General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1279411-Durham Center-Heating Water Piping-Replacement
This project will replace the heating system piping throughout the Durham Center. The scope of work includes, but is not limited to, the removal of existing piping, risers, valves and supports. Included is the replacement of all materials, including new riser valves to enhance system control and efficiency. Any abatement of hazardous materials will be handled by the university.
06/26/2025 07:01 PM UTC
CP1280467-Agronomy Hall-Room G0525-Renovation
The scope of work includes, but is not limited to, classroom renovation involving demolition of existing built-in island, shelving and pegboards, and installation of new light fixtures with dimming capabilities, new rubber flooring, painting, and new classroom furniture.
07/01/2025 07:01 PM UTC
CP1275701-Durham Center-Room 0139-Remodel
This project will remodel a previously occupied computer lab space to include both open office space and private office spaces. This project includes, but is not limited to, new walls, flooring, paint, and furniture; additional mechanical equipment and controls for private offices; existing mechanical modifications; sprinkler modifications; and new lighting and lighting controls.
07/08/2025 07:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP002580 - Buchanan Residence Hall-Exterior Facade Repairs
The project consists of, but is not limited to, the removal and reuse of exterior metal wall panels, replacement of the panel support system, patch and repair or replace the air and water barrier, and supply and install new exterior metal wall panels where needed.
03/17/2020 07:01 PM UTC
CP002638 - Jack Trice Stadium-Field Renovation
The project consists of, but is not limited to, removal and off-site hauling of existing root zone materials, finish grading, sod installation and irrigation system adjustments. Contractor shall provide all incidental materials and equipment to install to specifications the system shown in the construction documents.
03/12/2020 07:01 PM UTC
CP002645-Utilities-P Tunnel Chilled Water Main-Replacement
The project consists of, but is not limited to installation of new sections of 20” HDPE chilled water lines under Lincoln Way south of Larch Residence Hall by directional drilling, connection to existing 14” ductile iron lines, and removal and replacement of existing pavement in the small drive south of Larch Residence Hall.
03/10/2020 07:01 PM UTC
CP002505-Sports Performance Center and Jack Trice Stadium Improvements North-Jacobson and Concourse
The project consists of, but is not limited to, remodeling within the existing Jacobson Building, demolition of the existing Olsen Building, constructing a new concourse and connection bridge, and stadium hillside upgrades. Work includes concrete foundations, steel structure, precast concrete, metal wall panels, glazing, PVC roofing, CMU, metal stud framing, interior glazing, interior finishes, mechanical, and electrical systems.
03/05/2020 08:01 PM UTC
CP002483-Barton Residence Hall-Window Replacement
The project consists of, but is not limited to, the replacement of approximately 118 windows.
02/27/2020 08:01 PM UTC
CP002617 - Beyer Hall-Rooms 1312 and 1316-Renovation
The project consists of, but is not limited to, the demolition of two existing recreational squash court interiors and renovating the existing space into a recreational electronic sports and gaming computer lab.
02/20/2020 08:01 PM UTC
CP002606 - Agricultural Engineering & Agronomy Farm-Plant Pathology Machine Storage Building
The project consists of, but is not limited to, materials and labor to construct a 6000 square feet equipment storage building. The building will be post-frame construction with metal siding and roofing. The building will be uninsulated and have a rock floor.
02/13/2020 08:01 PM UTC
CP002538 - Friley Residence Hall-Roof Replacement
The project consists of, but is not limited to, roof shingle replacement, membrane roof replacement, flat seam metal roof, and new dormer windows. See drawings for slate shingle and window abatement removals by others.
02/13/2020 08:01 PM UTC
CP002595 - Helser Residence Hall-Tuckpointing
The project consists of, but is not limited to, tuckpointing, exterior insulation finish system replacement, and masonry cleaning and repair.
02/04/2020 08:01 PM UTC
CP002624-Insectary, Genetics Storage, and Chick Isolation-Demolition
The project consists of, but is not limited to, the demolition of the Insectary, Genetics Storage, and Chick Isolation buildings at Iowa State University. Work also includes utility abandonment, utility demolition, steam tunnel removal, pavement and sidewalk removals, excavation, grading, lighting and replacement of pavement and sidewalks.
01/23/2020 08:01 PM UTC
241 - 250 of 367 Solicitations
1 2 21 22 23 25 27 28 29 36 37