City of Findlay
318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121
318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
6
Item #6 - Ferrous Chloride- The City of Findlay is accepting proposals for Fluorosilicic Acid for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 AM UTC |
68
Item #68 - Copper Sulfate Pentahydrate Liquid - The City of Findlay is accepting proposals for Copper Sulfate Pentahydrate Liquid for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 AM UTC |
33
Item #33 - Airport Fuel- The City of Findlay is accepting proposals for Airport Fuel for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 AM UTC |
17
Item #17-Crushed Stone - The City of Findlay is accepting proposals for Crushed Stone for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
1601
Item #1601-Ready Mix Concrete - The City of Findlay is accepting proposals for Ready Mix Concrete for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
64
Item #64 - Municipal Building Cleaning - The City of Findlay is accepting proposals for Municipal Building Cleaning for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
66
Item #66 -Copper Sulfate Pentahydrate Crystals - The City of Findlay is accepting proposals for Copper Sulfate Pentahydrate Crystals for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
2801
Item #2801 - Waterline Tapping Gates - The City of Findlay is accepting proposals for Waterline Tapping Gates for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
27
Item #27 - Waterline Gate Valves - The City of Findlay is accepting proposals for various sizes and quantities of waterline gate valves to be supplied and delivered for the period of January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
13
Item #13 - Asphalt Concrete - The City of Findlay is accepting proposals for Asphalt Concrete for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
7
Item #7-Liquid Carbon Dioxide (BULK) - The City of Findlay is accepting proposals for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
2802
Item #2802 - Waterline Tapping Sleeves - The City of Findlay is accepting proposals for Waterline Tapping Sleeves for the period January 1, 2026, to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
26
Item #26 -Fire Hydrants- The City of Findlay is accepting proposals for Fire Hydrants for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
1
Item #1-Pebble Lime Bulk - The City of Findlay is accepting proposals for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
2401
Item #2401-Water Meter Lids - The City of Findlay is accepting proposals for Water Meter Lids for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
1603
Item #1603-Class C Concrete - The City of Findlay is accepting proposals for Class C Concrete for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
69
Item #69 -Large Diameter and Gate Valve
The City of Findlay is accepting proposals for
Large Diameter and Gate Valves with electric actuators, for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
63
Item #63 - C909 Plastic Pipe - The City of Findlay is accepting proposals for furnishing and delivery of C909 plastic pipe for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
34
Item #34 - Jet-A Turbine Aviation Fuel - The City of Findlay is accepting proposals for supply and delivery of an estimated 200,000 gallons of Jet-A Turbine Aviation Fuel, meeting latest ASTM D-1655 specifications, to the Findlay Airport at 1615 Gray Street, during the period of January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
32
Item #32 - Vehicle & Equipment Fuel (Gasoline & Diesel)- The City of Findlay is accepting proposals for Vehicle & Equipment Fuel (Gasoline & Diesel) for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
1602
Item #1602-CDF - The City of Findlay is accepting proposals for CDF for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
14
Item #14- Liquid Asphalt- The City of Findlay is accepting proposals Liquid Asphalt for the period of January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
402
Item #402 - Sodium Hypochlorite (WTP) - The City of Findlay is accepting proposals for Sodium Hypochlorite (WTP) for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
Number | Deadline |
---|---|
26
Item #26 -Fire Hydrants- The City of Findlay is accepting proposals for Fire Hydrants for the period January 1, 2021 to December 31, 2021.
| 11/05/2020 07:00 PM UTC |
40)
Item #40 - Elevator Maintenance - The City of Findlay is accepting proposals for Elevator Maintenance for the period January 1, 2021 to December 31, 2021.
| 11/05/2020 07:00 PM UTC |
40
Item #40 - Elevator Maintenance - The City of Findlay is accepting proposals for Elevator Maintenance for the period January 1, 2021 to December 31, 2021.
| 11/05/2020 07:00 AM UTC |
26
Item #26 -Fire Hydrants- The City of Findlay is accepting proposals for Fire Hydrants for the period January 1, 2021 to December 31, 2021.
| 11/05/2020 07:00 AM UTC |
1
Item #1 - Pebble Lime (BULK) - The City of Findlay is accepting proposals for Pebble Lime (BULK) for the period January 1, 2021 to December 31, 2021.
| 11/05/2020 07:00 AM UTC |
35600600
City of Findlay 2020 Annual Sewer and Manhole Lining Program
The project consists of no-dig rehabilitation of several deteriorating sanitary sewer lines in the City of Findlay (hereinafter referred to as “City”). Incidental to the lining shall be the reinstatement of sewer service laterals without excavation.
The Base Bid includes several sewer locations in different areas of the City. Some sewer lines to be lined are in close proximity of each other while others are somewhat isolated. The sizes to be lined include 8-inch, 10-inch, 12-inch, 18-inch, 20-inch and 24-inch sewers. Bidders are requested to provide a unit price per foot based on the size of host pipe. If sizes, lengths, or any other changes significantly differ from the provided information, the City will work with the Contractor to make accurate price adjustments.
