CP1271058-Hamilton Hall-Room 0002-Remodel
This project will remodel the existing studio space. The scope of work includes, but is not limited to, removing a window from the vestibule wall and installing it in the control room wall; cutting an opening in the vestibule wall for a new window; cutting a large view window into the interior vestibule wood door; and painting all walls, door and window frames. This project also includes numerous lighting additions and upgrades, as well as a large amount of AV equipment.
08/21/2025 07:01 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
CP002516 - Town Engineering Building-Heat and Smoke Detection
The project consists of, but is not limited to, addition of heat and smoke detectors throughout the building. VESDA shall be installed in two-story work areas and one-story areas with large structural pockets. Addressable strobes shall be installed in public areas, and the existing fire alarm control panel shall be relocated.
02/07/2019 08:01 PM UTC
CP002464 - Gilman Hall-Electrical Panel Replacement
The project consists of, but is not limited to, the replacement of a portion of Gilman Hall Electrical panels.
01/29/2019 08:01 PM UTC
CP002412 - Curtiss Hall-Third Floor Renovation
The project consists of, but is not limited to, the alteration of a classroom, office areas, and public hallways on the 3rd floor of Curtiss Hall.
01/24/2019 08:01 PM UTC
CP002492 - Scheman Building-Brunnier Art Museum-Storage and Entrance Remodel
The project consists of, but is not limited to, renovation of permanent collection storage and museum entrance including installation of high density compact storage units, installation of LED lighting, alteration of walls at museum entrance, updated materials and finishes at museum entrance, and remodel of existing office space to accommodate a second exit from the suite.
01/17/2019 08:01 PM UTC
CP002467 - Food Sciences Building-Room 2379 Renovation
The project consists of, but is not limited to, renovation of a teaching classroom, with general, mechanical, and electrical construction in adjacent areas to modify services to serve the classroom. Project includes roof modifications and patching.
12/13/2018 08:01 PM UTC
CP002487-Helser Residence Hall-Window Replacement
This project consists of, but is not limited to, the installation of new aluminum windows throughout Helser Residence Hall to replace existing windows removed under a separate abatement contract, (exceptions noted in documents). New accessory items to the window installation are included as well as patch, repair, and painting of existing wall construction where necessary to facilitate installation of new window assemblies. Construction will be completed during the summer of 2019 only—see Construction Progress Schedule and substantial completion dates.
12/13/2018 08:01 PM UTC
CP002536 - Science Hall 2-Rooms 0220, 0224 and 0228 Remodel
The remodel will convert one wet lab, a teaching prep room, and a small classroom into one larger multi-purpose room. The work will include, but is not limited to, demolishing dividing walls and modifying the mechanical and electrical systems as required; installing new acoustical lay-in ceiling grid and tile, light fixtures, carpet, whiteboards, and technology.
11/15/2018 08:01 PM UTC
CP002519 - Institutional Roads 2019-University Boulevard and Wallace Road Signal Replacement
The project consists of, but is not limited to, replacement of the existing traffic signals with new signals that meet current traffic control standards at the intersection of University Boulevard and Wallace Road on the Iowa State University campus. Scope of work includes new signal poles, heads, controllers, count down timers on the crosswalks, radar-based vehicle and bicycle detection, left turn flashing arrows, leading pedestrian interval phasing and ADA compliant crosswalk controls.
11/08/2018 08:01 PM UTC
CP002529 - Gilman Hall-Rooms 2659, 2701, and 2705 Remodel
The project consists of, but is not limited to, remodeling existing laboratories into office space.
11/08/2018 08:01 PM UTC
CP002488 - Birch-Welch-Roberts-Residence Halls-Window Replacement
This project consist of, but is not limited to, the installation of new aluminum windows throughout Birch, Welch, and Roberts Residence Halls to replace existing windows removed under a separate abatement contract, (exceptions noted in documents). New accessory items to the window installation are included as well as patch, repair, and painting of existing wall construction to facilitate installation of new window assemblies. Construction will be completed during the summer of 2019 only—see Construction Progress Schedule and substantial completion dates.
11/01/2018 07:01 PM UTC