General Info

Business Logo

City of Findlay

318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
6
Item #6 - Ferrous Chloride- The City of Findlay is accepting proposals for Fluorosilicic Acid for the period January 1, 2026 to December 31, 2026.
10/16/2025 06:00 AM UTC
68
Item #68 - Copper Sulfate Pentahydrate Liquid - The City of Findlay is accepting proposals for Copper Sulfate Pentahydrate Liquid for the period January 1, 2026 to December 31, 2026.
10/16/2025 06:00 AM UTC
33
Item #33 - Airport Fuel- The City of Findlay is accepting proposals for Airport Fuel for the period January 1, 2026 to December 31, 2026.
10/16/2025 06:00 AM UTC
17
Item #17-Crushed Stone - The City of Findlay is accepting proposals for Crushed Stone for the period January 1, 2026 to December 31, 2026.
10/16/2025 06:00 PM UTC
1601
Item #1601-Ready Mix Concrete - The City of Findlay is accepting proposals for Ready Mix Concrete for the period January 1, 2026 to December 31, 2026.
10/16/2025 06:00 PM UTC
64
Item #64 - Municipal Building Cleaning - The City of Findlay is accepting proposals for Municipal Building Cleaning for the period January 1, 2026 to December 31, 2026.
10/16/2025 06:00 PM UTC
66
Item #66 -Copper Sulfate Pentahydrate Crystals - The City of Findlay is accepting proposals for Copper Sulfate Pentahydrate Crystals for the period January 1, 2026 to December 31, 2026.
10/16/2025 06:00 PM UTC
2801
Item #2801 - Waterline Tapping Gates - The City of Findlay is accepting proposals for Waterline Tapping Gates for the period January 1, 2026 to December 31, 2026.
10/16/2025 06:00 PM UTC
27
Item #27 - Waterline Gate Valves - The City of Findlay is accepting proposals for various sizes and quantities of waterline gate valves to be supplied and delivered for the period of January 1, 2026 to December 31, 2026.
10/16/2025 06:00 PM UTC
13
Item #13 - Asphalt Concrete - The City of Findlay is accepting proposals for Asphalt Concrete for the period January 1, 2026 to December 31, 2026.
10/16/2025 06:00 PM UTC
7
Item #7-Liquid Carbon Dioxide (BULK) - The City of Findlay is accepting proposals for the period January 1, 2026 to December 31, 2026.
10/16/2025 06:00 PM UTC
2802
Item #2802 - Waterline Tapping Sleeves - The City of Findlay is accepting proposals for Waterline Tapping Sleeves for the period January 1, 2026, to December 31, 2026.
10/16/2025 06:00 PM UTC
26
Item #26 -Fire Hydrants- The City of Findlay is accepting proposals for Fire Hydrants for the period January 1, 2026 to December 31, 2026.
10/16/2025 06:00 PM UTC
1
Item #1-Pebble Lime Bulk - The City of Findlay is accepting proposals for the period January 1, 2026 to December 31, 2026.
10/16/2025 06:00 PM UTC
2401
Item #2401-Water Meter Lids - The City of Findlay is accepting proposals for Water Meter Lids for the period January 1, 2026 to December 31, 2026.
10/16/2025 06:00 PM UTC
1603
Item #1603-Class C Concrete - The City of Findlay is accepting proposals for Class C Concrete for the period January 1, 2026 to December 31, 2026.
10/16/2025 06:00 PM UTC
69
Item #69 -Large Diameter and Gate Valve The City of Findlay is accepting proposals for Large Diameter and Gate Valves with electric actuators, for the period January 1, 2026 to December 31, 2026.
10/16/2025 06:00 PM UTC
63
Item #63 - C909 Plastic Pipe - The City of Findlay is accepting proposals for furnishing and delivery of C909 plastic pipe for the period January 1, 2026 to December 31, 2026.
10/16/2025 06:00 PM UTC
34
Item #34 - Jet-A Turbine Aviation Fuel - The City of Findlay is accepting proposals for supply and delivery of an estimated 200,000 gallons of Jet-A Turbine Aviation Fuel, meeting latest ASTM D-1655 specifications, to the Findlay Airport at 1615 Gray Street, during the period of January 1, 2026 to December 31, 2026.
10/16/2025 06:00 PM UTC
32
Item #32 - Vehicle & Equipment Fuel (Gasoline & Diesel)- The City of Findlay is accepting proposals for Vehicle & Equipment Fuel (Gasoline & Diesel) for the period January 1, 2026 to December 31, 2026.
10/16/2025 06:00 PM UTC
1602
Item #1602-CDF - The City of Findlay is accepting proposals for CDF for the period January 1, 2026 to December 31, 2026.
10/16/2025 06:00 PM UTC
14
Item #14- Liquid Asphalt- The City of Findlay is accepting proposals Liquid Asphalt for the period of January 1, 2026 to December 31, 2026.
10/16/2025 06:00 PM UTC
402
Item #402 - Sodium Hypochlorite (WTP) - The City of Findlay is accepting proposals for Sodium Hypochlorite (WTP) for the period January 1, 2026 to December 31, 2026.
10/16/2025 06:00 PM UTC
23 Solicitations

