City of Findlay
318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121
318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Number | Deadline |
---|---|
22
Item #22 - Iron Pipe- The City of Findlay is accepting proposals for Iron Pipe for the period January 1, 2024 to December 31, 2024.
| 10/17/2023 06:00 AM UTC |
35790800
City of Findlay- Water Treatment Plant CO2 Tank Replacement
Completion Date: August 8, 2024
Engineers Estimate: $1,050,000
Work under Contract includes, but is not limited to; furnishing and installing two new 30 ton vertical liquid carbon dioxide storage tanks; installation of all necessary piping, fittings, valves and controls for proper operation; new electrical feeds to and from building; foundations and concrete retaining walls for the tanks; site restoration; asphalt paving; and all other work required in accordance with the plans and contract documents.
| 08/17/2023 06:00 PM UTC |
35730800
City of Findlay, Laurel Lane Waterline Replacement
This project consists of installing a new 6-inch C909 waterline on Laurel Lane, running in the north side of the roadway, from Northridge Road to Sweetwater Road. Once the waterline installation is complete, the North half of Laurel Lane will be resurfaced. This project shall consist of, but not limited to, 640 LF of 6-inch C909 waterline, full depth pavement repair, waterline tie-ins, waterline abandonments, misc. fittings, pavement planning, asphalt resurfacing, curb replacement and seeding and mulching.
Final Completion Date: December 1, 2023
Engineer’s Estimate: $113,775.00
| 08/15/2023 06:00 PM UTC |
City of Findlay Airport Consulting and Engineering Services SOQ
Statement of Qualifications (SOQ) for FDY Airport Consulting and Engineering Services.
The City of Findlay is requesting statements of qualification (SOQs) from qualified aviation consulting and engineering firm to provide professional planning, administration and engineering services for the City of Findlay Airport (FDY).
This Request for Qualifications (RFQ) will result in a multi-year agreement with a consultant for a period of five (5) years. The selected consultant will then negotiate and enter into sub-agreements for services, based on the scope of work, with the City of Findlay on a project/assignment basis during the term of the five (5) year period.
The selection process of a consultant is being done in accordance with Federal Aviation Administration (FAA) Advisory Circular 150/5100-14E, and applicable Ohio statutes and laws. The City of Findlay reserves the right to withdraw this RFQ, or reject any and all submittals in response to this RFQ for any reason at time during the bid process due to unforeseen or any change in circumstances. This RFQ plus the resulting agreement, shall be consistent with all terms and conditions associated with contracts entered into by the City of Findlay. The City of Findlay is not liable or responsible for any cost(s) incurred during the preparation, presentation or submission as a response to this RFQ.
| 08/09/2023 07:00 PM UTC |
32823100, 32823200, 32823400 and 32831600
City of Findlay, 2023 Intersection Upgrades
This project contains four intersections on Main Street and W. Main Cross Street that are in need of traffic signal upgrades. The four locations include: Hardin St. & Main St., Crawford St. & Main St., S. Cory St. & W. Main Cross St. and S. West St. & W. Main Cross St. All four locations are located within a quarter-mile of each other.
Engineer Estimate: $135,505.00
Final Completion: December 15, 2023
| 08/09/2023 06:00 PM UTC |
35782800
City of Findlay Water Infrastructure Improvements:.
Work under Contract includes, but is not limited to, replacing existing five (5) valve vault valves with actuators (supplied by the City of Findlay) and piping, rehabilitating the two (2) concrete reservoir transfer pipes and two (2) reservoir outlet pipes – Alt. #1, and automating the valves at pump station #1 to open for emergency draining of the reservoirs. The work also includes sodium permanganate system at Reservoir #1. Included, but not limited to, are electrical pull boxes, metering chambers, piping installed by open-cut and trenchless methods, and all other work required in accordance with the contract documents.
• Maintain water supply to treatment plant, shout down time allowed to install valves/line pipes is six (6) hours maximum.
• Condition of raw water transmission main to plant is unknown. Material of 36” raw water line is concrete pipe and construction took place in 1959, see existing plans. Contractor to exercise extreme caution when pressurizing and depressurizing this line.
• Reservoirs must remain balanced, 16’ differential results in ”flow” from res. 2 to res. 1 trough common duke wall.