Potential Additive Alternates:
Potential additive alternates to the Contract are included and shall be used at the City’s discretion. If project funds are available, the City may designate any of these sewers for lining, manholes to be lined, or additional camera services. Only entire sections (from manhole to manhole) will be considered for lining.
Completion Date: April 9, 2021
Engineering Estimate (Base Bid Only): $382,616
| 08/06/2020 06:00 PM UTC |
35702700
City of Findlay Penrose Public Infrastructure Project
This public infrastructure project will include the new construction of 415 LF of 8-inch waterline, and 464 LF of sidewalk located within the Birchaven Complex as a part of the Blanchard Valley Health System.
Waterline Final Completion Date: August 31, 2020
Sidewalk Final Completion Date: December 31, 2021
Engineer’s Estimate: $86,295.00
| 07/16/2020 06:00 PM UTC |
32884500
City of Findlay HAN-CR236-0.00, PID100184
This project consist of widening out County Road 236 one lane to the east from Sandusky St. (SR568) to Tiffin Ave. (US224) as well as installing a multiuse path on the east side of the right of way. The widening of County Road 236 will reconfigure the roadway to a three lane road consisting of two drive lanes and a center turn lane. Along with the roadway widening a new 10 ft. wide multiuse path will be installed on the east side of the roadway from Sandusky St. to Tiffin Ave. New curb and gutter will be placed on this section of roadway, which will also include the relocation of existing storm structures. This project consist of, but not limited to; installing 2,450 SF of concrete sidewalk, 56,860 SF of asphalt multiuse path, 1208 CY of Asphalt Concrete Surface Course, 514 CY Asphalt Concrete Intermediate Course, aggregate base, new storm lines and structures, and grading and seeding.
The 2019 Ohio Department of Transportation (ODOT) Construction and Materials Specifications shall be followed. Required modifications to the ODOT specifications are noted herein. City of Findlay Specifications and Standard Drawings shall also be adhered to where applicable and are available at the City of Findlay Engineering Department, 318 Dorney Plaza, Findlay, OH 45840. Federal prevailing wages shall apply. The DBE goal for this project is 7%.
All Bidders shall submit a DBE Utilization Plan at the time of bid setting forth specific information demonstrating how the Bidder will achieve the DBE goal. By submitting a DBE Utilization Plan, the Bidder is affirming that they will be using the DBE firms identified in the Utilization Plan to meet the DBE contract goal. The DBE Utilization Plan shall be submitted online at:https://odot.formstack.com/forms/dbe_copy
Final Completion: on or before October 23, 2020
Engineering Estimate: $ 2,196,661.30
| 05/14/2020 06:00 PM UTC |
35293400
City of Findlay Airport Taxiway A (A4 to A6) Rehabilitation
Mill and overlay of Taxiway A from connector A4 through A^ at the Findlay Airport. There will be no geometry changes and the pavement markings will be updated to meet FAA Advisory Circular (AC) 150/5340-1M, Standards for Airport Markings, within the project limits.
Pre-Bid Meeting will be held on Wednesday, May 6, 2020 at 11:00 AM at the Findlay Airport Terminal Building located at 1615 Gary Street, Findlay, OH 45840. The meeting will be held outside.
There is a DBE Goal of 6% for the project
Engineer's Estimate (Base Bid)- $397,937.00
Completion Date: October 23, 2020
| 05/14/2020 06:00 PM UTC |
32876000
City of Findlay HAN-Lincoln & Blanchard Paths, PID104247
This project consist of a lane configuration of Blanchard Street between Sixth Street and Center Street to add dedicated bike lanes on the east and west side, reconstructed traffic signals at five signalized intersections, ADA compliant curb ramps, and resurfacing. In addition to the Blanchard Street lane configuration, a multi-use path will be constructed on the north side of Lincoln Street from Cory Street to Blanchard Street. The Lincoln Street portion of the project will also include upgrades to signalized pedestrian controls at 2 intersections and ADA compliant curb ramps. This project consist of, but not limited to, installing 30,000 SF of concrete sidewalk, 46,381 SY of pavement planning, 1933 CY of Asphalt Concrete Surface Course, 1200 LF of curb replacement aggregate base, new signs, upgrade 5 intersections, and grading and seeding.
The 2019 Ohio Department of Transportation (ODOT) Construction and Materials Specifications shall be followed. Required modifications to the ODOT specifications are noted herein. City of Findlay Specifications and Standard Drawings shall also be adhered to where applicable and are available at the City of Findlay Engineering Department, 318 Dorney Plaza, Findlay, OH 45840. Federal prevailing wages shall apply. The DBE goal for this project is 7%.
All Bidders shall submit a DBE Utilization Plan at the time of bid setting forth specific information demonstrating how the Bidder will achieve the DBE goal. By submitting a DBE Utilization Plan, the Bidder is affirming that they will be using the DBE firms identified in the Utilization Plan to meet the DBE contract goal. The DBE Utilization Plan shall be submitted online at:https://odot.formstack.com/forms/dbe_copy
Substantial Completion: on or before October 23, 2020
Final Completion: on or before August 13, 2021
Engineering Estimate: $ 2,170,854.00
| 05/13/2020 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.