General Info

Business Logo

City of Findlay

318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
35650800
2025 Annual Sewer Cleaning (Large Diameter) Project Description The project shall consist of the cleaning and televising of several aging and deteriorating sanitary sewer lines in the City of Findlay. The primary objective is to provide the City with a good visual inspection of the condition of the sewers. The Base Bid includes several sewer locations in different areas of the City. Some sewer lines are in close proximity of each other while others are somewhat isolated. The sizes to be cleaned include 15-inch, 20-inch, 24-inch, 30-inch, 36-inch, 42-inch, 45-inch, 48-inch, 51-inch and 66-inch sewers. Bidders are requested to provide a unit price per foot based on the size of host pipe. If sizes, lengths, or any other changes significantly differ from the provided information, the City will work with the Contractor to make accurate price adjustments. Incidental items include but are not limited to mobilization, bypass pumping, dewatering, traffic control, etc. Bidders are advised to pay close attention to the specific details in the General Notes and Pay Item Descriptions. Item descriptions detail all that is included with each pay item as well as pay limits for certain items. During construction, maintenance of traffic and access to local businesses and residences will be major concerns for the City, Contractor, and adjacent property owners. This project is located within the City of Findlay corporation limits and is thereby eligible for City Income Tax collection. The project is funded by City of Findlay local funds. Bidders should be aware of any required Equal Employment Opportunity Requirements as well as the State Prevailing Wages that apply to this project. Completion Date: October 3, 2025 Engineering Estimate (Base Bid Only): $220,000.00
06/24/2025 06:00 PM UTC
35652600
Sherry Street Sanitary Sewer Replacement This project consists of removing 257 feet of an existing 18” sanitary sewer pipe and replacing with SDR26 on Sherry Street from the first manhole south of Sixth Street North. A new manhole will be set 50 feet South of the existing manhole on the North side of Sixth Street. The sanitary sewer needs to be operational each night. There are also 7 laterals that will need to be tied in to this section of the new sanitary sewer. This project will also include a 10-foot spot repair on the existing 12” sanitary sewer on Sherry Street from the manhole North of Pearl Street to the next manhole North. This section of 12” sanitary sewer pipe will be replaced with SDR35. There are 2 laterals to reconnected in this section. Bidders are advised to visit the site before turning in price. If needed the Engineering Department will be available to meet on site to go over any specific questions. Bidders are advised to pay close attention to the specific details in the Supplemental Specifications and Pay Item Descriptions. Item descriptions detail all that is included with each pay item as well as pay limits for certain items. During construction, maintenance of traffic and access to local businesses and residences will be major concerns for the City, contractor, and adjacent property owners. This project is located within the City of Findlay corporation limits and is thereby eligible for City Income Tax collection. Bidders shall be aware of any required Equal Employment Opportunity Requirements as well as the State Prevailing Wages that apply to this project. After the bid date, contracts will be awarded as soon as possible in order to expedite securing materials and beginning construction. Specific Notes: 1. The existing 18” sanitary sewer is roughly 16 FT deep at the downstream manhole and 15 FT deep at the upstream manhole. 2. Sanitary service must be maintained during the project. Final Completion Date: October 17th, 2025 Engineering Estimate: $127,125.00
06/24/2025 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
32811800
