Number Deadline
CP1253073-Communications Building-Suite 1200-Remodel
This project will remodel approximately 4,100 GSF in Communications Building Suite 1200, including rooms 1211, 1226, and 1227. Work includes, but is not limited to, demolition, construction, mechanical and electrical improvements, paint, carpet, lighting, and furniture.
05/13/2025 07:01 PM UTC
CP1259884-Stephens Auditorium-Utility Lines-Repair
This project will make corrections to certain sanitary drains currently tied-in to the storm sewer system. The scope of work includes, but is not limited to, permanently sealing or rerouting drains from an electrical room, two mechanical rooms, and one air handling unit.
05/22/2025 07:01 PM UTC
CP1119832-Beardshear Hall-Window Repairs-Phases 1 and 2-Phase 2
This project includes, but is not limited to, the restoration of existing wood windows and door frames at Beardshear Hall. All loose paint will be scraped off and any holes, splits, and damage to the existing wood frames will be patched and repaired to match existing shapes and sizes. The restoration includes professional repainting with premium exterior wood primer and paint. The existing original paint on the frames contains lead so all contractors working on this project will be required to adhere to the EPA Renovation, Repair, and Painting rule, which requires Lead Safe Work Practices.
05/22/2025 07:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP002544 - Zaffarano Physics Addition-Roof Replacement-Sections L-M
The project consists of, but is not limited to, complete roof system removal down to structural deck and replacement with new insulation and a fully adhered membrane system.
02/21/2019 08:01 PM UTC
CP002516 - Town Engineering Building-Heat and Smoke Detection
The project consists of, but is not limited to, addition of heat and smoke detectors throughout the building. VESDA shall be installed in two-story work areas and one-story areas with large structural pockets. Addressable strobes shall be installed in public areas, and the existing fire alarm control panel shall be relocated.
02/07/2019 08:01 PM UTC
CP002464 - Gilman Hall-Electrical Panel Replacement
The project consists of, but is not limited to, the replacement of a portion of Gilman Hall Electrical panels.
01/29/2019 08:01 PM UTC
CP002412 - Curtiss Hall-Third Floor Renovation
The project consists of, but is not limited to, the alteration of a classroom, office areas, and public hallways on the 3rd floor of Curtiss Hall.
01/24/2019 08:01 PM UTC
CP002492 - Scheman Building-Brunnier Art Museum-Storage and Entrance Remodel
The project consists of, but is not limited to, renovation of permanent collection storage and museum entrance including installation of high density compact storage units, installation of LED lighting, alteration of walls at museum entrance, updated materials and finishes at museum entrance, and remodel of existing office space to accommodate a second exit from the suite.
01/17/2019 08:01 PM UTC
CP002467 - Food Sciences Building-Room 2379 Renovation
The project consists of, but is not limited to, renovation of a teaching classroom, with general, mechanical, and electrical construction in adjacent areas to modify services to serve the classroom. Project includes roof modifications and patching.
12/13/2018 08:01 PM UTC
CP002487-Helser Residence Hall-Window Replacement
This project consists of, but is not limited to, the installation of new aluminum windows throughout Helser Residence Hall to replace existing windows removed under a separate abatement contract, (exceptions noted in documents). New accessory items to the window installation are included as well as patch, repair, and painting of existing wall construction where necessary to facilitate installation of new window assemblies. Construction will be completed during the summer of 2019 only—see Construction Progress Schedule and substantial completion dates.
12/13/2018 08:01 PM UTC
CP002536 - Science Hall 2-Rooms 0220, 0224 and 0228 Remodel
The remodel will convert one wet lab, a teaching prep room, and a small classroom into one larger multi-purpose room. The work will include, but is not limited to, demolishing dividing walls and modifying the mechanical and electrical systems as required; installing new acoustical lay-in ceiling grid and tile, light fixtures, carpet, whiteboards, and technology.
11/15/2018 08:01 PM UTC
CP002519 - Institutional Roads 2019-University Boulevard and Wallace Road Signal Replacement
The project consists of, but is not limited to, replacement of the existing traffic signals with new signals that meet current traffic control standards at the intersection of University Boulevard and Wallace Road on the Iowa State University campus. Scope of work includes new signal poles, heads, controllers, count down timers on the crosswalks, radar-based vehicle and bicycle detection, left turn flashing arrows, leading pedestrian interval phasing and ADA compliant crosswalk controls.
11/08/2018 08:01 PM UTC
CP002529 - Gilman Hall-Rooms 2659, 2701, and 2705 Remodel
The project consists of, but is not limited to, remodeling existing laboratories into office space.
11/08/2018 08:01 PM UTC
291 - 300 of 362 Solicitations