General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1271054-Ringgenberg Farm-Storm Water Improvements
The scope of work includes, but is not limited to, the construction of a grassed waterway, storm sewer connections, and miscellaneous drainage improvements for the Ringgenberg Farm.
12/16/2025 08:01 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
CP002663-Farm House Lane-Reconstruction
The project consists of, but is not limited to, reconstruction and widening of Farm House Lane from Parking Lot 49 to Troxel Hall. Also included is construction of storm sewer facilities, water main relocation, steam tunnel top and wall replacement, lighting, reconstruction of pedestrian facilities and bicycle parking.
03/04/2021 08:01 PM UTC
CP002680-Maple Residence Hall-Fire Alarm System Upgrade
The project consists of, but is not limited to, installation of a new addressable voice fire alarm system to be installed throughout Maple Residence Hall. This includes addressable fire alarm control panel with voice controls, area type smoke and heat detectors, duct mounted smoke detectors, speaker/strobe signal devices, elevator interface controls, elevator disconnect switch, cutting and patching, painting, and other related electrical work. All pathways are to be concealed - no surface mounted pathways will be allowed. Any cutting of drywall will be repaired, patched and painted to a level 5 finish and to match existing wall color. Existing pathways may be used, but are not exhaustive of the work. No substitutions of fire alarm system components will be allowed.
03/02/2021 08:01 PM UTC
CP002723-Iowa School for the Deaf-Pool Dehumidification System-Replacement
The project consists of, but is not limited to, removal and replacement of the existing pool dehumidification system. Contractor is responsible for any required new steel and electrical work.
03/02/2021 08:01 PM UTC
CP002676-Maple Residence Hall-Elevated Walkway Replacement
The project consists of, but is not limited to, demolition of the north and south existing elevated concrete walkways and metal railings, and replacement with new cast-in-place elevated concrete walkways and metal railings at Maple Residence Hall.
02/18/2021 08:01 PM UTC
CP002728-Institutional Roads 2021-Pavement Preservation
The project consists of, but is not limited to, removal of existing concrete and asphalt pavement and placement of new concrete pavement with PCC curb and gutter.
02/18/2021 08:01 PM UTC
CP002735-University Compost Facility-Hoop Replacement
The project consists of, but is not limited to, supply materials and labor to erect a new 80 feet x 140 feet hoop structure on an existing concrete knee wall.
02/11/2021 08:01 PM UTC
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 1
The project consists of, but is not limited to, expanding the existing 4160 volt electrical substation located south of the General Services Building to accommodate a new 8.4 MVA transformer, 13,800 volt switchgear, a high voltage feeder cable from Haber Road substation to service the new transformer and switchgear and high voltage feeder cables from the new transformer to the existing 4160 volt switchgear along with new underground raceway systems. Site work includes the removal of the existing site masonry enclosure, construction of new footings and enclosure walls, relocation of an existing underground water main, replacement of a section of stream tunnel roof and replacement of affected roadway and parking lot pavement.
02/11/2021 08:01 PM UTC
CP002657-Memorial Union-Dining Services-Poco Picante-Remodel
The project consists of, but is not limited to, renovation of 250 square foot food service venue located on the first floor of the Memorial Union. Scope includes installation of new counters & food service equipment, and lighting fixtures. Demolition and installation of modified plumbing and electrical to support the renovated space.
02/09/2021 08:01 PM UTC
CP002582-Parks Library-South Window System-Repairs
The project consists of, but is not limited to, replacement of curtainwall components outside of the structural back members including glazing, entrance door replacement, and interior finish repairs as a result of water intrusion damage.
01/28/2021 08:01 PM UTC
CP002610-Utilities-Power Plant-Boiler Makeup System Improvements
The project consists of, but is not limited to, installation of Owner-furnished water treatment equipment, controls, electrical, and interconnecting piping as well as demolition of interior walls.
01/28/2021 08:01 PM UTC
201 - 210 of 378 Solicitations
1 2 17 18 19 21 23 24 25 37 38