City of Findlay HAN-Findlay Bright Road Phase II, PID108772 This project consists of nearly 8,400 linear feet of curb removal and replacement and/or pavement planning (approximately 30,105 SY) and resurfacing (approximately 1,673 CY) on Bright Road within the City of Findlay and Hancock County. Incidental items include necessary sidewalk or curb ramp replacement (approximately 2,600 SF), treatment of shoulders, adjustment of manholes and catch basins, and grading and seeding. Other minor work is described in the details for each segment of pavement. The 2019 Ohio Department of Transportation (ODOT) Construction and Materials Specifications shall be followed. Required modifications to the ODOT specifications are noted herein. City of Findlay Specifications and Standard Drawings shall also be adhered to where applicable and are available at the City of Findlay Engineering Department, 318 Dorney Plaza, Findlay, OH 45840. Federal prevailing wages shall apply. The DBE goal for this project is 6%. All Bidders shall submit a DBE Utilization Plan at the time of bid setting forth specific information demonstrating how the Bidder will achieve the DBE goal. By submitting a DBE Utilization Plan, the Bidder is affirming that they will be using the DBE firms identified in the Utilization Plan to meet the DBE contract goal. The DBE Utilization Plan shall be submitted online at:https://odot.formstack.com/forms/dbe_copy Final Completion: on or before August 5, 2022 Engineering Estimate: $ 667,616.00
01/25/2022 07:00 PM UTC
35611600
City of Findlay Spring Lake Sanitary Upgrade - 35611600 This project consists of installing 2,072 feet of 15” diameter sanitary sewer along S. Main Street from the southern City Limits to approximately 130’ north of Rosemont Drive. Included in the sanitary sewer improvement is the connection to existing sewer lines, abandonment of the Eagle Creek Pump Station, Lagoons and Forcemain, manhole installations, asphalt pavement trench repair, rock excavation, grading and seeding, and sidewalk replacement. Final Completion: on or before July 1, 2022 Engineering Estimate: $ 376,510.75
01/25/2022 07:00 PM UTC
Findlay Downtown Community Park & Recreation Area
Request for Qualifications (RFQ) for Downtown Community Park & Recreation Area As part of ongoing flood mitigation efforts throughout Hancock County, a benching project is estimated to begin construction in 2022. It is the desire of the City and other local stakeholders to determine how the benched area may also provide recreational, entertainment, and general community benefit. For this reason, the City is looking for a design firm to assist in development of a plan for this area while also ensuring the following criteria are met; protect maximum flood mitigation benefit, deed restrictions followed, and broad community benefit. In conjunction with this project the City and Hancock Park District would like the project scope to include the Findlay Downtown Riverwalk area along the South bank of the river from Cory Street on the West to Anchor Park at Front Street on the East (approximately 1,850 linear feet).
12/17/2021 10:00 PM UTC
13
Item #13 - Asphalt Concrete- The City of Findlay is accepting proposals for Iron Pipe for the period January 1, 2022 to December 31, 2022.
12/14/2021 07:00 PM UTC
66
Item #66 -Copper Sulfate Pentahydrate Crystals - The City of Findlay is accepting proposals for Copper Sulfate Pentahydrate Crystals for the period January 1, 2022 to December 31, 2022.
11/30/2021 07:00 PM UTC
67
Item #67 -Sodium Percarbonate Peroxyhydrate Granules - The City of Findlay is accepting proposals for Sodium Percarbonate Peroxyhydrate Granules for the period January 1, 2022 to December 31, 2022.
11/30/2021 07:00 PM UTC
68
Item #68 - Copper Sulfate Pentahydrate Liquid - The City of Findlay is accepting proposals for Copper Sulfate Pentahydrate Liquid for the period January 1, 2022 to December 31, 2022.
11/30/2021 07:00 PM UTC
69
Item #69 -Large Diameter and Gate Valve The City of Findlay is accepting proposals for Large Diameter and Gate Valves with electric actuators, for the period January 1, 2022 to December 31, 2022.
11/30/2021 07:00 PM UTC
2
Item #2 - Fluorosilicic Acid- The City of Findlay is accepting proposals for Fluoroslicic Acid for the period January 1, 2022 to December 31, 2022.
11/02/2021 06:00 PM UTC
3
Item #3 -Liquid Sodium Permanganate- The City of Findlay is accepting proposals for Liquid Sodium Permanganate for the period January 1, 2022 to December 31, 2022.
11/02/2021 06:00 PM UTC
151 - 160 of 307 Solicitations
1 2 12 13 14 16 18 19 20 30 31