General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1303338-Howe Hall-Room 1200 Remodel
****THIS BID HAS BEEN CANCELLED**** This project will remodel room 1200 in Howe Hall. Work includes, but is not limited to: demolition of existing cubicles; construction of two offices and a front reception space; associated mechanical and electrical improvements; painting; carpeting; and lighting.
04/02/2026 07:01 PM UTC
CP1300765-Town Engineering Building-Rooms 142, 148 and 156 Remodel
This project includes interior renovations to two existing lab spaces (Rooms 142 and 148) and one storage room (Room 156) at the west end of Town Engineering along the existing loading dock, totaling 3,000 square feet. The existing labs will be renovated to better support existing space uses and the existing storage room will be renovated into a cleaning and storage space. Demolition work includes but is not limited to; demolition of two existing concrete masonry walls, concrete slab, casework, and exterior access doors. New work includes but is not limited to: exterior wall patching and finishes. Mechanical scope includes but is not limited to: demolition of existing gas lines, new dust collection system, and replacement of existing grilles and diffusers. Electrical scope includes but is not limited to: renovations to power and lighting systems.
04/07/2026 07:01 PM UTC
CP1295340-Institutional Roads 2026-Pavement Preservation
Planned work includes, but is not limited to, asphalt and concrete improvements on various Institutional Roads segments across campus.
04/14/2026 07:01 PM UTC
CP1248808-Lake LaVerne-Improvements
The project consists of, but is not limited to, dewatering, excavation and disposal of lakebed sediment from Lake LaVerne as well as pavement removal, regrading of the lakebed, reshaping the lake edge, bank stabilization, placement of limestone outcropping and fieldstone along the lake edge, cut limestone walls, extending lake overflow channel, PCC sidewalks, railing replacement, site lighting, and seeding.
04/16/2026 07:01 PM UTC
CP1300581-Memorial Union-Roof Sections B, C, G, J, K, W, Z and 1 Replacement
MEMORIAL UNION-ROOF REPLACEMENT-SECTIONS G, Z, 1 This project will replace Memorial Union roof sections G, Z, and 1. The scope of work includes, but is not limited to, demolishing existing roof systems and replacing them with new roofing systems.
04/21/2026 07:01 PM UTC
CP1289859-Beardshear Hall-Rooms 0530, 0810, 0880, 3410 Improvement
Scope for Accounts Receivable, ID Card Office, Treasury, and a shared space in 3410 Beardshear for Accounts Receivable and Financial Aid. Accounts Receivable 0810 Beardshear: Reconfigure space to accommodate the ID Card Office 0810A: Reconfigure current Conference Room into two workstations and a small kitchenette 0810C: Reconfigure current office into two work stations to support ID Card 0880: Reconfigure AR Front Office to move kitchenette out and add small student workstations 0530 Beardshear: Remodel current card office for Treasury space 3410 Beardshear: Update paint and carpet, in addition to office furniture for 3410A, 3410C to allow for shared workspace offices
04/23/2026 07:01 PM UTC
CP1275129-Linden Residence Hall-North Retaining Wall-Repairs
This project will repair and replace segments of the retaining wall and replace stairs on the north side of Linden Residence Hall. The scope of work includes, but is not limited to, retaining wall footing and masonry replacement, site lighting, concrete stairs, sidewalk replacement, landscaping, and site drainage improvements. An accessible pedestrian and equipment access route will be provided to the plaza level.
04/28/2026 07:01 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
CP002622 - Zaffarano Physics Addition-Fan Coil Replacement-Phase 4
The project consists of, but is not limited to, the removal and replacement of fourteen (14) fan coil units and accessories and other work as detailed in the documents. Complete installation per each unit(s) in a single room to be completed in three (3) work days. This installation of new unit and accessories, insulation of piping, ductwork, and completion of control work. Moving and reinstallation of furniture or equipment by Owner, Contractor to coordinate.
11/21/2019 08:01 PM UTC
CP002614 - Bessey Hall-Rooms 0150 & 0153-Remodel
The project consists of, but is not limited to, new carpet and finishes; new corridor glazing; and electrical and mechanical upgrades.
11/19/2019 08:01 PM UTC
CP002214 - BioCentury Research Farm-Vehicle Dynamometer Facility-Concrete
The project consists of, but is not limited to, the demolition of the concrete floor in an existing building, digging an equipment pit, and installation of the concrete pit with footing drainage to house a vehicle dynamometer.
11/19/2019 08:01 PM UTC
CP002558 - East Hall-Exterior Envelope Repairs
The project consists of, but is not limited to, clean and repair exterior brick, repair damaged stone, paint lintels, paint soffits, and remove and replace asphalt shingle roof system with new asphalt shingle system.
11/14/2019 08:01 PM UTC
CP002601 - BioCentury Research Farm-Site Drainage Improvements
The project consists of, but is not limited to, materials and labor for the installation of a storm sewer system and regrading of existing gravel lots.
10/22/2019 07:01 PM UTC
CP002405 - Parking Lots-LED Lighting Upgrades
The project consists of, but is not limited to, replacing 309 old parking lot light fixtures with new, more efficient, LED light fixtures.
10/17/2019 07:01 PM UTC
CP002618 - BioCentury Research Farm-North Parking Lot-Paving
The project consists of, but is not limited to, removal of the existing gravel and some of the compacted subgrade material from the existing north parking lot, placing the removed gravel to the proper elevation, and installing bioasphalt surface. Work also includes the removal of a small amount of a concrete sidewalk and installing a new concrete sidewalk.
10/17/2019 07:01 PM UTC
CP002547 - Seed Science Building-Expansion
The project consists of, but is not limited to, a 1867sf expansion to the existing Seed Science Building at Iowa State University which will feature 4 new growth-rooms. The addition will be slab-on-grade and constructed of load-bearing concrete masonry units (CMU) with brick veneer and a steel framed roof.
10/03/2019 07:01 PM UTC
CP002462 - Advanced Teaching & Research Building-5th Floor-Nanovaccine Institute
The project consists of, but is not limited to, new fit out space of a previously unoccupied upper floor of six-story research laboratory building. Spaces include research laboratories, associated faculty offices and support spaces. The existing structure consists of a cast-in-place concrete frame. Interiors include gypsum board on metal studs, acoustical ceiling tile, sealed concrete floors, and carpet tile. Mechanical, Piping, and Electrical systems are typical of a laboratory/office building.
09/05/2019 07:01 PM UTC
CP002586 - Bessey Hall-Sprinkler Replacement
The project consists of, but is not limited to, replacing all sprinkler heads and minor piping modifications.
09/05/2019 07:01 PM UTC
281 - 290 of 395 Solicitations
1 2 25 26 27 29 31 32 33 39 40