Closed Solicitations

Number Deadline
35600100 - 2020 Annual Sewer Televising Program
City of Findlay 2020 Annual Sewer Televising Program-This program consists of performing closed circuit television inspection on various storm and sanitary sewers located within the City of Findlay. This program will assess the condition of the selected sewer lines, and present the information to the City of Findlay so that the information can be used to make decisions regarding rehabilitation and/ or replacement. The sewers will be rated by using a standardized field investigation approach to efficiently utilize time and resources when evaluating the selected sewers. This project shall consist of, but not limited to, sewer cleaning as necessary for proper sewer evaluating, CCTV recordings, evaluating and rating of recorded sewers, and electronic format submission of recorded/ evaluated sewers. Completion Date: April 10, 2021 Engineering Estimate (Base Bid Only): $730,000
05/12/2020 06:00 PM UTC
35691700
Madison Street and Monroe Avenue Sanitary Sewer Replacement This project consists of replacing an existing 8-inch Vitrified Clay Pipe with new 8-inch SDR35 pipe on the South side of both Madison Street and Monroe Avenue between North Main Street and Morey Avenue. There are 89 existing laterals that will need to be tied into the new Sanitary Sewer. The existing 8-inch sewer will need to remain operational until all the existing lateral are tied into the new sewer. Upon completion, the existing 8” sanitary sewer will be abandoned by grouting. Final Completion Date: August 14, 2020 Engineer’s Estimate: $426,500
04/14/2020 06:00 PM UTC
35795300
City of Findlay Sixth Street Waterline Replacement. This project consists of replacing a 10-inch waterline on Sixth Street from Main Street to Eagle Creek. The project consist of two sections of 10-inch waterline and one section of 16-inch waterline. The 10-inch sections will run from Main Street to Park Street (waterline will be ran on the north side in the grass) and from Blanchard Street to Eagle Creek (waterline will be ran in the westbound lane). The section from Park Street to Blanchard Street will consist of a 16-inch waterline install that will be ran in the westbound lane of Sixth Street. The 16-inch waterline will be tied onto an existing 16-inch stub at Blanchard Street and will be jack and bored under the CSX railroad tracks to Park Street. This project shall consist of, but not limited to, 695 LF of 16-inch C900 waterline, 60 LF of 22-inch casing jack and bore, 1680 LF of 10-inch Type B C909 waterline, 1350 LF of 10-inch Type C C909 waterline, 200 LF of 6-inch C909 waterline, full depth pavement repair, waterline tie-ins, waterline abandonments, fire hydrant removal, hydrant replacement, misc. fittings, seeding and mulching. Substantial Completion Date: August 7, 2020 Final Completion Date: August 21, 2020 Engineer’s Estimate: $550,000.00
03/11/2020 06:00 PM UTC
35793300
City of Findlay Olive Street 16-inch Waterline Extension. This project consists of installing a new 16-inch C905 waterline on Olive Street, running in the eastbound lane of Olive Street. The waterline will start from a 16-inch stub on Park Street and will extend to an existing 16-inch stub at Brookside Drive. The new waterline will need to be jack and bored under the CSX Railroad and Horizontal Directional Drill under Eagle Creek. This project shall consist of, but not limited to, 1760 LF of 16-inch C905 waterline, jack and bore 60 LF of 22-inch casing pipe, 225 LF of 16-inch directional drill, 60 LF of 8-inch waterline, full depth pavement repair, waterline tie-ins, waterline abandonments, fire hydrant removal, hydrant replacement, misc. fittings, seeding and mulching. Final Completion Date: August 21, 2020 Engineer’s Estimate: $525,000.00
03/04/2020 07:00 PM UTC
32593900
City of Findlay Country Club Drive Landslide Repair This project will consist of repairing the existing landslide along Country Club Drive and adjacent to the Blanchard River. This project will also consist of modifications to the existing storm sewer that outlets to the Blanchard River. Within the project area there are overhead power lines, which will effect some of the work. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any accepted Alternates as selected by the City of Findlay. Substantial Completion: March 30, 2020 Final Completion: August 18, 2020 Engineering Estimate: $ 230,000 (Base Bid)
