General Info

Business Logo

City of Findlay

318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
13
Item #13 - Asphalt Concrete - The City of Findlay is accepting proposals for Asphalt Concrete for the period January 1, 2027, to December 31, 2027.
11/12/2026 07:00 PM UTC
35664600
This project consists of removing an existing 12” water line and a 15” sanitary line out of the existing 36” storm sewer. To remove the existing 12” water line from the storm sewer it will need to be lowered under the storm sewer. It will need to be lowered roughly 5 feet. To remove the existing 15” out of the storm sewer the manholes on both ends will need to be lowered. The existing manholes will be removed, and the new manholes will be roughly 3 feet lower than the existing ones. There will be a new 18” sanitary sewer that is ran from the two new manholes that goes under the existing storm sewer, that is 408 LF. This project will also include attaching all other existing lines to the new manholes. The south manhole will also need a 58 LF of 18” sanitary sewer to be attached to the existing pipe that is to southeast. The work also includes all labor, equipment, traffic control, pavement saw cutting, incidental excavation, disposal of removed materials, pavement restoration immediately surrounding the structures, and all other work necessary to complete the adjustments. Upon completion, all manholes shall provide a smooth riding surface, be free from movement or rocking, and meet the required line and grade tolerances established by the Engineer. Bidders are advised to pay close attention to the specific details of the Supplemental Specifications and Pay Item Descriptions. Item descriptions detail all that is included with each pay item as well as pay limits for certain items. During construction, maintenance of traffic and access to local businesses and residences will be major concerns for the City, Contractor, and adjacent property owners. This project is located within the City of Findlay corporation limits and is thereby eligible for City Income Tax collection. The project is funded by City of Findlay local funds. Bidders shall be aware of any required Equal Employment Opportunity requirements as well as the State prevailing wages that apply to this project. Domestic steel use requirements also apply to this project as specified in Section 153.011 of the Ohio Revised Code. A copy of Section 153.011 can be obtained from any office of the Ohio Department of Administrative Services. After the bid date, contracts will be awarded as soon as possible in order to expedite securing materials and beginning construction. Specific Notes: 1. Rock Elevation: 781.00’ +/- 2. Remove 12” Water line and 15” Sanitary Sewer from existing 36” Storm Sewer including existing vaults, Reestablish flow in 36” RCP. FINAL COMPLETION DATE: May 28, 2027 ENGINEER’S ESTIMATE: $ 271,380
11/12/2026 07:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
35621200
Madison & Monroe Sanitary Phase II This project consists removing approximately 480’ of existing 8-inch Vitrified Clay Pipe and replacing it with 8-inch SDR35 on Monroe Avenue from Morey Avenue to the first Manhole to the West. There are 11 existing laterals that will need to be tied into the new Sanitary Sewer. Sanitary Service must be maintained during the project. Final Completion: August 5, 2022 Engineering Estimate: $97,991.50
04/26/2022 06:00 PM UTC
Request for Qualifications Architect/Engineer Services for the City of Findlay Municipal Court CASC Facility
The City of Findlay Municipal Court (hereinafter referred to as “CITY”) is requesting Statements of Qualification (SOQs) to provide architectural/engineering services for the planning and design process needed for the construction of a Community Alternative Sentencing Center (CASC).
03/17/2022 06:00 PM UTC
32820500A
City of Findlay 2022 Annual Resurfacing Program-Contract A (Concrete) This project consists of nearly 21,930 (LF) of curb removal and replacement on various streets within the City of Findlay in Hancock County. Incidental items include necessary sidewalk or curb ramp replacement (approximately 8,436 SF), concrete drive replacement (approximately 1,024 SY), asphalt drive replacement (approximately 1,041 SY), adjustment of manholes and catch basins, grading and seeding. Other minor work is described in the details for each segment of roadway. The project will be split up into two different groups to ensure some of the larger sections of road are completed before school is in session. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any accepted Alternates as selected by the City of Findlay. Final Completion for Each Group: Group One: On or Before July 1, 2022 Group Two: On or Before August 5, 2022 Engineering Estimate: $ 775,000 (Base Bid)
03/16/2022 06:00 PM UTC
32820500B
City of Findlay 2022 Annual Resurfacing Program-Contract B (Asphalt) This contract is for asphalt work only, consisting of pavement planning (approximately 21,440 SY) and asphalt resurfacing (approximately 3,071 CY) on various streets within the City of Findlay or Hancock County. Incidental items include, but not limited to, are adjustment of manholes, and joint sealing. Other minor work is described in the details for each segment of pavement. The project will be split up into two different groups to ensure some of the larger sections of road are completed before school is in session. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any accepted Alternates as selected by the City of Findlay. Projected Start Date for Each Group: Group One: On or Before June 27, 2022 Group Two: On or Before August 8, 2022 Final Completion for Each Group: Group One: On or Before August 12, 2022 Group Two: On or Before October 14, 2022 Engineering Estimate: $ 575,000 (Base Bid)
