CP1285631-Utilities-Veterinary Medicine Power Plant-Roof Replacement
This project will replace the roof at Veterinary Medicine Utilities Boiler Building with EPDM membrane material. The scope of work includes removal of existing built up roof to roof deck, new insulation, installation of new EPDM membrane, and removal and reinstallation of existing lightning protection system.
06/11/2026 07:01 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
CP002724-Friley Residence Hall-Bathroom Improvements-Phase 1
The project consists of, but is not limited to, remodel of bathrooms in stacks G and H. The bathrooms will be converted to private, accessible spaces. The work includes mechanical, electrical, and plumbing system modifications, interior finish updates, and layout changes.
01/20/2022 08:01 PM UTC
CP002490-Poultry Farm-Teaching and Research Facilities-Turkey Facility-Phase 2
The project consists of, but is not limited to, materials and labor to build-out a 3920 square foot work area. This area has all of the under floor utilities installed, has a concrete floor, is in an insulated building enclosure, has drywall ceiling and perimeter walls. The ceiling and walls are not taped or finished. The project shall include constructing interior walls, electrical, mechanical, and plumbing.
01/13/2022 08:01 PM UTC
CP002589-Union Drive Community Center-Union Drive Marketplace-Renovation-Venues and Seating
The project consists of, but is not limited to, renovation of interior finishes and equipment in seating area and three foodservice venues in the Union Drive Community Center. Upgrades include polishing of existing concrete flooring, wall and ceiling finishes, replacement of existing doors, new cooking and foodservice equipment, plumbing improvements, electrical power improvements, and installation of new lighting.
01/06/2022 08:01 PM UTC
CP913244-Institutional Roads 2022-Pavement Preservation-Union Drive
The project consists of, but is not limited to, removal and replacement of concrete pavement, concrete sidewalks, reconstruction of storm sewer structure, new and relocated roadway and sidewalk lighting, pavement markings and finish grading.
12/16/2021 08:01 PM UTC
CP002650-Carver Hall-Room 0101-Renovation
The project consists of, but is not limited to, removal and replacement of flooring and seating, painting, lighting, acoustical wall panel installation, handrails and minor electrical work.
12/14/2021 08:01 PM UTC
CP002669-College of Design-Room 0101-Renovation
The project consists of, but is not limited to, demolition of framed walls and concrete risers; construction of new pipe enclosure walls; removal and replacement of flooring, seating, and rubber stair tread/risers; painting; drop ceiling tile replacement; and minor electrical work.
12/09/2021 08:01 PM UTC
CP002747-Memorial Union-Soults Family Visitor Center-Remodel
This project will expand and remodel the existing Soults Family Visitor Center to improve the campus visitor experience. The project consists of, but is not limited to, expanded office spaces; updated finishes; new technology, equipment, and furniture; and restroom modernization.
11/18/2021 08:01 PM UTC
CP002720-College of Design-Window Replacement
The project consists of, but is not limited to, cleaning the existing exterior concrete building surface, removing and replacing existing sealant joints at exterior concrete walls, removing and replacing existing ribbon window units, and replacing identified damaged interior wall assembly and finishes.
10/28/2021 07:01 PM UTC
CP002756-Student Services Building-Common Area Improvements
This project will improve the overall first impressions and circulation of the Student Services building common areas. This project includes, but is not limited to, space reconfiguration, updating finishes, new furniture, and new technology.
10/26/2021 07:01 PM UTC
CP002734-Applied Science Complex 4-Renovation
The project consists of, but is not limited to, mechanical and electrical upgrades to an existing single story metal building. Mechanical scope includes new unitary heating and cooling equipment and ductwork, new dust collector, and updates to existing building automation system to support new equipment. Electrical scope includes new electrical transformer and panel, new lighting, and new fire alarm panel. Scope of work includes replacement of existing interior doors with rated doors and modifications to existing gypsum walls to meet fire rating requirements.
10/19/2021 07:01 PM UTC