Number Deadline
35650800
2025 Annual Sewer Cleaning (Large Diameter) Project Description The project shall consist of the cleaning and televising of several aging and deteriorating sanitary sewer lines in the City of Findlay. The primary objective is to provide the City with a good visual inspection of the condition of the sewers. The Base Bid includes several sewer locations in different areas of the City. Some sewer lines are in close proximity of each other while others are somewhat isolated. The sizes to be cleaned include 15-inch, 20-inch, 24-inch, 30-inch, 36-inch, 42-inch, 45-inch, 48-inch, 51-inch and 66-inch sewers. Bidders are requested to provide a unit price per foot based on the size of host pipe. If sizes, lengths, or any other changes significantly differ from the provided information, the City will work with the Contractor to make accurate price adjustments. Incidental items include but are not limited to mobilization, bypass pumping, dewatering, traffic control, etc. Bidders are advised to pay close attention to the specific details in the General Notes and Pay Item Descriptions. Item descriptions detail all that is included with each pay item as well as pay limits for certain items. During construction, maintenance of traffic and access to local businesses and residences will be major concerns for the City, Contractor, and adjacent property owners. This project is located within the City of Findlay corporation limits and is thereby eligible for City Income Tax collection. The project is funded by City of Findlay local funds. Bidders should be aware of any required Equal Employment Opportunity Requirements as well as the State Prevailing Wages that apply to this project. Completion Date: October 3, 2025 Engineering Estimate (Base Bid Only): $220,000.00
06/24/2025 06:00 PM UTC
35652600
Sherry Street Sanitary Sewer Replacement This project consists of removing 257 feet of an existing 18” sanitary sewer pipe and replacing with SDR26 on Sherry Street from the first manhole south of Sixth Street North. A new manhole will be set 50 feet South of the existing manhole on the North side of Sixth Street. The sanitary sewer needs to be operational each night. There are also 7 laterals that will need to be tied in to this section of the new sanitary sewer. This project will also include a 10-foot spot repair on the existing 12” sanitary sewer on Sherry Street from the manhole North of Pearl Street to the next manhole North. This section of 12” sanitary sewer pipe will be replaced with SDR35. There are 2 laterals to reconnected in this section. Bidders are advised to visit the site before turning in price. If needed the Engineering Department will be available to meet on site to go over any specific questions. Bidders are advised to pay close attention to the specific details in the Supplemental Specifications and Pay Item Descriptions. Item descriptions detail all that is included with each pay item as well as pay limits for certain items. During construction, maintenance of traffic and access to local businesses and residences will be major concerns for the City, contractor, and adjacent property owners. This project is located within the City of Findlay corporation limits and is thereby eligible for City Income Tax collection. Bidders shall be aware of any required Equal Employment Opportunity Requirements as well as the State Prevailing Wages that apply to this project. After the bid date, contracts will be awarded as soon as possible in order to expedite securing materials and beginning construction. Specific Notes: 1. The existing 18” sanitary sewer is roughly 16 FT deep at the downstream manhole and 15 FT deep at the upstream manhole. 2. Sanitary service must be maintained during the project. Final Completion Date: October 17th, 2025 Engineering Estimate: $127,125.00
06/24/2025 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
#61
Item #61 - Temporary Staffing Services - The City of Findlay is accepting proposals for temporary staffing services to fill various seasonal employee positions for the period of January 1, 2020 to December 31, 2020.
10/31/2019 06:00 PM UTC
#63
Item #63 - C909 Plastic Pipe - The City of Findlay is accepting proposals for furnishing and delivery of C909 plastic pipe for the period January 1, 2020 to December 31, 2020.
