frames, patching and painting, new fixed equipment, new environmental chambers and upgrades to the MEP systems.
10/13/2020 07:01 PM UTC
CP002697 - Bessey Hall-Room 0001, 0003 and 0305-Remodel
The project consists of, but is not limited to, the demolition and remodeling of multiple areas within Bessey Hall, including portions of the existing basement and a research lab on the third floor. Work includes demolition of existing walls, doors, finishes and lab furnishings, equipment and MEP systems associated with multiple lab spaces. Architectural work includes new walls, doors, frames, patching and painting, new fixed equipment, new environmental chambers and upgrades to the MEP systems.
10/08/2020 06:01 PM UTC
231 - 240 of 395 Solicitations
1 2 20 21 22 24 26 27 28 39 40