CP1271054-Ringgenberg Farm-Storm Water Improvements
The scope of work includes, but is not limited to, the construction of a grassed waterway, storm sewer connections, and miscellaneous drainage improvements for the Ringgenberg Farm.
12/16/2025 08:01 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
CP002624-Insectary, Genetics Storage, and Chick Isolation-Demolition
The project consists of, but is not limited to, the demolition of the Insectary, Genetics Storage, and Chick Isolation buildings at Iowa State University. Work also includes utility abandonment, utility demolition, steam tunnel removal, pavement and sidewalk removals, excavation, grading, lighting and replacement of pavement and sidewalks.
01/23/2020 08:01 PM UTC
CP002536 - Molecular Biology Building-Rooms 0112 and 0114-Remodel
The project consists of, but is not limited to, the conversion of two existing wet laboratories into space for a new electron microscope. Work includes, but is not limited to, interior demolition of the existing laboratories and construction of new walls, door, and interior finishes. Additional work includes modification of the sprinkler and ventilation systems, and installation of new lighting and electrical connections for new equipment.
12/12/2019 08:01 PM UTC
CP002605 - University Compost Facility-Soil Storage Building
The project consists of, but is not limited to, materials and labor for the installation of a pre-engineered open sided steel building with concrete floor and aprons.
12/05/2019 08:01 PM UTC
CP002622 - Zaffarano Physics Addition-Fan Coil Replacement-Phase 4
The project consists of, but is not limited to, the removal and replacement of fourteen (14) fan coil units and accessories and other work as detailed in the documents. Complete installation per each unit(s) in a single room to be completed in three (3) work days. This installation of new unit and accessories, insulation of piping, ductwork, and completion of control work. Moving and reinstallation of furniture or equipment by Owner, Contractor to coordinate.
11/21/2019 08:01 PM UTC
CP002614 - Bessey Hall-Rooms 0150 & 0153-Remodel
The project consists of, but is not limited to, new carpet and finishes; new corridor glazing; and electrical and mechanical upgrades.
11/19/2019 08:01 PM UTC
CP002214 - BioCentury Research Farm-Vehicle Dynamometer Facility-Concrete
The project consists of, but is not limited to, the demolition of the concrete floor in an existing building, digging an equipment pit, and installation of the concrete pit with footing drainage to house a vehicle dynamometer.
11/19/2019 08:01 PM UTC
CP002558 - East Hall-Exterior Envelope Repairs
The project consists of, but is not limited to, clean and repair exterior brick, repair damaged stone, paint lintels, paint soffits, and remove and replace asphalt shingle roof system with new asphalt shingle system.
11/14/2019 08:01 PM UTC
CP002601 - BioCentury Research Farm-Site Drainage Improvements
The project consists of, but is not limited to, materials and labor for the installation of a storm sewer system and regrading of existing gravel lots.
10/22/2019 07:01 PM UTC
CP002405 - Parking Lots-LED Lighting Upgrades
The project consists of, but is not limited to, replacing 309 old parking lot light fixtures with new, more efficient, LED light fixtures.
10/17/2019 07:01 PM UTC
CP002618 - BioCentury Research Farm-North Parking Lot-Paving
The project consists of, but is not limited to, removal of the existing gravel and some of the compacted subgrade material from the existing north parking lot, placing the removed gravel to the proper elevation, and installing bioasphalt surface. Work also includes the removal of a small amount of a concrete sidewalk and installing a new concrete sidewalk.
10/17/2019 07:01 PM UTC