CP1271058-Hamilton Hall-Room 0002-Remodel
This project will remodel the existing studio space. The scope of work includes, but is not limited to, removing a window from the vestibule wall and installing it in the control room wall; cutting an opening in the vestibule wall for a new window; cutting a large view window into the interior vestibule wood door; and painting all walls, door and window frames. This project also includes numerous lighting additions and upgrades, as well as a large amount of AV equipment.
| 08/21/2025 07:01 PM UTC |
Number | Deadline |
---|---|
CP002565 - Institutional Roads 2019-Pavement Preservation
The project consists of, but is not limited to, removal and replacement of PCC pavement, curb & gutter, storm sewer piping, storm intake, sidewalks and accessible ramps.
| 06/13/2019 07:01 PM UTC |
CP002556 - Johnny Majors Practice Field-Expansion
The project consists of, but is not limited to, the expansion of Johnny Majors Practice Field 35 feet to the east. This requires stripping the top organics from the existing field, removing the existing top 3” of sand and relocating to the east to create a new 10” sand profile. Scope also includes demolition of the existing east chain-link fence and installing new fence; grading from the new field edge to the new parkway; modifications to the existing irrigation system; and installation of subdrain.
| 06/06/2019 07:01 PM UTC |
CP002567-Molecular Biology Building-Common Area Improvements
The project consists of, but is not limited to, cleaning, painting, carpeting, refinishing wood benches, masonry block and tile repair, and lighting upgrades.
| 05/30/2019 07:01 PM UTC |
CP002571 - Lied Recreation Athletic Facility-Gasket Replacement
The project includes, but is not limited to, deepening grooves in the existing hydronic piping that is outside of tolerance limits and replacing existing couplings, valves, and flanges.
| 05/14/2019 07:01 PM UTC |
CP002559 - Carver Hall-Rooms 0129, 0131, 0150, 0171, and 0173 Remodel
The project consists of, but is not limited to, remodeling existing classroom and office space into new office and interview space.
| 04/25/2019 07:01 PM UTC |
CP002581 - Utilities-Maple Steam Vault-Expansion
The project consists of, but is not limited to, expanding the structure of existing vault located west of Maple Residence Hall, rerouting steam and condensate lines, installation of new vault lighting, and installation of sump pump.
| 04/25/2019 07:01 PM UTC |
CP002504 - Beyer Hall-Room 1451 Remodel
The project consists of, but is not limited to, work associated with creating two new offices; walls, doors, carpet tile and epoxy flooring, and new ceiling tile. Mechanical work includes new Air Handler, ductwork, and diffusers. Electrical includes new light fixtures, receptacles, and data jacks.
| 04/23/2019 07:01 PM UTC |
CP002549 - Lagomarcino Hall-Rooms W0081, W0079, and C0077W Remodel
The project consists of remodeling existing department space and two corridors and work includes, but is not limited to, ceiling and flooring replacement; lighting, mechanical, and electrical upgrades; new casework, paint, and furniture.
| 04/11/2019 07:01 PM UTC |
CP002560 - Parking Lot 85E-Resurfacing and Expansion
The work includes all materials, equipment, transportation, and labor necessary to complete the improvements. The project consists of, but is not limited to, clearing and grubbing, pavement removal, grading, intake replacement, storm sewer installation, subgrade preparation, curb & gutter, asphalt milling, HMA pavement, 5” PCC sidewalk, full-depth HMA patching, reinforced PCC stairs, pavement markings, parking lot light lighting , concrete encased duct bank, traffic control, surface restoration, construction survey, and miscellaneous associated work.
| 04/11/2019 07:01 PM UTC |
CP002568-Catt Hall-Rooms 0202, 0207, 0237, and 0251-Remodel
The project consists of, but is not limited to, rework of existing construction and addition of new offices at four locations within the second floor of Catt Hall. Mechanical, electrical, plumbing, sprinkler and communication systems to be modified and/or extended for new spaces. Coordinate work with furniture by Owner.
| 04/04/2019 07:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.