City of Findlay
318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121
318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
6
Item #6 - Ferrous Chloride- The City of Findlay is accepting proposals for Fluorosilicic Acid for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 AM UTC |
68
Item #68 - Copper Sulfate Pentahydrate Liquid - The City of Findlay is accepting proposals for Copper Sulfate Pentahydrate Liquid for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 AM UTC |
33
Item #33 - Airport Fuel- The City of Findlay is accepting proposals for Airport Fuel for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 AM UTC |
17
Item #17-Crushed Stone - The City of Findlay is accepting proposals for Crushed Stone for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
1601
Item #1601-Ready Mix Concrete - The City of Findlay is accepting proposals for Ready Mix Concrete for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
64
Item #64 - Municipal Building Cleaning - The City of Findlay is accepting proposals for Municipal Building Cleaning for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
66
Item #66 -Copper Sulfate Pentahydrate Crystals - The City of Findlay is accepting proposals for Copper Sulfate Pentahydrate Crystals for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
2801
Item #2801 - Waterline Tapping Gates - The City of Findlay is accepting proposals for Waterline Tapping Gates for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
27
Item #27 - Waterline Gate Valves - The City of Findlay is accepting proposals for various sizes and quantities of waterline gate valves to be supplied and delivered for the period of January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
13
Item #13 - Asphalt Concrete - The City of Findlay is accepting proposals for Asphalt Concrete for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
7
Item #7-Liquid Carbon Dioxide (BULK) - The City of Findlay is accepting proposals for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
2802
Item #2802 - Waterline Tapping Sleeves - The City of Findlay is accepting proposals for Waterline Tapping Sleeves for the period January 1, 2026, to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
26
Item #26 -Fire Hydrants- The City of Findlay is accepting proposals for Fire Hydrants for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
1
Item #1-Pebble Lime Bulk - The City of Findlay is accepting proposals for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
2401
Item #2401-Water Meter Lids - The City of Findlay is accepting proposals for Water Meter Lids for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
1603
Item #1603-Class C Concrete - The City of Findlay is accepting proposals for Class C Concrete for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
69
Item #69 -Large Diameter and Gate Valve
The City of Findlay is accepting proposals for
Large Diameter and Gate Valves with electric actuators, for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
63
Item #63 - C909 Plastic Pipe - The City of Findlay is accepting proposals for furnishing and delivery of C909 plastic pipe for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
34
Item #34 - Jet-A Turbine Aviation Fuel - The City of Findlay is accepting proposals for supply and delivery of an estimated 200,000 gallons of Jet-A Turbine Aviation Fuel, meeting latest ASTM D-1655 specifications, to the Findlay Airport at 1615 Gray Street, during the period of January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
32
Item #32 - Vehicle & Equipment Fuel (Gasoline & Diesel)- The City of Findlay is accepting proposals for Vehicle & Equipment Fuel (Gasoline & Diesel) for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
1602
Item #1602-CDF - The City of Findlay is accepting proposals for CDF for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
14
Item #14- Liquid Asphalt- The City of Findlay is accepting proposals Liquid Asphalt for the period of January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
402
Item #402 - Sodium Hypochlorite (WTP) - The City of Findlay is accepting proposals for Sodium Hypochlorite (WTP) for the period January 1, 2026 to December 31, 2026.
| 10/16/2025 06:00 PM UTC |
Number | Deadline |
---|---|
Country Club Drive Slope Rehabilitation
The City of Findlay is requesting qualifications for a slope stabilization project located on the bank of the Blanchard River at Country Club Drive. This solicitation is for design of options, engineering plans, cost estimates and specifications.
| 07/10/2019 04:00 PM UTC |
35293200
City of Findlay Airport Crack Seal and Re-Mark Runway 7-25.
Pre-Bid Meeting will be held on Monday, June 17, 2019 at 11:00 AM at the Findlay Airport Terminal Building located at 1615 Gary Street, Findlay, OH 45840
Engineer's Estimate (Base Bid)- $176,000.00
| 06/27/2019 06:00 PM UTC |
35681200
City of Findlay WPCC UV Replacement & Improvements
This project consists of replacing the existing UV disinfection system and modification of the existing UV channel. The contract also includes, but not limited to; construction of new UV bypass pipe, replacing existing spray water pumps, replace existing process water pump and locate in a newly constructed process water pit, and replacement of effluent sampler.
Substantial Completion Date: April 20, 2020
Final Completion Date: May 31, 2020
Engineer’s Estimate: $2,570,000
| 06/19/2019 06:00 PM UTC |
35793300
City of Findlay Olive Street 8-inch Waterline Replacement.
This project consists of installing a new 8-inch C909 waterline on Olive Street., running along the south side of the roadway, in the center westbound lane of Olive Street., from S. Main Street to the west side of Fairmount Drive. The new waterline will need to be directional drilled under S. Main Street to the west side of the southbound curb, to tap onto the existing 6-inch line.
This project shall consist of, but not limited to, 960 LF of 8-inch C909 waterline, 100 LF of 8-inch directional drill (alternate), 100 LF of 6-inch waterline, full depth pavement repair, waterline tie-ins, waterline abandonments, fire hydrant removal, hydrant replacement, misc. fittings, seeding and mulching.
