General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1289828-Communications Building-Rooms 1115 and 1154-Remodel
This project will remodel approximately 2,550 GSF in the Communications Building Suite 1115 and Room 1154. Work includes, but is not limited to, demolition, construction, mechanical and electrical improvements, paint, carpet, and lighting.
10/16/2025 07:01 PM UTC
CP1015970-Human Nutritional Sciences Building-Textiles Science Teaching Laboratory-Remodel
This project proposes to remodel rooms 2003, 2110, 2116, 2118, 2124, and 2126 of the Human Nutritional Sciences Building (HNSB) to accommodate a Textiles Science Teaching Laboratory. A future project will include a first-floor remodel of HNSB to accommodate a Tearoom/Student-Run Restaurant (SRR). This project proposed to remodel approximately 2,417 gross square feet of the second floor of HNSB to a Textiles Science Teaching Laboratory (TSL). The TSL, temporarily located in Bessey Hall due to the rebuild of LeBaron Hall, will relocate to the new space. Work consists of demolition of interior space including existing walls, casework, equipment, and finishes. New work will include new walls, casework, fume hoods, finishes, and updated mechanical and electrical work to support the remodel.
10/30/2025 07:01 PM UTC
CP1239249-Patterson Hall-Laboratory Speaker Strobe-Installation
This Project consists of replacement of fire alarm notification appliances throughout Area G first floor and second floor of the Patterson Hall Building.
11/04/2025 08:01 PM UTC
CP1290583-Patterson Hall-Rooms 1107, 1220, 1222F, 1222G and 1222H-Remodel
This project will remodel rooms 1107, 1220, 1222F, 1222G, and 1222H. The scope of work includes, but is not limited to: removing a wall; patch and painting all walls; new flooring; new lighting; installing new sinks; demolishing existing casework and installing new casework and benching; relocating electrical receptacles; and modifying HVAC ductwork.
11/06/2025 08:01 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
CP002490-Poultry Farm-Teaching and Research Facilities-Turkey Facility
The project consists of, but is not limited to, materials and labor to construct a 19,770 square foot turkey research facility. The project shall include the foundation, the structure (either wood or steel), concrete floors, insulated walls and roof, and doors and windows.
04/01/2021 07:01 PM UTC
CP002739-Helser Residence Hall-Exterior Repairs
The project consists of, but is not limited to, tuckpointing, exterior insulation finish system replacement, and masonry cleaning and repair.
03/25/2021 07:01 PM UTC
CP002658-Union Drive Community Center-Room 240-Dishwasher Replacement
The project consists of, but is not limited to, concrete slab replacement in the dishroom and replacement of associated under slab utilities and replacement of floor, ceiling, and wall finishes. Contractor to install new dishwasher equipment, conveyer systems, and associated equipment components procured by Owner.
03/16/2021 07:01 PM UTC
CP002538-Friley Residence Hall-Roof Replacement
The project consists of, but is not limited to, roof shingle replacement, membrane roof replacement, metal roof, and new dormer windows. See drawings for slate shingle and window abatement removals by others.
03/04/2021 08:01 PM UTC
CP002663-Farm House Lane-Reconstruction
The project consists of, but is not limited to, reconstruction and widening of Farm House Lane from Parking Lot 49 to Troxel Hall. Also included is construction of storm sewer facilities, water main relocation, steam tunnel top and wall replacement, lighting, reconstruction of pedestrian facilities and bicycle parking.
03/04/2021 08:01 PM UTC
CP002680-Maple Residence Hall-Fire Alarm System Upgrade
The project consists of, but is not limited to, installation of a new addressable voice fire alarm system to be installed throughout Maple Residence Hall. This includes addressable fire alarm control panel with voice controls, area type smoke and heat detectors, duct mounted smoke detectors, speaker/strobe signal devices, elevator interface controls, elevator disconnect switch, cutting and patching, painting, and other related electrical work. All pathways are to be concealed - no surface mounted pathways will be allowed. Any cutting of drywall will be repaired, patched and painted to a level 5 finish and to match existing wall color. Existing pathways may be used, but are not exhaustive of the work. No substitutions of fire alarm system components will be allowed.
03/02/2021 08:01 PM UTC
CP002723-Iowa School for the Deaf-Pool Dehumidification System-Replacement
The project consists of, but is not limited to, removal and replacement of the existing pool dehumidification system. Contractor is responsible for any required new steel and electrical work.
03/02/2021 08:01 PM UTC
CP002676-Maple Residence Hall-Elevated Walkway Replacement
The project consists of, but is not limited to, demolition of the north and south existing elevated concrete walkways and metal railings, and replacement with new cast-in-place elevated concrete walkways and metal railings at Maple Residence Hall.
02/18/2021 08:01 PM UTC
CP002728-Institutional Roads 2021-Pavement Preservation
The project consists of, but is not limited to, removal of existing concrete and asphalt pavement and placement of new concrete pavement with PCC curb and gutter.
02/18/2021 08:01 PM UTC
CP002735-University Compost Facility-Hoop Replacement
The project consists of, but is not limited to, supply materials and labor to erect a new 80 feet x 140 feet hoop structure on an existing concrete knee wall.
02/11/2021 08:01 PM UTC
191 - 200 of 372 Solicitations
1 2 16 17 18 20 22 23 24 37 38