City of Findlay
318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121
318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
1001
City of Findlay Fire Hydrants, Gate Valves, & Sewer Pipes RFB - The City of Findlay is accepting proposals for the period January 1, 2026 to December 31, 2026.
| 12/22/2025 04:30 PM UTC |
| Number | Deadline |
|---|---|
|
Request for Qualifications A/E Services for City of Findlay ADA compliance in the Municipal Building Restrooms
The CITY desires to obtain architectural services to evaluate public restrooms in CITY owned facilities, specifically the Municipal Building, to address ADA compliance concerns. The selected consultant will then be asked to provide design documents to correct deficiencies.
| 05/31/2022 06:00 PM UTC |
|
SOQ for STRICT Center D/B
The Council for the City of Findlay, Ohio is requesting statements of qualifications pursuant to Ohio Revised Code Section 153.65, et seq., from firms to provide design-build services for its Simulated Tactical Response & Incident Command Center Project. Requests for Qualifications may be obtained from Lee P. Rausch, PE, Assistant City Engineer at lrausch@findlayohio.com. Qualifications will be accepted until 2:00 p.m., local time, May 31, 2022.
| 05/31/2022 06:00 PM UTC |
|
35621200
Madison & Monroe Sanitary Phase II
This project consists removing approximately 480’ of existing 8-inch Vitrified Clay Pipe and replacing it with 8-inch SDR35 on Monroe Avenue from Morey Avenue to the first Manhole to the West. There are 11 existing laterals that will need to be tied into the new Sanitary Sewer. Sanitary Service must be maintained during the project.
Final Completion: August 5, 2022
Engineering Estimate: $150,000.00
| 05/17/2022 06:00 PM UTC |
|
35621200
Madison & Monroe Sanitary Phase II
This project consists removing approximately 480’ of existing 8-inch Vitrified Clay Pipe and replacing it with 8-inch SDR35 on Monroe Avenue from Morey Avenue to the first Manhole to the West. There are 11 existing laterals that will need to be tied into the new Sanitary Sewer. Sanitary Service must be maintained during the project.
Final Completion: August 5, 2022
Engineering Estimate: $97,991.50
| 04/26/2022 06:00 PM UTC |
|
Request for Qualifications Architect/Engineer Services for the City of Findlay Municipal Court CASC Facility
The City of Findlay Municipal Court (hereinafter referred to as “CITY”) is requesting Statements of Qualification (SOQs) to provide architectural/engineering services for the planning and design process needed for the construction of a Community Alternative Sentencing Center (CASC).
| 03/17/2022 06:00 PM UTC |
|
32820500A
City of Findlay 2022 Annual Resurfacing Program-Contract A (Concrete)
This project consists of nearly 21,930 (LF) of curb removal and replacement on various streets within the City of Findlay in Hancock County. Incidental items include necessary sidewalk or curb ramp replacement (approximately 8,436 SF), concrete drive replacement (approximately 1,024 SY), asphalt drive replacement (approximately 1,041 SY), adjustment of manholes and catch basins, grading and seeding. Other minor work is described in the details for each segment of roadway. The project will be split up into two different groups to ensure some of the larger sections of road are completed before school is in session.
The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any accepted Alternates as selected by the City of Findlay.
Final Completion for Each Group:
Group One: On or Before July 1, 2022
Group Two: On or Before August 5, 2022
Engineering Estimate: $ 775,000 (Base Bid)
| 03/16/2022 06:00 PM UTC |
|
32820500B
City of Findlay 2022 Annual Resurfacing Program-Contract B (Asphalt)
This contract is for asphalt work only, consisting of pavement planning (approximately 21,440 SY) and asphalt resurfacing (approximately 3,071 CY) on various streets within the City of Findlay or Hancock County. Incidental items include, but not limited to, are adjustment of manholes, and joint sealing. Other minor work is described in the details for each segment of pavement. The project will be split up into two different groups to ensure some of the larger sections of road are completed before school is in session.
The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any accepted Alternates as selected by the City of Findlay.
Projected Start Date for Each Group:
Group One: On or Before June 27, 2022
Group Two: On or Before August 8, 2022
Final Completion for Each Group:
Group One: On or Before August 12, 2022
Group Two: On or Before October 14, 2022
Engineering Estimate: $ 575,000 (Base Bid)
| 03/16/2022 06:00 PM UTC |
|
35210500
City of Findlay Airport North Apron Rehabilitation
This project will consist of a reconstruction of the North Apron within the City of Findlay FDY property. This project shall consist of, but not limited too; full depth reconstruct of portions of the north apron, new concrete pads for airport staging, 4-inch mill and overlay of portions of the north apron, new storm system, installation of oil/water separators, and new pavement markings.
Pre-Bid Meeting will be held on Wednesday, March 8, 2022 at 11:00 AM at the Findlay Airport Terminal Building located at 1615 Gary Street, Findlay, OH 45840.
There is a DBE Goal of 6% for the project
Engineer's Estimate (Base Bid)- $2,093,100.00
Completion Date: November 2, 2022
| 03/15/2022 06:00 PM UTC |
|
Request for Qualifications Design/Build Services for City of Findlay STRICT Center
The City of Findlay (hereinafter referred to as “CITY”) is requesting statements of qualification (SOQs) to provide Design/Build services for the CITY’s Simulated Tactical Response & Incident Command Training (STRICT) Center.
The intent is to engage a CONTRACTOR to complete the design, construction documents and construction for the CITY’s STRICT Center. In particular, the CITY is seeking a CONTRACTOR with demonstrated expertise and competence in multi-agency training complexes for first responders.
Project is subject to Section 3 of the Housing and Urban Development Act of 1968. More information on Section 3 can be found via the above-mentioned link.
| 03/10/2022 07:00 PM UTC |
|
32803300
City of Findlay, State and Markle Reconstruction, OPWC
State and Markle Street will be reconstructed from Harmon Street to Parkside Place. State Street will be resurfaced and the existing curb and gutter will be removed and replaced with straight curb and Markle Street will be a newly built roadway with straight curb. New 4 ft. wide concrete sidewalk will be added to extend the existing sidewalks from Harmon Street to Parkside Place on both sides of the roadway. Along with the reconstruction of the roadway a new 6-inch waterline will be installed on the west side of State Street and the Northside in the roadway on Markle Street. A new storm sewer will also be installed on State and Markle Street in the roadway.
This project shall consist of, but not limited to, 1055 LF of 6-inch C909 waterline, waterline tie-ins, waterline abandonments, fire hydrant installation, misc. fittings, seeding and mulching, 700 LF of 12-inch storm sewer, 340 LF of 15-inch storm sewer, 5 LF of 18-inch storm sewer, 22 storm structures, 2030 LF of straight curb, 2620 SF of sidewalk, drive approach replacement, roadway excavation, embankment, and 225 CY of asphalt.
This project is funded by City of Findlay Water, Sewer, and Capitol Funds as well as Ohio Public Works Commission (OPWC). Bidders shall be aware of the required Equal Employment Opportunity Requirements as well as the State Prevailing Wages that apply to this project. Domestic steel use requirements also apply to this project as specified in Section 153.011 of the Ohio Revised Code. A copy of Section 153.011 can be obtained from any office of the Ohio Department of Administrative Services.
Final Completion Date: June 30, 2022
Engineer’s Estimate: $582,139.25
| 02/24/2022 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.