General Info

Business Logo

City of Findlay

318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
1001
City of Findlay Fire Hydrants, Gate Valves, & Sewer Pipes RFB - The City of Findlay is accepting proposals for the period January 1, 2026 to December 31, 2026.
12/22/2025 04:30 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
1603
Item #1603 - Class C Concrete- The City of Findlay is accepting proposals for Class C Concrete for the period January 1, 2022 to December 31, 2022.
11/02/2021 06:00 PM UTC
2401
Item #1603 - Water Meter Lids- The City of Findlay is accepting proposals for Water Meter Lids for the period January 1, 2022 to December 31, 2022.
11/02/2021 06:00 PM UTC
2801
Item #2801 - Water Tapping Gates- The City of Findlay is accepting proposals for Water Tapping Gates for the period January 1, 2022 to December 31, 2022.
11/02/2021 06:00 PM UTC
22
Item #22 - Iron Pipe- The City of Findlay is accepting proposals for Iron Pipe for the period January 1, 2022 to December 31, 2022.
11/02/2021 06:00 PM UTC
11
Item #11 - Soda Ash- The City of Findlay is accepting proposals for Soda Ash for the period January 1, 2022 to December 31, 2022.
11/02/2021 06:00 PM UTC
City of Findlay STRICT Center- Criteria Architect & Engineer Services SOQ
Statement of Qualifications (SOQ) for STRICT CENTER-Criteria Architect/ Engineer Services The project scope includes providing criteria architectural/ engineering services for a design-build process needed for the construction of the Simulated Tactical Response and Incident Command Training (STRICT) Center. Services that are require are, but limited too, are; Criteria Architect to develop Program of Requirements, develop conceptual plans, provide cost estimates, develop specifications and design criteria sufficient for schematic design.
06/04/2021 06:00 PM UTC
32810400
City of Findlay Pavement Marking 2021 This project will consist of pavement marking in various locations across the City of Findlay. Due to fading existing pavement markings will need new paint to be applied to them. This project will consist of five different types of markings, dashed white (34.33 mile), dashed yellow (8.46 mile), double yellow (42.39 mile), white edge line (28.94 mile), and white channel line (4.40 mile). All paint must adhere to Ohio Manual of Uniform Traffic Control Devices standards. EXPECTED START DATE: July 19, 2021 FINAL COMPLETION DATE: October 1, 2021 ENGINEER’S ESTIMATE: $ 58,000
05/11/2021 06:00 PM UTC
32872100, 32872800, 32873100
City of Findlay, Main Street Intersections Traffic Signal Upgrade Phase I This project consists of upgrading the traffic signals at the intersections of Main St./ Lincoln St, Main St./ Main Cross St., and Main St./Sandusky St. in the City of Findlay. Engineer Estimate: $93,000 Final Completion: June 25, 2021
03/29/2021 06:00 PM UTC
32811000
Statement of Qualifications (SOQ) for ODOT Pre-qualified Consultants for West Main Cross Street Corridor and Safety Study SOQ Package Requirements can be downloaded for free but must be mailed/delivered to the City of Findlay as outlined in the documents. The project scope includes examining the West Main Cross Street corridor from Main Street to Interstate 75 to determine what issues may currently exist or may be expected in the near future, recommend possible improvements (if needed), determine the existing right-of-way to determine how the possible improvements would fit in the existing right-of-way, determine if any improvements qualify for any funding opportunities and if warranted, assist in the safety funding application process.
03/19/2021 06:00 PM UTC
32810900-B
City of Findlay 2021 Annual Resurfacing Program-Contract B (Asphalt) This contract is for asphalt work only, consisting of pavement planning (approximately 43,510 SY) and asphalt resurfacing (approximately 2,490 CY) on various streets within the City of Findlay or Hancock County. Incidental items include, but not limited to, are adjustment of manholes, and joint sealing. Other minor work is described in the details for each segment of pavement. The project will be split up into two different groups to ensure some of the larger sections of road are completed before school is in session. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any accepted Alternates as selected by the City of Findlay. Projected Start Date for Each Group: Group One: On or Before June 21, 2021 Group Two: On or Before August 9, 2021 Final Completion for Each Group: Group One: On or Before August 6, 2021 Group Two: On or Before October 15, 2021 Engineering Estimate: $ 554,000 (Base Bid)
03/10/2021 07:00 PM UTC
211 - 220 of 341 Solicitations
1 2 18 19 20 22 24 25 26 34 35