CP1279411-Durham Center-Heating Water Piping-Replacement
This project will replace the heating system piping throughout the Durham Center. The scope of work includes, but is not limited to, the removal of existing piping, risers, valves and supports. Included is the replacement of all materials, including new riser valves to enhance system control and efficiency. Any abatement of hazardous materials will be handled by the university.
06/26/2025 07:01 PM UTC
CP1280467-Agronomy Hall-Room G0525-Renovation
The scope of work includes, but is not limited to, classroom renovation involving demolition of existing built-in island, shelving and pegboards, and installation of new light fixtures with dimming capabilities, new rubber flooring, painting, and new classroom furniture.
07/01/2025 07:01 PM UTC
CP1275701-Durham Center-Room 0139-Remodel
This project will remodel a previously occupied computer lab space to include both open office space and private office spaces. This project includes, but is not limited to, new walls, flooring, paint, and furniture; additional mechanical equipment and controls for private offices; existing mechanical modifications; sprinkler modifications; and new lighting and lighting controls.
07/08/2025 07:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP002467 - Food Sciences Building-Room 2379 Renovation
The project consists of, but is not limited to, renovation of a teaching classroom, with general, mechanical, and electrical construction in adjacent areas to modify services to serve the classroom. Project includes roof modifications and patching.
12/13/2018 08:01 PM UTC
CP002487-Helser Residence Hall-Window Replacement
This project consists of, but is not limited to, the installation of new aluminum windows throughout Helser Residence Hall to replace existing windows removed under a separate abatement contract, (exceptions noted in documents). New accessory items to the window installation are included as well as patch, repair, and painting of existing wall construction where necessary to facilitate installation of new window assemblies. Construction will be completed during the summer of 2019 only—see Construction Progress Schedule and substantial completion dates.
12/13/2018 08:01 PM UTC
CP002536 - Science Hall 2-Rooms 0220, 0224 and 0228 Remodel
The remodel will convert one wet lab, a teaching prep room, and a small classroom into one larger multi-purpose room. The work will include, but is not limited to, demolishing dividing walls and modifying the mechanical and electrical systems as required; installing new acoustical lay-in ceiling grid and tile, light fixtures, carpet, whiteboards, and technology.
11/15/2018 08:01 PM UTC
CP002519 - Institutional Roads 2019-University Boulevard and Wallace Road Signal Replacement
The project consists of, but is not limited to, replacement of the existing traffic signals with new signals that meet current traffic control standards at the intersection of University Boulevard and Wallace Road on the Iowa State University campus. Scope of work includes new signal poles, heads, controllers, count down timers on the crosswalks, radar-based vehicle and bicycle detection, left turn flashing arrows, leading pedestrian interval phasing and ADA compliant crosswalk controls.
11/08/2018 08:01 PM UTC
CP002529 - Gilman Hall-Rooms 2659, 2701, and 2705 Remodel
The project consists of, but is not limited to, remodeling existing laboratories into office space.
11/08/2018 08:01 PM UTC
CP002488 - Birch-Welch-Roberts-Residence Halls-Window Replacement
This project consist of, but is not limited to, the installation of new aluminum windows throughout Birch, Welch, and Roberts Residence Halls to replace existing windows removed under a separate abatement contract, (exceptions noted in documents). New accessory items to the window installation are included as well as patch, repair, and painting of existing wall construction to facilitate installation of new window assemblies. Construction will be completed during the summer of 2019 only—see Construction Progress Schedule and substantial completion dates.
11/01/2018 07:01 PM UTC
CP002511 - Zaffarano Physics Addition-Fan Coil Replacement-Phase 3
The project consists of, but is not limited to, the removal and replacement of fifty-five (55) fan coil units and accessories. Complete installation per each unit(s) in a single room to be completed in three (3) work days. Work involves installation of new unit and accessories, insulation of piping, ductwork, and completion of control work. Moving and reinstallation of furniture or equipment by Owner, Contractor to coordinate.
10/23/2018 07:01 PM UTC
CP002411 - Curtiss Hall-Second Floor Renovation
The Project consists of the alteration of public hallways and office areas on second floor of Curtiss Hall, including the addition of a single use restroom, lactation room, and custodian’s closet.
09/27/2018 07:01 PM UTC
CP002225 - Student Innovation Center-Issuance 5-Food Service Rebid
The project consists of, but is not limited to, a 138,973 sf new building, that includes a basement and four (4) floors above grade. Work includes food service equipment for a café and demonstration kitchen.
09/18/2018 07:01 PM UTC
CP002532 - Veterinary Medical Research Institute-Buildings 1-6 Condensate Returns Replacement
The project consists of, but is not limited to, installation of a new low-pressure condensate return system between buildings 1 through 6 at Veterinary Medical Research Institute (VMRI). Work includes abandonment or removal or existing condensate lines, installation of new condensate return piping between buildings, connection of new piping to existing service inside each building, and removal and replacement of concrete sidewalk as needed for installation.
09/13/2018 07:01 PM UTC