• Sluice gates from reservoirs to outlet pipes do not necessarily provide tight seal, dewatering and plug at reservoir may be required.
Work will include installation of valves purchased by the City of Findlay. Bidders are advised to pay close attention to the specific details in the Supplemental Specifications and Project Manual. Item descriptions detail all that is included with each pay item as well as pay limits for certain items.
Anticipated project start date is Oct. 1, 2023.
Substantial Completion Date: June 1, 2024
Final Completion Date: Aug. 1, 2024
Engineer’s Estimate: Base Bid – $1,785,000
Bid Alternate #1 – $180,000
| 07/13/2023 03:00 PM UTC |
31920900
MUNICIPAL BUILDING ELEVATOR MODERNIZATION - REBID
The City of Findlay Municipal Building, located at 318 Dorney Plaza, was constructed in 1983-84. The existing elevators are in need of modernization. Project consists of: Modernization of an existing elevator including controllers, car top selectors, power units (includes new pumps, motors, and operating valves), car door operators, door hanger rollers, interlock contacts, pick up roller assemblies, car door detectors, and car and hall fixtures. This shall be bid as a Turnkey Contract including all items in the specifications and as necessary to complete the project.
Engineering Estimate: $ 340,000
| 06/07/2023 06:00 PM UTC |
35720200
City of Findlay Harrison Street Waterline
This project consists of installing a new 8-inch C909 waterline on Harrison Street, running along the East side of the roadway, from Logan Avenue to Byal Avenue. The new waterline will be tied into the existing 8-inch waterline stub on Logan Avenue and extend south to tie into the existing 6-inch waterline on the South side of Byal Avenue. This project shall consist of, but not limited to, 330 LF of 8-inch C909 waterline, full depth pavement repair, waterline tie-ins, misc. fittings, seeding and mulching.
This project is funded by City of Findlay Water Fund. Bidders shall be aware of the required Equal Employment Opportunity Requirements as well as the State Prevailing Wages that apply to this project. Domestic steel use requirements also apply to this project as specified in Section 153.011 of the Ohio Revised Code. A copy of Section 153.011 can be obtained from any office of the Ohio Department of Administrative Services.
Final Completion Date: August 18, 2023
Engineer’s Estimate: $57,000.00
| 03/28/2023 06:00 PM UTC |
31920900
MUNICIPAL BUILDING ELEVATOR MODERNIZATION
The City of Findlay Municipal Building, located at 318 Dorney Plaza, was constructed in 1983-84. The existing elevators are in need of modernization. Project consists of: Modernization of an existing elevator including controllers, car top selectors, power units (includes new pumps, motors, and operating valves), car door operators, door hanger rollers, interlock contacts, pick up roller assemblies, car door detectors, and car and hall fixtures.
Engineering Estimate: $ 140,000
| 02/28/2023 06:00 PM UTC |
32830400-A
City of Findlay 2023 Annual Resurfacing Program-Contract A (Concrete)
This project consists of nearly 23,157 (LF) of curb removal and replacement on various streets within the City of Findlay in Hancock County. Incidental items include necessary sidewalk or curb ramp replacement (approximately 14,922 SF), concrete drive replacement (approximately 1851 SY), asphalt drive replacement (approximately 300 SY), adjustment of manholes and catch basins, grading and seeding. Other minor work is described in the details for each segment of roadway. The project will be split up into two different groups to ensure some of the larger sections of road are completed before school is in session.
The 2019 Ohio Department of Transportation (ODOT) Construction and Materials Specifications shall be followed. Required modifications to the ODOT specifications are noted herein. City of Findlay Specifications and Standard Drawings shall also be adhered to where applicable and are available at the City of Findlay Engineering Department, 318 Dorney Plaza, Findlay, OH 45840.
The project is funded through the City of Findlay’s Capital Improvements Fund. State prevailing wages and the City of Findlay income taxes shall apply.
The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any accepted Alternates as selected by the City of Findlay.
Final Completion for Each Group:
Group One: On or Before June 30, 2023 (See Streets Below)
Group Two: On or Before August 4, 2023 (See Streets Below)
Engineering Estimate: $ 1,015,000 (Base Bid)
| 02/21/2023 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.