10/31/2019 06:00 PM UTC
31993700
City of Findlay- CUBE Parking Lot Resurfacing Phase One This project consists of planning and resurfacing a section of the existing parking lots at the CUBE, located at 3430 North Main Street. The 2019 Ohio Department of Transportation (ODOT) Construction and Materials Specifications shall be followed. Required modifications to the ODOT specifications are noted herein. City of Findlay Specifications and Standard Drawings shall also be adhered to where applicable and are available at the City of Findlay Engineering Department, 318 Dorney Plaza, Findlay, OH 45840. The project is funded through the City of Findlay’s Capital Improvements Fund. State prevailing wages and the City of Findlay income taxes shall apply. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any accepted Alternates as selected by the City of Findlay. Final Completion: November 15, 2019 Engineering Estimate: $ 115,000 (Base Bid)
09/17/2019 06:00 PM UTC
35691300
City of Findlay 2019 Annual Sewer and Manhole Lining Program Completion Date: April 5th, 2020 Engineering Estimate: $400,000
08/07/2019 06:00 PM UTC
35691400
City of Findlay 2019 Annual Sewer Televising Program-This program consists of performing closed circuit television inspection on various storm and sanitary sewers located within the City of Findlay. This program will assess the condition of the selected sewer lines, and present the information to the City of Findlay so that the information can be used to make decisions regarding rehabilitation and/ or replacement. The sewers will be rated by using a standardized field investigation approach to efficiently utilize time and resources when evaluating the selected sewers. This project shall consist of, but not limited to, sewer cleaning as necessary for proper sewer evaluating, CCTV recordings, evaluating and rating of recorded sewers, and electronic format submission of recorded/ evaluated sewers. Completion Date: April 10, 2020 Engineering Estimate (Base Bid Only): $300,000
07/31/2019 06:00 PM UTC
Country Club Drive Slope Rehabilitation
The City of Findlay is requesting qualifications for a slope stabilization project located on the bank of the Blanchard River at Country Club Drive. This solicitation is for design of options, engineering plans, cost estimates and specifications.
07/10/2019 04:00 PM UTC
35293200
City of Findlay Airport Crack Seal and Re-Mark Runway 7-25. Pre-Bid Meeting will be held on Monday, June 17, 2019 at 11:00 AM at the Findlay Airport Terminal Building located at 1615 Gary Street, Findlay, OH 45840 Engineer's Estimate (Base Bid)- $176,000.00
06/27/2019 06:00 PM UTC
35681200
City of Findlay WPCC UV Replacement & Improvements This project consists of replacing the existing UV disinfection system and modification of the existing UV channel. The contract also includes, but not limited to; construction of new UV bypass pipe, replacing existing spray water pumps, replace existing process water pump and locate in a newly constructed process water pit, and replacement of effluent sampler. Substantial Completion Date: April 20, 2020 Final Completion Date: May 31, 2020 Engineer’s Estimate: $2,570,000
06/19/2019 06:00 PM UTC
35793300
City of Findlay Olive Street 8-inch Waterline Replacement. This project consists of installing a new 8-inch C909 waterline on Olive Street., running along the south side of the roadway, in the center westbound lane of Olive Street., from S. Main Street to the west side of Fairmount Drive. The new waterline will need to be directional drilled under S. Main Street to the west side of the southbound curb, to tap onto the existing 6-inch line. This project shall consist of, but not limited to, 960 LF of 8-inch C909 waterline, 100 LF of 8-inch directional drill (alternate), 100 LF of 6-inch waterline, full depth pavement repair, waterline tie-ins, waterline abandonments, fire hydrant removal, hydrant replacement, misc. fittings, seeding and mulching. Substantial Completion Date: August 30, 2019 Final Completion Date: September 13, 2019 Engineer’s Estimate: $130,000.00
06/19/2019 06:00 PM UTC
31993800
Letters of Interest for ODOT Pre-qualified Consultants for Blanchard River Greenway Extension 2 (PID 109009) LOI Package Requirements can be downloaded for free but must be mailed/delivered to the City of Findlay as outlined in the documents. The selected firm shall provide the services necessary to prepare a complete set of construction plans and specifications for construction of the project.
06/14/2019 08:00 PM UTC
251 - 260 of 307 Solicitations
1 2 22 23 24 26 28 29 30 31