Substantial Completion Date: August 30, 2019
Final Completion Date: September 13, 2019
Engineer’s Estimate: $130,000.00
| 06/19/2019 06:00 PM UTC |
31993800
Letters of Interest for ODOT Pre-qualified Consultants for Blanchard River Greenway Extension 2 (PID 109009)
LOI Package Requirements can be downloaded for free but must be mailed/delivered to the City of Findlay as outlined in the documents.
The selected firm shall provide the services necessary to prepare a complete set of construction plans and specifications for construction of the project.
| 06/14/2019 08:00 PM UTC |
35782800
City of Findlay Reservoir Infrastructure Improvements.
Work under Contract includes, but is not limited to, replacing existing valve vault valves and piping, rehabilitating the (2) concrete reservoir transfer pipes, and automating the valves at pump station #1 to open for emergency draining of the reservoirs. The work also includes adding actuators to two existing effluent valves at Reservoirs #1 and #2. Included, but not limited to, are electrical pullboxes, metering chambers, piping installed by open-cut and trenchless methods, and all other work required in accordance with the contract documents.
Final Completion: June 5, 2020
Engineer's Estimate: $625,000.00
| 06/11/2019 06:00 PM UTC |
35790200
City of Findlay E. Bigelow Avenue 12-inch Waterline Replacement
This project consists of installing a new 12-inch C909 waterline on E. Bigelow Ave., running along the north side of the roadway, in the center westbound lane of E. Bigelow Ave., from N. Main Street to the east side of the CSX Tracks. From the existing 12-inch waterline located on E. Bigelow Ave., just east of the Main Street intersection the proposed waterline will extend east toward the CSX Railroad. Once at the CSX tracks the proposed waterline will be jack and bored under the tracks with a 20-inch casing pipe. After the CSX Jack and Bore, the waterline will continue to the east roughly 100 LF and tie back into the existing 12-inch that is located on the north side of E. Bigelow.
This project shall consist of, but not limited to, 1300 LF of 12-inch C909 waterline, 60 LF of 20-inch casing pipe jack and bore, 60 LF of 12-inch Certalock waterline, , 60 LF of 6-inch waterline, full depth pavement repair, waterline tie-ins, waterline abandonments, fire hydrant removal, hydrant replacement, misc. fittings, seeding and mulching.
Substantial Completion Date: October 4, 2019
Final Completion Date: November 8, 2019
Engineer’s Estimate: $260,000.00
| 06/05/2019 06:00 PM UTC |
City of Findlay Pavement Marking
City of Findlay-2019 Annual Pavement Marking Project.
This project will consist of pavement marking in various locations across the City of Findlay. Due to fading existing pavement markings will need new paint to be applied to them. This project will consist of four different types of markings, dashed white (37.29 mile), dashed yellow (8.30 mile, double yellow (45.25 mile), and white edge line (30.37 mile). All paint must adhere to Ohio Manual of Uniform Traffic Control Devices standards.
EXPECTED START DATE: August 1, 2019
FINAL COMPLETION DATE: September 20, 2019
ENGINEER’S ESTIMATE: $ 55,000
| 04/23/2019 06:00 PM UTC |
35790100
City of Findlay Blanchard Street 16-inch Waterline Replacement.
This project consists of installing a new 16-inch C905 waterline on South Blanchard Street, running along the east side of the roadway, from E. Sandusky Street to Sixth Street. From an existing 36-inch waterline stub located on South Blanchard Street just south of the E. Sandusky Street intersection the proposed waterline will extend south toward Eagle Creek. The proposed waterline will be jack and bored under eagle creek with a 22-inch casing pipe. After the Eagle Creek bore the waterline will continue to the south side of the Sixth Street intersection and tie into the existing 10-inch waterlines in the area. This project will consist of multiple waterline abandonments and tie-ins within the project limits. Due to the depth of the existing sewers and sewer laterals, the proposed 16-inch waterline is expected to be 9 foot deep for majority of the run. As part of the proposed waterline project there will be 180 LF of the 16-inch waterline that will need to be jack and bored with a 22-inch casing pipe from north side of Eagle Creek to the south side. The 16-inch waterline pipe running through the casing pipe shall be C905 Certalock pipe, or equal.
This project shall consist of, but not limited to, 5100 LF of 16-inch C905 waterline, 180 LF of 22-inch casing pipe jack and bore 180 LF of 16-inch Certalock waterline, 110 LF of 12-inch C909 waterline, 60 LF of 10-inch C909 waterline, 100 LF of 8-inch waterline, 60 LF of 6-inch waterline, full depth pavement repair, waterline tie-ins, waterline abandonments, fire hydrant removal, hydrant replacement, misc. fittings, seeding and mulching.
Substantial Completion Date: September 27, 2019
Final Completion Date: November 1, 2019
Engineer’s Estimate: $1,375,000.00
| 03/26/2019 06:00 PM UTC |
35284600
City of Findlay Airport Wind Cone and Beacon Relocation and Replacement.
Pre-Bid Meeting will be held on Wednesday, February 13, 2019 at 11:00 AM at the Findlay Airport Terminal Building located at 1615 Gary Street, Findlay, OH 45840
Engineer's Estimate (Base Bid)- $86,000.00
Engineer's Estimate (Alt. Bid)- $15,000.00
| 02/21/2019 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.