General Info

Business Logo

City of Findlay

318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
1001
City of Findlay Fire Hydrants, Gate Valves, & Sewer Pipes RFB - The City of Findlay is accepting proposals for the period January 1, 2026 to December 31, 2026.
12/22/2025 04:30 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
40)
Item #40 - Elevator Maintenance - The City of Findlay is accepting proposals for Elevator Maintenance for the period January 1, 2021 to December 31, 2021.
11/05/2020 07:00 PM UTC
40
Item #40 - Elevator Maintenance - The City of Findlay is accepting proposals for Elevator Maintenance for the period January 1, 2021 to December 31, 2021.
11/05/2020 07:00 AM UTC
26
Item #26 -Fire Hydrants- The City of Findlay is accepting proposals for Fire Hydrants for the period January 1, 2021 to December 31, 2021.
11/05/2020 07:00 AM UTC
1
Item #1 - Pebble Lime (BULK) - The City of Findlay is accepting proposals for Pebble Lime (BULK) for the period January 1, 2021 to December 31, 2021.
11/05/2020 07:00 AM UTC
35600600
City of Findlay 2020 Annual Sewer and Manhole Lining Program The project consists of no-dig rehabilitation of several deteriorating sanitary sewer lines in the City of Findlay (hereinafter referred to as “City”). Incidental to the lining shall be the reinstatement of sewer service laterals without excavation. The Base Bid includes several sewer locations in different areas of the City. Some sewer lines to be lined are in close proximity of each other while others are somewhat isolated. The sizes to be lined include 8-inch, 10-inch, 12-inch, 18-inch, 20-inch and 24-inch sewers. Bidders are requested to provide a unit price per foot based on the size of host pipe. If sizes, lengths, or any other changes significantly differ from the provided information, the City will work with the Contractor to make accurate price adjustments. Potential Additive Alternates: Potential additive alternates to the Contract are included and shall be used at the City’s discretion. If project funds are available, the City may designate any of these sewers for lining, manholes to be lined, or additional camera services. Only entire sections (from manhole to manhole) will be considered for lining. Completion Date: April 9, 2021 Engineering Estimate (Base Bid Only): $382,616
08/06/2020 06:00 PM UTC
35702700
City of Findlay Penrose Public Infrastructure Project This public infrastructure project will include the new construction of 415 LF of 8-inch waterline, and 464 LF of sidewalk located within the Birchaven Complex as a part of the Blanchard Valley Health System. Waterline Final Completion Date: August 31, 2020 Sidewalk Final Completion Date: December 31, 2021 Engineer’s Estimate: $86,295.00
07/16/2020 06:00 PM UTC
32884500
City of Findlay HAN-CR236-0.00, PID100184 This project consist of widening out County Road 236 one lane to the east from Sandusky St. (SR568) to Tiffin Ave. (US224) as well as installing a multiuse path on the east side of the right of way. The widening of County Road 236 will reconfigure the roadway to a three lane road consisting of two drive lanes and a center turn lane. Along with the roadway widening a new 10 ft. wide multiuse path will be installed on the east side of the roadway from Sandusky St. to Tiffin Ave. New curb and gutter will be placed on this section of roadway, which will also include the relocation of existing storm structures. This project consist of, but not limited to; installing 2,450 SF of concrete sidewalk, 56,860 SF of asphalt multiuse path, 1208 CY of Asphalt Concrete Surface Course, 514 CY Asphalt Concrete Intermediate Course, aggregate base, new storm lines and structures, and grading and seeding. The 2019 Ohio Department of Transportation (ODOT) Construction and Materials Specifications shall be followed. Required modifications to the ODOT specifications are noted herein. City of Findlay Specifications and Standard Drawings shall also be adhered to where applicable and are available at the City of Findlay Engineering Department, 318 Dorney Plaza, Findlay, OH 45840. Federal prevailing wages shall apply. The DBE goal for this project is 7%. All Bidders shall submit a DBE Utilization Plan at the time of bid setting forth specific information demonstrating how the Bidder will achieve the DBE goal. By submitting a DBE Utilization Plan, the Bidder is affirming that they will be using the DBE firms identified in the Utilization Plan to meet the DBE contract goal. The DBE Utilization Plan shall be submitted online at:https://odot.formstack.com/forms/dbe_copy Final Completion: on or before October 23, 2020 Engineering Estimate: $ 2,196,661.30