02/26/2020 07:00 PM UTC
35795200
City of Findlay Rutherford Avenue 6-inch Waterline Replacement. This project consists of installing a new 6-inch C909 waterline on Rutherford Avenue, running along the north side of the roadway, from Main Street to Terrace Lane. From the existing 6-inch waterline located on Main Street the proposed waterline will extend east toward Terrace Lane. This project shall consist of, but not limited to, 1200 LF of 6-inch C909 waterline, full depth pavement repair, waterline tie-ins, waterline abandonments, fire hydrant removal, hydrant replacement, misc. fittings, seeding and mulching. Substantial Completion Date: May 22, 2020 Final Completion Date: May 29, 2020 Engineer’s Estimate: $132,000.00
02/19/2020 07:00 PM UTC
31900300
City of Findlay- CUBE Parking Lot Resurfacing Phase Two This project consists of planning and resurfacing a section of the existing parking lots at the CUBE, located at 3430 North Main Street. This project will consist of, but not limited to, 10,777 SY of ½-inch Asphalt Planning, 600 CY of 2-inch thick Asphalt Surface Course, and temporary sediment and erosion control. The base bid for this project will consist of milling and resurfacing a section of The Cube parking lot (north of The Cube building) and will have a final completion date of August 8, 2020. Also within the bid is an alternate for pavement markings such as parking stalls, stop bar, etc. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any accepted Alternates as selected by the City of Findlay. Final Completion: August 8, 2020 Engineering Estimate: $ 115,000 (Base Bid)
02/19/2020 07:00 PM UTC
35595100
City of Findlay Blanchard Street Catch Basin Replacement This project consists of removing and replacing damaged catch basins on Blanchard Street from the blocks of Tiffin Ave. to Sixth St. There are a total of 37 block catch basins, which will need to be removed and replaced, with all existing pipes tied into the new structure. This project shall consist of, but not limited to, 37 block catch basin removal, installation of 37 precast catch basins, various size storm pipe and fittings, full depth pavement repair, sidewalk replacement, curb replacement, and seeding and mulching. Final Completion Date: May 29, 2020 Engineer's Estimate- $150,000.00
02/12/2020 07:00 PM UTC
32894500-A
City of Findlay 2020 Annual Resurfacing Program-Contract A (Concrete) This project consists of nearly 21,810 (LF) of curb removal and replacement on various streets within the City of Findlay in Hancock County. Incidental items include necessary sidewalk or curb ramp replacement (approximately 15,100 SF), concrete drive replacement (approximately 2510 SY), asphalt drive replacement (approximately 400 SY), adjustment of manholes and catch basins, grading and seeding. Other minor work is described in the details for each segment of roadway. The project will be split up into two different groups to ensure some of the larger sections of road are completed before school is in session. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any accepted Alternates as selected by the City of Findlay. Final Completion for Each Group: Group One: On or Before July 3, 2020 Group Two: On or Before August 1, 2020 Engineering Estimate: $ 757,000 (Base Bid)
02/05/2020 07:00 PM UTC
32894500-B
City of Findlay 2020 Annual Resurfacing Program-Contract B (Asphalt) This contract is for asphalt work only, consisting of pavement planning (approximately 43,510 SY) and asphalt resurfacing (approximately 2,490 CY) on various streets within the City of Findlay or Hancock County. Incidental items include, but not limited to, are adjustment of manholes, and joint sealing. Other minor work is described in the details for each segment of pavement. The project will be split up into two different groups to ensure some of the larger sections of road are completed before school is in session. The project will be awarded to the lowest and most responsive bidder based on the Grand Total Price of the Base Bid and any accepted Alternates as selected by the City of Findlay. Projected Start Date for Each Group: Group One: On or Before June 22, 2020 Group Two: On or Before August 21, 2020 Final Completion for Each Group: Group One: On or Before August 3, 2020 Group Two: On or Before October 9, 2020 Engineering Estimate: $ 491,000 (Base Bid)
02/05/2020 07:00 PM UTC
231 - 240 of 312 Solicitations
1 2 20 21 22 24 26 27 28 31 32