03/16/2022 06:00 PM UTC
35210500
City of Findlay Airport North Apron Rehabilitation This project will consist of a reconstruction of the North Apron within the City of Findlay FDY property. This project shall consist of, but not limited too; full depth reconstruct of portions of the north apron, new concrete pads for airport staging, 4-inch mill and overlay of portions of the north apron, new storm system, installation of oil/water separators, and new pavement markings. Pre-Bid Meeting will be held on Wednesday, March 8, 2022 at 11:00 AM at the Findlay Airport Terminal Building located at 1615 Gary Street, Findlay, OH 45840. There is a DBE Goal of 6% for the project Engineer's Estimate (Base Bid)- $2,093,100.00 Completion Date: November 2, 2022
03/15/2022 06:00 PM UTC
Request for Qualifications Design/Build Services for City of Findlay STRICT Center
The City of Findlay (hereinafter referred to as “CITY”) is requesting statements of qualification (SOQs) to provide Design/Build services for the CITY’s Simulated Tactical Response & Incident Command Training (STRICT) Center. The intent is to engage a CONTRACTOR to complete the design, construction documents and construction for the CITY’s STRICT Center. In particular, the CITY is seeking a CONTRACTOR with demonstrated expertise and competence in multi-agency training complexes for first responders. Project is subject to Section 3 of the Housing and Urban Development Act of 1968. More information on Section 3 can be found via the above-mentioned link.
03/10/2022 07:00 PM UTC
32803300
City of Findlay, State and Markle Reconstruction, OPWC State and Markle Street will be reconstructed from Harmon Street to Parkside Place. State Street will be resurfaced and the existing curb and gutter will be removed and replaced with straight curb and Markle Street will be a newly built roadway with straight curb. New 4 ft. wide concrete sidewalk will be added to extend the existing sidewalks from Harmon Street to Parkside Place on both sides of the roadway. Along with the reconstruction of the roadway a new 6-inch waterline will be installed on the west side of State Street and the Northside in the roadway on Markle Street. A new storm sewer will also be installed on State and Markle Street in the roadway. This project shall consist of, but not limited to, 1055 LF of 6-inch C909 waterline, waterline tie-ins, waterline abandonments, fire hydrant installation, misc. fittings, seeding and mulching, 700 LF of 12-inch storm sewer, 340 LF of 15-inch storm sewer, 5 LF of 18-inch storm sewer, 22 storm structures, 2030 LF of straight curb, 2620 SF of sidewalk, drive approach replacement, roadway excavation, embankment, and 225 CY of asphalt. This project is funded by City of Findlay Water, Sewer, and Capitol Funds as well as Ohio Public Works Commission (OPWC). Bidders shall be aware of the required Equal Employment Opportunity Requirements as well as the State Prevailing Wages that apply to this project. Domestic steel use requirements also apply to this project as specified in Section 153.011 of the Ohio Revised Code. A copy of Section 153.011 can be obtained from any office of the Ohio Department of Administrative Services. Final Completion Date: June 30, 2022 Engineer’s Estimate: $582,139.25
02/24/2022 07:00 PM UTC
Design/Build Services for Preparation of LTCP Implementation Projects
The CITY is requesting SOQs from experienced design build teams in LTCP Implementation Projects. The CITY renewed its National Discharge Elimination System (NPDES) permit on June 2018 to discharge from the River Road Water Pollution Control Center (WPCC). As part of the renewed permit, the CITY submitted addendum to Ohio EPA for its Combined Sewer Overflow Long Term Control Plan (CSO LTCP) on January 2021. The submitted plan was approved on May 18, 2021 meeting the applicable state and federal requirements. The plan includes capital improvements projects (CIPs) to mitigate overflow from the combined sewer system and the sanitary sewer system. The plan includes a list of projects associated with each CSO and SSO and an implementation schedule for completion. This proposed scope of services is for the 2022 project year CSO and SSO projects identified in the CSO LTCP.
02/17/2022 07:00 PM UTC
Design/Build Services for WPC Clarifiers 3, 4 & 5 and Oxidation Ditch Rehab Project
The City of Findlay is requesting SOQs from experienced design build teams in WPC Projects. Clarifier Basins – This project consists of blast cleaning all of the steel in an existing Clarifier Basin, apply a zinc urethane system to the existing catwalk support beams, apply zinc epoxy to the prepared surfaces, and perform miscellaneous repairs to interior sidewall expansion joints and spalling floors. Oxidation Ditches – This project consists of performing miscellaneous repairs to interior sidewall joints and concrete hollow core plank catwalks as well as leveling/replacing existing concrete sidewalks.
02/17/2022 07:00 PM UTC
36
Item #36 - Fire Department Uniforms - The City of Findlay is accepting proposals for Iron Pipe for the period January 1, 2022 to December 31, 2022.
02/15/2022 07:00 PM UTC
221 - 230 of 388 Solicitations
1 2 … 19 20 21 23 25 26 27 … 38 39