05/14/2020 06:00 PM UTC
35293400
City of Findlay Airport Taxiway A (A4 to A6) Rehabilitation Mill and overlay of Taxiway A from connector A4 through A^ at the Findlay Airport. There will be no geometry changes and the pavement markings will be updated to meet FAA Advisory Circular (AC) 150/5340-1M, Standards for Airport Markings, within the project limits. Pre-Bid Meeting will be held on Wednesday, May 6, 2020 at 11:00 AM at the Findlay Airport Terminal Building located at 1615 Gary Street, Findlay, OH 45840. The meeting will be held outside. There is a DBE Goal of 6% for the project Engineer's Estimate (Base Bid)- $397,937.00 Completion Date: October 23, 2020
05/14/2020 06:00 PM UTC
32876000
City of Findlay HAN-Lincoln & Blanchard Paths, PID104247 This project consist of a lane configuration of Blanchard Street between Sixth Street and Center Street to add dedicated bike lanes on the east and west side, reconstructed traffic signals at five signalized intersections, ADA compliant curb ramps, and resurfacing. In addition to the Blanchard Street lane configuration, a multi-use path will be constructed on the north side of Lincoln Street from Cory Street to Blanchard Street. The Lincoln Street portion of the project will also include upgrades to signalized pedestrian controls at 2 intersections and ADA compliant curb ramps. This project consist of, but not limited to, installing 30,000 SF of concrete sidewalk, 46,381 SY of pavement planning, 1933 CY of Asphalt Concrete Surface Course, 1200 LF of curb replacement aggregate base, new signs, upgrade 5 intersections, and grading and seeding. The 2019 Ohio Department of Transportation (ODOT) Construction and Materials Specifications shall be followed. Required modifications to the ODOT specifications are noted herein. City of Findlay Specifications and Standard Drawings shall also be adhered to where applicable and are available at the City of Findlay Engineering Department, 318 Dorney Plaza, Findlay, OH 45840. Federal prevailing wages shall apply. The DBE goal for this project is 7%. All Bidders shall submit a DBE Utilization Plan at the time of bid setting forth specific information demonstrating how the Bidder will achieve the DBE goal. By submitting a DBE Utilization Plan, the Bidder is affirming that they will be using the DBE firms identified in the Utilization Plan to meet the DBE contract goal. The DBE Utilization Plan shall be submitted online at:https://odot.formstack.com/forms/dbe_copy Substantial Completion: on or before October 23, 2020 Final Completion: on or before August 13, 2021 Engineering Estimate: $ 2,170,854.00
05/13/2020 06:00 PM UTC
35600100 - 2020 Annual Sewer Televising Program
City of Findlay 2020 Annual Sewer Televising Program-This program consists of performing closed circuit television inspection on various storm and sanitary sewers located within the City of Findlay. This program will assess the condition of the selected sewer lines, and present the information to the City of Findlay so that the information can be used to make decisions regarding rehabilitation and/ or replacement. The sewers will be rated by using a standardized field investigation approach to efficiently utilize time and resources when evaluating the selected sewers. This project shall consist of, but not limited to, sewer cleaning as necessary for proper sewer evaluating, CCTV recordings, evaluating and rating of recorded sewers, and electronic format submission of recorded/ evaluated sewers. Completion Date: April 10, 2021 Engineering Estimate (Base Bid Only): $730,000
05/12/2020 06:00 PM UTC
251 - 260 of 341 Solicitations
1 2 22 23 24 26 28 29 30 34 35