Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
CP1289828-Communications Building-Rooms 1115 and 1154-Remodel
This project will remodel approximately 2,550 GSF in the Communications Building Suite 1115 and Room 1154. Work includes, but is not limited to, demolition, construction, mechanical and electrical improvements, paint, carpet, and lighting.
| 10/16/2025 07:01 PM UTC |
CP1015970-Human Nutritional Sciences Building-Textiles Science Teaching Laboratory-Remodel
This project proposes to remodel rooms 2003, 2110, 2116, 2118, 2124, and 2126 of the Human Nutritional Sciences Building (HNSB) to accommodate a Textiles Science Teaching Laboratory. A future project will include a first-floor remodel of HNSB to accommodate a Tearoom/Student-Run Restaurant (SRR). This project proposed to remodel approximately 2,417 gross square feet of the second floor of HNSB to a Textiles Science Teaching Laboratory (TSL). The TSL, temporarily located in Bessey Hall due to the rebuild of LeBaron Hall, will relocate to the new space. Work consists of demolition of interior space including existing walls, casework, equipment, and finishes. New work will include new walls, casework, fume hoods, finishes, and updated mechanical and electrical work to support the remodel.
| 10/30/2025 07:01 PM UTC |
CP1239249-Patterson Hall-Laboratory Speaker Strobe-Installation
This Project consists of replacement of fire alarm notification appliances throughout Area G first floor and second floor of the Patterson Hall Building.
| 11/04/2025 08:01 PM UTC |
CP1290583-Patterson Hall-Rooms 1107, 1220, 1222F, 1222G and 1222H-Remodel
This project will remodel rooms 1107, 1220, 1222F, 1222G, and 1222H. The scope of work includes, but is not limited to: removing a wall; patch and painting all walls; new flooring; new lighting; installing new sinks; demolishing existing casework and installing new casework and benching; relocating electrical receptacles; and modifying HVAC ductwork.
| 11/06/2025 08:01 PM UTC |
Number | Deadline |
---|---|
CP002671 - Utilities-Campus Sidewalk Lighting Improvements-Phase 1
The project consists of, but is not limited to, improving lighting on campus sidewalks by installing new poles and light fixtures, changing out HPS heads to an LED retrofit, and adding/replacing building mounted lights.
| 06/18/2020 07:01 PM UTC |
CP002609 - Utilities-Power Plant-Natural Gas Main Valves Replacement
This project will replace the existing 12” natural gas valve with a new 8” header and three 6” valves and gas piping to each boiler to create redundancy and eliminate a single point of failure.
| 06/04/2020 07:01 PM UTC |
CP002214 - BioCentury Research Farm-Vehicle Dynamometer Facility-Interior Remodeling
The project consists of, but is not limited to, providing transportation, equipment, materials, construction, and services necessary to remodel the interior of a pre-engineered steel farm building. Work will include steel wall liner, miscellaneous carpentry, mechanical, and electrical work.
| 05/28/2020 07:01 PM UTC |
CP002620 - Applied Science 2-Roof Replacement-Section E
This project includes, but is not limited to, removal of the existing ballasted roof system down to the existing insulation, adding new insulation to achieve energy code requirements, installation of backer board and a new 90 mil EPDM membrane roof system. Alternate work scope includes installation of ballasted safety guardrail.
| 05/07/2020 07:01 PM UTC |
CP002665 - Frederiksen Court-Roof Replacements
The project consists of, but is not limited to, removal and replacement of the shingles, ice and water shield, gutters, and downspouts and removal and replacement of plywood sheathing as needed on nine buildings in Frederiksen Court.
| 04/09/2020 07:01 PM UTC |
CP002650 - Carver Hall-Room 0101-Renovation
The project consists of, but is not limited to, removal and replacement of flooring and seating, painting, lighting, acoustical wall panel installation, handrails and minor electrical work.
| 04/07/2020 07:01 PM UTC |
CP002684 - Extension Information Technology Building-Demolition
The project consists of, but is not limited to, demolition of the Extension Information Technology Building as well as utility abandonment, utility demolition, parking lot pavement removal, and site grading.
| 04/07/2020 07:01 PM UTC |
CP002666 - Schilletter Village-Roof Replacements FY20
The project consists of, but is not limited to, removal and replacement of the shingles, ice and water shield, gutters, soffit panels and metal fascia; installation of roof ventilation; and replacement of plywood sheathing as needed on twenty buildings in Schilletter Village.
| 04/02/2020 07:01 PM UTC |
CP002669 - College of Design-Room 0101-Renovation
The project consists of, but is not limited to, demolition of framed walls and concrete risers; construction of new pipe enclosure walls; removal and replacement of flooring, seating, and rubber stair tread/risers; painting; drop ceiling tile replacement; and minor electrical work.
| 03/31/2020 07:01 PM UTC |
CP002572 - Hilton Coliseum-Roof Replacement
The project consists of, but is not limited to, installation of new insulation and PVC membrane roof and removal and reinstallation of existing motorized roof vents and associated electrical work.
| 03/26/2020 07:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.