Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
CP1253073-Communications Building-Suite 1200-Remodel
This project will remodel approximately 4,100 GSF in Communications Building Suite 1200, including rooms 1211, 1226, and 1227. Work includes, but is not limited to, demolition, construction, mechanical and electrical improvements, paint, carpet, lighting, and furniture.
| 05/13/2025 07:01 PM UTC |
CP1259884-Stephens Auditorium-Utility Lines-Repair
This project will make corrections to certain sanitary drains currently tied-in to the storm sewer system. The scope of work includes, but is not limited to, permanently sealing or rerouting drains from an electrical room, two mechanical rooms, and one air handling unit.
| 05/22/2025 07:01 PM UTC |
CP1119832-Beardshear Hall-Window Repairs-Phases 1 and 2-Phase 2
This project includes, but is not limited to, the restoration of existing wood windows and door frames at Beardshear Hall. All loose paint will be scraped off and any holes, splits, and damage to the existing wood frames will be patched and repaired to match existing shapes and sizes. The restoration includes professional repainting with premium exterior wood primer and paint. The existing original paint on the frames contains lead so all contractors working on this project will be required to adhere to the EPA Renovation, Repair, and Painting rule, which requires Lead Safe Work Practices.
| 05/22/2025 07:01 PM UTC |
Number | Deadline |
---|---|
CP002685 - Reiman Gardens-Pathway Improvements 2020
The project consists of, but is not limited to, removal of gravel pathways, concrete sidewalk paving, storm sewer piping, site grading and seeding.
| 03/26/2020 07:01 PM UTC |
CP002604 - Parking Lots 2020-Pavement Preservation-Richardson Court
The project consists of, but is not limited to, removal of existing concrete and asphalt pavement, new asphalt pavement with concrete curb and gutter, concrete sidewalks, storm sewer structures and piping, water main installation, sanitary sewer installation, medium voltage electrical and power service to Linden Hall, parking lot and sidewalk lighting, subsurface detention, pavement markings and finish grading.
| 03/24/2020 07:01 PM UTC |
CP002604 - Parking Lots 2020-Pavement Preservation-Lot 74
The project consists of, but is not limited to, removal and replacement of concrete pavement, concrete sidewalks, reconstruction of storm sewer structure, new and relocated roadway and sidewalk lighting, pavement markings and finish grading.
| 03/24/2020 07:01 PM UTC |
CP002583-Veterinary Medicine-Fish Tank Lobby
The project consists of, but is not limited to, terrazzo flooring replacement; mechanical and electrical modifications, and new finishes throughout.
| 03/24/2020 07:01 PM UTC |
CP002584 - Veterinary Medicine-Classroom 2532-Expansion
The project consists of, but is not limited to, structural modifications; mechanical, electrical, and technology upgrades; and modernized finishes.
| 03/19/2020 07:01 PM UTC |
CP002580 - Buchanan Residence Hall-Exterior Facade Repairs
The project consists of, but is not limited to, the removal and reuse of exterior metal wall panels, replacement of the panel support system, patch and repair or replace the air and water barrier, and supply and install new exterior metal wall panels where needed.
| 03/17/2020 07:01 PM UTC |
CP002638 - Jack Trice Stadium-Field Renovation
The project consists of, but is not limited to, removal and off-site hauling of existing root zone materials, finish grading, sod installation and irrigation system adjustments. Contractor shall provide all incidental materials and equipment to install to specifications the system shown in the construction documents.
| 03/12/2020 07:01 PM UTC |
CP002645-Utilities-P Tunnel Chilled Water Main-Replacement
The project consists of, but is not limited to installation of new sections of 20” HDPE chilled water lines under Lincoln Way south of Larch Residence Hall by directional drilling, connection to existing 14” ductile iron lines, and removal and replacement of existing pavement in the small drive south of Larch Residence Hall.
| 03/10/2020 07:01 PM UTC |
CP002505-Sports Performance Center and Jack Trice Stadium Improvements North-Jacobson and Concourse
The project consists of, but is not limited to, remodeling within the existing Jacobson Building, demolition of the existing Olsen Building, constructing a new concourse and connection bridge, and stadium hillside upgrades.
Work includes concrete foundations, steel structure, precast concrete, metal wall panels, glazing, PVC roofing, CMU, metal stud framing, interior glazing, interior finishes, mechanical, and electrical systems.
| 03/05/2020 08:01 PM UTC |
CP002483-Barton Residence Hall-Window Replacement
The project consists of, but is not limited to, the replacement of approximately 118 windows.
| 02/27/2020 08:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.