General Info

Business Logo

City of Findlay

318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
35650800
2025 Annual Sewer Cleaning (Large Diameter) Project Description The project shall consist of the cleaning and televising of several aging and deteriorating sanitary sewer lines in the City of Findlay. The primary objective is to provide the City with a good visual inspection of the condition of the sewers. The Base Bid includes several sewer locations in different areas of the City. Some sewer lines are in close proximity of each other while others are somewhat isolated. The sizes to be cleaned include 15-inch, 20-inch, 24-inch, 30-inch, 36-inch, 42-inch, 45-inch, 48-inch, 51-inch and 66-inch sewers. Bidders are requested to provide a unit price per foot based on the size of host pipe. If sizes, lengths, or any other changes significantly differ from the provided information, the City will work with the Contractor to make accurate price adjustments. Incidental items include but are not limited to mobilization, bypass pumping, dewatering, traffic control, etc. Bidders are advised to pay close attention to the specific details in the General Notes and Pay Item Descriptions. Item descriptions detail all that is included with each pay item as well as pay limits for certain items. During construction, maintenance of traffic and access to local businesses and residences will be major concerns for the City, Contractor, and adjacent property owners. This project is located within the City of Findlay corporation limits and is thereby eligible for City Income Tax collection. The project is funded by City of Findlay local funds. Bidders should be aware of any required Equal Employment Opportunity Requirements as well as the State Prevailing Wages that apply to this project. Completion Date: October 3, 2025 Engineering Estimate (Base Bid Only): $220,000.00
06/24/2025 06:00 PM UTC
35652600
Sherry Street Sanitary Sewer Replacement This project consists of removing 257 feet of an existing 18” sanitary sewer pipe and replacing with SDR26 on Sherry Street from the first manhole south of Sixth Street North. A new manhole will be set 50 feet South of the existing manhole on the North side of Sixth Street. The sanitary sewer needs to be operational each night. There are also 7 laterals that will need to be tied in to this section of the new sanitary sewer. This project will also include a 10-foot spot repair on the existing 12” sanitary sewer on Sherry Street from the manhole North of Pearl Street to the next manhole North. This section of 12” sanitary sewer pipe will be replaced with SDR35. There are 2 laterals to reconnected in this section. Bidders are advised to visit the site before turning in price. If needed the Engineering Department will be available to meet on site to go over any specific questions. Bidders are advised to pay close attention to the specific details in the Supplemental Specifications and Pay Item Descriptions. Item descriptions detail all that is included with each pay item as well as pay limits for certain items. During construction, maintenance of traffic and access to local businesses and residences will be major concerns for the City, contractor, and adjacent property owners. This project is located within the City of Findlay corporation limits and is thereby eligible for City Income Tax collection. Bidders shall be aware of any required Equal Employment Opportunity Requirements as well as the State Prevailing Wages that apply to this project. After the bid date, contracts will be awarded as soon as possible in order to expedite securing materials and beginning construction. Specific Notes: 1. The existing 18” sanitary sewer is roughly 16 FT deep at the downstream manhole and 15 FT deep at the upstream manhole. 2. Sanitary service must be maintained during the project. Final Completion Date: October 17th, 2025 Engineering Estimate: $127,125.00
06/24/2025 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
32894300
