General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1279411-Durham Center-Heating Water Piping-Replacement
This project will replace the heating system piping throughout the Durham Center. The scope of work includes, but is not limited to, the removal of existing piping, risers, valves and supports. Included is the replacement of all materials, including new riser valves to enhance system control and efficiency. Any abatement of hazardous materials will be handled by the university.
06/26/2025 07:01 PM UTC
CP1280467-Agronomy Hall-Room G0525-Renovation
The scope of work includes, but is not limited to, classroom renovation involving demolition of existing built-in island, shelving and pegboards, and installation of new light fixtures with dimming capabilities, new rubber flooring, painting, and new classroom furniture.
07/01/2025 07:01 PM UTC
CP1275701-Durham Center-Room 0139-Remodel
This project will remodel a previously occupied computer lab space to include both open office space and private office spaces. This project includes, but is not limited to, new walls, flooring, paint, and furniture; additional mechanical equipment and controls for private offices; existing mechanical modifications; sprinkler modifications; and new lighting and lighting controls.
07/08/2025 07:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP002723-Iowa School for the Deaf-Pool Dehumidification System-Replacement
The project consists of, but is not limited to, removal and replacement of the existing pool dehumidification system. Contractor is responsible for any required new steel and electrical work.
01/14/2021 08:01 PM UTC
CP002636-Enrollment Services Center-Roof Replacement
The project consists of the replacement of the tile roof, skylight, gutters, copper flashing, copper collection boxes, and copper downspouts on the gambrel roof at the Enrollment Services Building. In addition, replacement of the membrane roofs on the three porches, tuckpointing of brick as shown on the drawings, cleaning of stone ornamentation, and repairs and painting of wood trim.
12/17/2020 08:01 PM UTC
CP002225-Student Innovation Center-Dust Collection System
The project consists of, but is not limited to, installation of a new dust collection system serving the level 1 fabrication space in the Student Innovation Center. Work requires selective demolition, installation of a full dust collection system including controls, fire suppression, compressed air, and all other items to support the full system, and integration with existing building systems.
12/17/2020 08:01 PM UTC
CP002675-Veterinary Medicine-Roof Replacement-Sections 3 and 4
The project consists of, but is not limited to, removal of the existing ballasted roof system down to the existing asphaltic built up roof layer. Installation of new insulation and fully adhered 90 mil EPDM roof membrane roof (base bid) or PVC roof membrane (alternate #1). Removal and reinstallation of metal flashings, disconnection and reconnection of equipment as needed, extension of curbs and new walk pads.
12/15/2020 08:01 PM UTC
CP002710-Genetics Laboratory and Genetics Poultry Laboratory-Demolition
The project consists of, but is not limited to, demolition of the Genetics Laboratory and Genetics Poultry Laboratory as well as utility abandonment, utility demolition, pavement and sidewalk removal, earth excavation, grading, pavement replacement and lighting. The project is located on the north side of Pammel Drive between Morrill Road and Winlock Road.
12/08/2020 08:01 PM UTC
CP002627-Utilities-Power Plant-Control Room
The project consists of, but is not limited to, infill work, building a control room with a kitchenette, providing work stations, and installing owner-provided LCD screens. Control room will require an HVAC unit and also require some mechanical tie-ins to existing building systems. Electrical wiring and lighting is also included in the scope of work.
11/24/2020 08:01 PM UTC
CP002541-Memorial Union-Floors 4-6-Renovation
The project consists of, but is not limited to, the renovation of approximately 23,400 square feet on the upper three floors in the Memorial Union. Work includes demolition of existing walls, floors and ceilings, removal of mechanical, electrical and fire protection systems. New work includes gypsum board partitions, finishes, and painting and associated mechanical, electrical, plumbing and telecommunications modifications.
11/12/2020 08:01 PM UTC
CP002706-Institutional Roads 2021-University Boulevard and Haber Road-Signal Replacement
The project consists of, but is not limited to, replacement of the existing traffic signals with new signals that meet current traffic control standards and pavement work at the intersection of University Boulevard and Haber Road on the Iowa State University campus. Scope of work includes new traffic signals, associated hardware and all underground raceways and cables, roadway pavement modifications, new sidewalks, ADA complaint ramps and pavement striping.
10/29/2020 07:01 PM UTC
CP002214-BioCentury Research Farm-Vehicle Dynamometer Facility-Electrical Improvements
The project consists of, but is not limited to, materials and labor to increase the electrical service for the operation of a new vehicle dynamometer in an existing building. The project includes new 2500 amp service, switchboard, and disconnect.
10/29/2020 07:01 PM UTC
CP002604-Parking Lots 2020-Pavement Preservation-Richardson Court
The project consists of, but is not limited to, removal of existing concrete and asphalt pavement, new asphalt pavement with concrete curb and gutter, concrete sidewalks, storm sewer structures and piping, water main installation, sanitary sewer installation, medium voltage electrical and power service to Linden Hall, parking lot and sidewalk lighting, subsurface detention, pavement markings and finish grading.
10/22/2020 07:01 PM UTC
201 - 210 of 367 Solicitations
1 2 17 18 19 21 23 24 25 36 37