CP1289828-Communications Building-Rooms 1115 and 1154-Remodel
This project will remodel approximately 2,550 GSF in the Communications Building Suite 1115 and Room 1154. Work includes, but is not limited to, demolition, construction, mechanical and electrical improvements, paint, carpet, and lighting.
10/16/2025 07:01 PM UTC
CP1015970-Human Nutritional Sciences Building-Textiles Science Teaching Laboratory-Remodel
This project proposes to remodel rooms 2003, 2110, 2116, 2118, 2124, and 2126 of the Human Nutritional Sciences Building (HNSB) to accommodate a Textiles Science Teaching Laboratory. A future project will include a first-floor remodel of HNSB to accommodate a Tearoom/Student-Run Restaurant (SRR). This project proposed to remodel approximately 2,417 gross square feet of the second floor of HNSB to a Textiles Science Teaching Laboratory (TSL). The TSL, temporarily located in Bessey Hall due to the rebuild of LeBaron Hall, will relocate to the new space. Work consists of demolition of interior space including existing walls, casework, equipment, and finishes. New work will include new walls, casework, fume hoods, finishes, and updated mechanical and electrical work to support the remodel.
10/30/2025 07:01 PM UTC
CP1239249-Patterson Hall-Laboratory Speaker Strobe-Installation
This Project consists of replacement of fire alarm notification appliances throughout Area G first floor and second floor of the Patterson Hall Building.
11/04/2025 08:01 PM UTC
CP1290583-Patterson Hall-Rooms 1107, 1220, 1222F, 1222G and 1222H-Remodel
This project will remodel rooms 1107, 1220, 1222F, 1222G, and 1222H. The scope of work includes, but is not limited to: removing a wall; patch and painting all walls; new flooring; new lighting; installing new sinks; demolishing existing casework and installing new casework and benching; relocating electrical receptacles; and modifying HVAC ductwork.
11/06/2025 08:01 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
CP002558 - East Hall-Exterior Envelope Repairs
The project consists of, but is not limited to, clean and repair exterior brick, repair damaged stone, paint lintels, paint soffits, and remove and replace asphalt shingle roof system with new asphalt shingle system.
11/14/2019 08:01 PM UTC
CP002601 - BioCentury Research Farm-Site Drainage Improvements
The project consists of, but is not limited to, materials and labor for the installation of a storm sewer system and regrading of existing gravel lots.
10/22/2019 07:01 PM UTC
CP002405 - Parking Lots-LED Lighting Upgrades
The project consists of, but is not limited to, replacing 309 old parking lot light fixtures with new, more efficient, LED light fixtures.
10/17/2019 07:01 PM UTC
CP002618 - BioCentury Research Farm-North Parking Lot-Paving
The project consists of, but is not limited to, removal of the existing gravel and some of the compacted subgrade material from the existing north parking lot, placing the removed gravel to the proper elevation, and installing bioasphalt surface. Work also includes the removal of a small amount of a concrete sidewalk and installing a new concrete sidewalk.
10/17/2019 07:01 PM UTC
CP002547 - Seed Science Building-Expansion
The project consists of, but is not limited to, a 1867sf expansion to the existing Seed Science Building at Iowa State University which will feature 4 new growth-rooms. The addition will be slab-on-grade and constructed of load-bearing concrete masonry units (CMU) with brick veneer and a steel framed roof.
10/03/2019 07:01 PM UTC
CP002462 - Advanced Teaching & Research Building-5th Floor-Nanovaccine Institute
The project consists of, but is not limited to, new fit out space of a previously unoccupied upper floor of six-story research laboratory building. Spaces include research laboratories, associated faculty offices and support spaces. The existing structure consists of a cast-in-place concrete frame. Interiors include gypsum board on metal studs, acoustical ceiling tile, sealed concrete floors, and carpet tile. Mechanical, Piping, and Electrical systems are typical of a laboratory/office building.
09/05/2019 07:01 PM UTC
CP002586 - Bessey Hall-Sprinkler Replacement
The project consists of, but is not limited to, replacing all sprinkler heads and minor piping modifications.
09/05/2019 07:01 PM UTC
CP002585 - National Swine Research and Information Center-Sprinkler System Modifications
The project consists of, but is not limited to, replacing all standard response sprinkler heads with quick response sprinkler heads, upsizing the cross mains, and modifying the main service.
08/27/2019 07:01 PM UTC
CP002551 - Lagomarcino Hall-Southwest Wing-Remodel
The project consists of, but is not limited to, space reconfiguration, new lighting, finish modernization, and minor HVAC modifications.
08/01/2019 07:01 PM UTC
CP002440 - Utilities-Applied Science 1-Electrical Service Replacement
The project consists of, but is not limited to, installing a new secondary 480 volt electrical service from an exterior padmount City of Ames transformer to interior room in building basement, boring a 4” PVC conduit to overhead power pole, installing new service entrance main breaker switchboard, and refeeding the existing 1600A main-tie-main switchboard. Project also includes electrical grounding work, existing pipe demolition in basement mechanical room, new utility metering, transformer concrete pad installation, and provide new light fixtures.
08/01/2019 07:01 PM UTC