City of Findlay, Logan Avenue Reconstruction Phase III, OPWC FY20 This reconstruction project on Logan Avenue will be an extension to the previous two projects that were performed east of the proposed work site. Logan Avenue will be reconstructed from Tappan Avenue to Harrison Street. The existing roadway will be lowered by 6-10 inches to allow proper grading for a newly built roadway with straight curb extended to the west. A new 4 ft. wide concrete sidewalk will be installed on both sides of the roadway, and the grass area between the new sidewalk and curb will be regraded to properly drain. Along with the reconstruction of the roadway a new 8-inch waterline will be installed on the north side of Logan Avenue and the existing storm sewer on the south side of Logan Avenue will be extended to Harrison Street. This project shall consist of, but not limited to, 1230 LF of 8-inch C909 waterline, 125 LF of 12-inch waterline, waterline tie-ins, waterline abandonments, fire hydrant installation, misc. fittings, seeding and mulching, 185 LF of 30-inch storm sewer, 380 LF of 24-inch storm sewer, 335 LF of 15-inch storm sewer, 250 LF of 12-inch storm sewer, 18 storm structures, 2600 LF of straight curb, 6,940 SF of sidewalk, drive approach replacement, roadway excavation, embankment, and 375 CY of asphalt. This project is funded by City of Findlay Water, Sewer, and Capitol Funds as well as Ohio Public Works Commission (OPWC). Bidders shall be aware of the required Equal Employment Opportunity Requirements as well as the State Prevailing Wages that apply to this project. Domestic steel use requirements also apply to this project as specified in Section 153.011 of the Ohio Revised Code. A copy of Section 153.011 can be obtained from any office of the Ohio Department of Administrative Services. Final Completion Date: October 1, 2021 Engineer’s Estimate: $726,700
02/12/2021 07:00 PM UTC
32801400
City of Findlay HAN-Findlay Bright Road Phase I, PID108768 This project consists of nearly 2,513 linear feet of curb removal and replacement and/or pavement planning (approximately 42,187 SY) and resurfacing (approximately 2,347 CY) on Bright Road within the City of Findlay and Hancock County. Incidental items include necessary sidewalk or curb ramp replacement (approximately 3,480 SF), treatment of shoulders, adjustment of manholes and catch basins, and grading and seeding. Other minor work is described in the details for each segment of pavement. The 2019 Ohio Department of Transportation (ODOT) Construction and Materials Specifications shall be followed. Required modifications to the ODOT specifications are noted herein. City of Findlay Specifications and Standard Drawings shall also be adhered to where applicable and are available at the City of Findlay Engineering Department, 318 Dorney Plaza, Findlay, OH 45840. Federal prevailing wages shall apply. The DBE goal for this project is 7%. All Bidders shall submit a DBE Utilization Plan at the time of bid setting forth specific information demonstrating how the Bidder will achieve the DBE goal. By submitting a DBE Utilization Plan, the Bidder is affirming that they will be using the DBE firms identified in the Utilization Plan to meet the DBE contract goal. The DBE Utilization Plan shall be submitted online at:https://odot.formstack.com/forms/dbe_copy Final Completion: on or before August 6, 2021 Engineering Estimate: $ 633,894.25
01/26/2021 07:00 PM UTC
32803100 - Dr. Martin Luther Kind Jr. Parkway
Dr. Martin Luther King Jr. Parkway ***Pre-bid Meeting will be December 8, 2020 at 2:00pm in the City of Findlay Municipal Building. Project Description: Improvement of two intersections along Martin Luther King Jr. Parkway to raise the roadway profile. Perform necessary related work including drainage, retaining walls, drives, walk and signal improvements. Final Completion: July 30, 2021 Engineering Estimate: $1,667,577.54
12/18/2020 07:00 PM UTC
65
Item #65 - Motor and Pump Repair/Rebuilding - The City of Findlay is accepting proposals for Motor and Pump Repair/Rebuilding for the period January 1, 2021 to December 31, 2021.
12/16/2020 07:00 PM UTC
1
Item #1 - Pebble Lime (BULK) - The City of Findlay is accepting proposals for Pebble Lime (BULK) for the period January 1, 2021 to December 31, 2021.
12/16/2020 07:00 PM UTC
9
Item #9 - Ferric Chloride- The City of Findlay is accepting proposals for Ferric Chloride for the period January 1, 2021 to December 31, 2021.
12/16/2020 07:00 PM UTC
2
Item #2 - Fluorosilicic Acid- The City of Findlay is accepting proposals for Fluorosilicic Acid for the period January 1, 2021 to December 31, 2021.
12/16/2020 07:00 PM UTC
32
Item #32 - Vehicle & Equipment Fuel (Gasoline & Diesel)- The City of Findlay is accepting proposals for Vehicle & Equipment Fuel (Gasoline & Diesel) for the period January 1, 2021 to December 31, 2021.
12/16/2020 07:00 PM UTC
11
Item #11 - Soda Ash- The City of Findlay is accepting proposals for Soda Ash the period January 1, 2021 to December 31, 2021.
11/05/2020 07:00 PM UTC
31
Item #31 - Refuse Removal- The City of Findlay is accepting proposals for Refuse Removal for the period January 1, 2021 to December 31, 2021.
11/05/2020 07:00 PM UTC
191 - 200 of 307 Solicitations
1 2 16 17 18 20 22 23 24 30 31