General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1289828-Communications Building-Rooms 1115 and 1154-Remodel
This project will remodel approximately 2,550 GSF in the Communications Building Suite 1115 and Room 1154. Work includes, but is not limited to, demolition, construction, mechanical and electrical improvements, paint, carpet, and lighting.
10/16/2025 07:01 PM UTC
CP1015970-Human Nutritional Sciences Building-Textiles Science Teaching Laboratory-Remodel
This project proposes to remodel rooms 2003, 2110, 2116, 2118, 2124, and 2126 of the Human Nutritional Sciences Building (HNSB) to accommodate a Textiles Science Teaching Laboratory. A future project will include a first-floor remodel of HNSB to accommodate a Tearoom/Student-Run Restaurant (SRR). This project proposed to remodel approximately 2,417 gross square feet of the second floor of HNSB to a Textiles Science Teaching Laboratory (TSL). The TSL, temporarily located in Bessey Hall due to the rebuild of LeBaron Hall, will relocate to the new space. Work consists of demolition of interior space including existing walls, casework, equipment, and finishes. New work will include new walls, casework, fume hoods, finishes, and updated mechanical and electrical work to support the remodel.
10/30/2025 07:01 PM UTC
CP1239249-Patterson Hall-Laboratory Speaker Strobe-Installation
This Project consists of replacement of fire alarm notification appliances throughout Area G first floor and second floor of the Patterson Hall Building.
11/04/2025 08:01 PM UTC
CP1290583-Patterson Hall-Rooms 1107, 1220, 1222F, 1222G and 1222H-Remodel
This project will remodel rooms 1107, 1220, 1222F, 1222G, and 1222H. The scope of work includes, but is not limited to: removing a wall; patch and painting all walls; new flooring; new lighting; installing new sinks; demolishing existing casework and installing new casework and benching; relocating electrical receptacles; and modifying HVAC ductwork.
11/06/2025 08:01 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
CP002510 - Heady Hall-Electrical Panel and Utility Safety Improvements-Phase 1
The project consists of, but is not limited to, furnishing all materials, labor, tools, expendable equipment, utility and transportation services, and all incidental items required for scope of work.
06/13/2019 07:01 PM UTC
CP002565 - Institutional Roads 2019-Pavement Preservation
The project consists of, but is not limited to, removal and replacement of PCC pavement, curb & gutter, storm sewer piping, storm intake, sidewalks and accessible ramps.
06/13/2019 07:01 PM UTC
CP002556 - Johnny Majors Practice Field-Expansion
The project consists of, but is not limited to, the expansion of Johnny Majors Practice Field 35 feet to the east. This requires stripping the top organics from the existing field, removing the existing top 3” of sand and relocating to the east to create a new 10” sand profile. Scope also includes demolition of the existing east chain-link fence and installing new fence; grading from the new field edge to the new parkway; modifications to the existing irrigation system; and installation of subdrain.
06/06/2019 07:01 PM UTC
CP002567-Molecular Biology Building-Common Area Improvements
The project consists of, but is not limited to, cleaning, painting, carpeting, refinishing wood benches, masonry block and tile repair, and lighting upgrades.
05/30/2019 07:01 PM UTC
CP002571 - Lied Recreation Athletic Facility-Gasket Replacement
The project includes, but is not limited to, deepening grooves in the existing hydronic piping that is outside of tolerance limits and replacing existing couplings, valves, and flanges.
05/14/2019 07:01 PM UTC
CP002559 - Carver Hall-Rooms 0129, 0131, 0150, 0171, and 0173 Remodel
The project consists of, but is not limited to, remodeling existing classroom and office space into new office and interview space.
04/25/2019 07:01 PM UTC
CP002581 - Utilities-Maple Steam Vault-Expansion
The project consists of, but is not limited to, expanding the structure of existing vault located west of Maple Residence Hall, rerouting steam and condensate lines, installation of new vault lighting, and installation of sump pump.
04/25/2019 07:01 PM UTC
CP002504 - Beyer Hall-Room 1451 Remodel
The project consists of, but is not limited to, work associated with creating two new offices; walls, doors, carpet tile and epoxy flooring, and new ceiling tile. Mechanical work includes new Air Handler, ductwork, and diffusers. Electrical includes new light fixtures, receptacles, and data jacks.
04/23/2019 07:01 PM UTC
CP002549 - Lagomarcino Hall-Rooms W0081, W0079, and C0077W Remodel
The project consists of remodeling existing department space and two corridors and work includes, but is not limited to, ceiling and flooring replacement; lighting, mechanical, and electrical upgrades; new casework, paint, and furniture.
04/11/2019 07:01 PM UTC
CP002560 - Parking Lot 85E-Resurfacing and Expansion
The work includes all materials, equipment, transportation, and labor necessary to complete the improvements. The project consists of, but is not limited to, clearing and grubbing, pavement removal, grading, intake replacement, storm sewer installation, subgrade preparation, curb & gutter, asphalt milling, HMA pavement, 5” PCC sidewalk, full-depth HMA patching, reinforced PCC stairs, pavement markings, parking lot light lighting , concrete encased duct bank, traffic control, surface restoration, construction survey, and miscellaneous associated work.
04/11/2019 07:01 PM UTC
281 - 290 of 372 Solicitations
1 2 25 26 27 29 31 32 33 37 38