General Info

Business Logo

City of Findlay

318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
1001
City of Findlay Fire Hydrants, Gate Valves, & Sewer Pipes RFB - The City of Findlay is accepting proposals for the period January 1, 2026 to December 31, 2026.
12/22/2025 04:30 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
1601
Item #1601-Ready Mix Concrete - The City of Findlay is accepting proposals for Ready Mix Concrete for the period January 1, 2024 to December 31, 2024.
10/17/2023 06:00 PM UTC
31
Item #31-Refuse Removal - The City of Findlay is accepting proposals for Refuse Removal for the period January 1, 2024 to December 31, 2024.
10/17/2023 06:00 PM UTC
22
Item #22 - Iron Pipe- The City of Findlay is accepting proposals for Iron Pipe for the period January 1, 2024 to December 31, 2024.
10/17/2023 06:00 PM UTC
31
Item #31-Refuse Removal - The City of Findlay is accepting proposals for Refuse Removal for the period January 1, 2024 to December 31, 2024.
10/17/2023 12:00 PM UTC
1601
Item #1601-Ready Mix Concrete - The City of Findlay is accepting proposals for Ready Mix Concrete for the period January 1, 2024 to December 31, 2024.
10/17/2023 12:00 PM UTC
22
Item #22 - Iron Pipe- The City of Findlay is accepting proposals for Iron Pipe for the period January 1, 2024 to December 31, 2024.
10/17/2023 06:00 AM UTC
35790800
City of Findlay- Water Treatment Plant CO2 Tank Replacement Completion Date: August 8, 2024 Engineers Estimate: $1,050,000 Work under Contract includes, but is not limited to; furnishing and installing two new 30 ton vertical liquid carbon dioxide storage tanks; installation of all necessary piping, fittings, valves and controls for proper operation; new electrical feeds to and from building; foundations and concrete retaining walls for the tanks; site restoration; asphalt paving; and all other work required in accordance with the plans and contract documents.
08/17/2023 06:00 PM UTC
35730800
City of Findlay, Laurel Lane Waterline Replacement This project consists of installing a new 6-inch C909 waterline on Laurel Lane, running in the north side of the roadway, from Northridge Road to Sweetwater Road. Once the waterline installation is complete, the North half of Laurel Lane will be resurfaced. This project shall consist of, but not limited to, 640 LF of 6-inch C909 waterline, full depth pavement repair, waterline tie-ins, waterline abandonments, misc. fittings, pavement planning, asphalt resurfacing, curb replacement and seeding and mulching. Final Completion Date: December 1, 2023 Engineer’s Estimate: $113,775.00
08/15/2023 06:00 PM UTC
City of Findlay Airport Consulting and Engineering Services SOQ
Statement of Qualifications (SOQ) for FDY Airport Consulting and Engineering Services. The City of Findlay is requesting statements of qualification (SOQs) from qualified aviation consulting and engineering firm to provide professional planning, administration and engineering services for the City of Findlay Airport (FDY). This Request for Qualifications (RFQ) will result in a multi-year agreement with a consultant for a period of five (5) years. The selected consultant will then negotiate and enter into sub-agreements for services, based on the scope of work, with the City of Findlay on a project/assignment basis during the term of the five (5) year period. The selection process of a consultant is being done in accordance with Federal Aviation Administration (FAA) Advisory Circular 150/5100-14E, and applicable Ohio statutes and laws. The City of Findlay reserves the right to withdraw this RFQ, or reject any and all submittals in response to this RFQ for any reason at time during the bid process due to unforeseen or any change in circumstances. This RFQ plus the resulting agreement, shall be consistent with all terms and conditions associated with contracts entered into by the City of Findlay. The City of Findlay is not liable or responsible for any cost(s) incurred during the preparation, presentation or submission as a response to this RFQ.
08/09/2023 07:00 PM UTC
32823100, 32823200, 32823400 and 32831600
City of Findlay, 2023 Intersection Upgrades This project contains four intersections on Main Street and W. Main Cross Street that are in need of traffic signal upgrades. The four locations include: Hardin St. & Main St., Crawford St. & Main St., S. Cory St. & W. Main Cross St. and S. West St. & W. Main Cross St. All four locations are located within a quarter-mile of each other. Engineer Estimate: $135,505.00 Final Completion: December 15, 2023
08/09/2023 06:00 PM UTC
121 - 130 of 341 Solicitations
1 2 9 10 11 13 15 16 17 34 35