General Info

Business Logo

City of Findlay

318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
1001
City of Findlay Fire Hydrants, Gate Valves, & Sewer Pipes RFB - The City of Findlay is accepting proposals for the period January 1, 2026 to December 31, 2026.
12/22/2025 04:30 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
35577600
City of Findlay, Howard Street Storm and Water Line Improvements. This improvement project on Howard Street consists of installing a new 12-inch waterline, performing a sewer separation on a stretch of the roadway, curb replacement and asphalt resurfacing. The existing 12-inch transite waterline will be upgraded to a new 12-inch C909 waterline line that will be ran on the south side of the roadway. The new waterline will tie into the existing 12-inch waterline at the I-75 overpass and head east to tie into the existing 12-inch on Main Street. The waterline will require, but not limited to, multiple tie-ins, fire hydrant replacement, waterline abandonments, two directional drills, and misc. fittings. With the waterline upgrade a section of storm sewer will be installed on Howard Street from the west side of Morey Ave. to Bolton St. Within this area the current sewer is combination sanitary and storm, this new storm line will separate the storm from the existing sanitary sewer. Along with this section of storm sewer a small section of storm will be installed on Barnett St. and Glenn Ave. that will outlet into the regraded swale on Bolton St. As part of the improvement project Howard Street will be resurfaced from Broad Ave. to Main Street. The resurfacing portion of the work shall consist of, but not limited to, curb ramp upgrades, curb replacement, asphalt milling, and asphalt paving. This project shall consist of, but not limited to, 5990 LF of 12-inch C909 waterline, 200 LF of 12-inch directional drilled waterline, 10-inch waterline, 8-inch waterline, 6-inch waterline, full depth trench repair, waterline tie-ins, waterline abandonments, fire hydrant installation, misc. fittings, seeding and mulching, 300 LF of 18-inch storm sewer, 290 LF of 15-inch storm sewer, 1160 LF of 12-inch storm sewer, 27 storm structures, 7860 LF of curb replacement, 1870 SF of sidewalk replacement, drive approach replacement, 12,500 SY of asphalt planning, and 725 CY of asphalt resurfacing. This project is funded by City of Findlay Water, Sewer, and Capitol Funds as well as Ohio Public Works Commission (OPWC) and Community Development Block Grant (CDBG) Grants. Bidders shall be aware of the required Equal Employment Opportunity Requirements as well as the State Prevailing Wages that apply to this project. Domestic steel use requirements also apply to this project as specified in Section 153.011 of the Ohio Revised Code. A copy of Section 153.011 can be obtained from any office of the Ohio Department of Administrative Services. Substantial Comp. Date (Storm): Aug. 7, 2020 Final Completion Date: October 23, 2020 Engineer’s Estimate: $1,614,100.00
01/28/2020 07:00 PM UTC
31980300
City of Findlay HAN-Greenway Trail Phase I, PID106715 This project consists of extending the Blanchard River Greenway Trail to E. Main Cross Street and widening E. Main Cross Street to provide bike lanes on the north and the south side of the roadway. This project consist, but not limited to installing 14,649 SF of concrete sidewalk, 223 CY of Asphalt Concrete Surface Course, 177 CY of Asphalt Concrete Intermediate Course, aggregate base, new storm lines and structures, and grading and seeding. The 2019 Ohio Department of Transportation (ODOT) Construction and Materials Specifications shall be followed. Required modifications to the ODOT specifications are noted herein. City of Findlay Specifications and Standard Drawings shall also be adhered to where applicable and are available at the City of Findlay Engineering Department, 318 Dorney Plaza, Findlay, OH 45840. Federal prevailing wages shall apply. The DBE goal for this project is 6%. All Bidders shall submit a DBE Utilization Plan at the time of bid setting forth specific information demonstrating how the Bidder will achieve the DBE goal. By submitting a DBE Utilization Plan, the Bidder is affirming that they will be using the DBE firms identified in the Utilization Plan to meet the DBE contract goal. The DBE Utilization Plan shall be submitted online at:https://odot.formstack.com/forms/dbe_copy Final Completion: on or before August 1, 2020 Engineering Estimate: $ 686,514.91
01/14/2020 07:00 PM UTC
Hancock County CR180 Drainage Improvements
This project consist of improving the drainage on County Road 180 near State Route 568 for the Hancock County Commissioners. The project will consist of, but not limited to: 385 LF of 30-inch HDPE storm sewer, 103 LF of which will be by trenchless installation, new storm structures, regrading, rock channel protection, seeding, and mulching. Completion Date: June 30, 2020 Engineer's Estimate: $115,000
11/07/2019 07:00 PM UTC
#2
Item #2 - Fluorosilicic Acid- The City of Findlay is accepting proposals for Fluorosilicic Acid for the period of January 1, 2020 to December 31, 2020.
10/31/2019 06:00 PM UTC
#3
Item #3 - Liquid Sodium Permanganate - The City of Findlay is accepting proposals for Liquid Sodium Permanganate for the period of January 1, 2020 to December 31, 2020.
10/31/2019 06:00 PM UTC
#13
Item #13 - Asphalt Concrete - The City of Findlay is accepting proposals for various quantities and types of asphalt concrete to be delivered for the period of January 1, 2019 to December 31, 2019.
10/31/2019 06:00 PM UTC
#14
Item #14- Liquid Asphalt- The City of Findlay is accepting proposals Liquid Asphalt for the period of January 1, 2020 to December 31, 2020.
10/31/2019 06:00 PM UTC
#25
Item #25 - Type K - Soft Copper Tubing - The City of Findlay is accepting proposals for supply and delivery of type K-soft copper tubing in various sizes for the period of January 1, 2020 to December 31, 2020.
10/31/2019 06:00 PM UTC
#33
Item # 33- 100 LL Aviation Gasoline - The City of Findlay is accepting proposals for supply and delivery of an estimated 25,000 gallons of 100 LL aviation gasoline, meeting the latest ASTM D-910 specifications, to the Findlay Airport at 1615 Gray Street, for the period of January 1, 2020 to December 31, 2020.
10/31/2019 06:00 PM UTC
#62
Item # 62 - Water Treatment Plant Lime Hauling Services - The City of Findlay is accepting proposals for lime hauling services for the period January 1, 2020 to December 31, 2020.
10/31/2019 06:00 PM UTC
271 - 280 of 341 Solicitations
1 2 24 25 26 28 30 31 32 33 34 35