General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Project No. 2023-734 Capital Project No. 3400
Project No. 2023-734 Capital Project No. 3400 18th Street Reconstruction (Lake St. to Creole St.) – Phase I City of Lake Charles, Louisiana The general scope of work for Phase 1 of this project is the reconstruction of 18th Street from Lake Street to the west side of the existing bridge over Small Bayou (approx. 800 feet). This includes the construction of a new 25-foot-wide reinforced concrete roadway with an integral curb and with a sidewalk on both sides. The installation of a new subsurface drainage system will also be included to drain this new roadway and better serve the impacted area. Lastly, this project will include the installation of a new, larger diameter water distribution system from Lake Street to Creole Street.
06/02/2026 07:45 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Capital Project Number CP3242
CITY OF LAKE CHARLES, LOUISIANA SOUTHERN SEWER LOOP GULF HIGHWAY LIFT STATION CAPITAL PROJECT NUMBER CP3242 I. Scope of Services: Contractor shall complete the Work as specified and indicated in the Contract Documents for Southern Sewer Loop – Gulf Highway Lift Station). This Work includes, but is not limited to, the following: • Construction of the Gulf Highway Lift Station including the associated civil/site, mechanical, structural, electrical, etc. components required to fully execute the Work. • Installation of discharge forcemain to tie-in to the stub-out from Contract ‘A’. • Install of gravity sewer and collection structure for receipt of sewerage flows to lift station.
05/19/2026 07:45 PM UTC
CP 3507
City of Lake Charles, Louisiana Lake Charles Event Center Green Rooms Capital Project Number CP 3507 Project Description: GREEN ROOM ADDITIONS AND RENOVATIONS PROJECT FOR THE LAKE CHARLES EVENT CENTER (LCEC) SPACES INCLUDES: BASE BID - MULTIPURPOSE ROOM ADDITION (GREEN ROOM), ALTERNATE No.1 - EAST AND WEST RESTROOM / SHOWER & DRESSING ROOM RENOVATION, ALTERNATE No. 2 - LOCKERS WITH CURTAIN SYSTEM ADDED TO ALTERNATE No. 1 SCOPE, AND ALTERNATE No. 3 - SOUTH RESTROOM, SHOWERS, DRESSING ROOMS, AND LOUNGES (EAST & WEST SIDES OF ARENA) (GREEN ROOMS).
05/19/2026 07:45 PM UTC
RCIP Project No. 10LDRC7711 - CP3520
Wastewater Treatment Plant A Basin A-02 Sewer Rehabilitation Funding by CDBG-DR (SAM.gov Assistance Listing 14.228) Resilient Communities Infrastructure Program (RCIP) RCIP Project No. 10LDRC7711 – CP3520 I. Scope of Services: The City of Lake Charles WWTP ‘A’ is currently under a Compliance Order (CO) with LDEQ. The approved CO schedule requires the rehabilitation of 13 sub basins in the WWTP ‘A’ Basin. The Sub Basins have been prioritized and ranked in order of severity of condition through wastewater modeling of the system. There is approximately 22,000 LF of 6-inch through 15-inch gravity sewer pipeline to be rehabilitated (Critical and Priority 1) as part of this project. Rehabilitation methods include point repairs, pipe bursting, and manhole lining.
05/05/2026 07:45 PM UTC
Capital Project No. CP3503 LEI Project No. 25-016
City of Lake Charles, Louisiana 2025 Asphalt Overlays Lake Charles, Louisiana City of Lake Charles Capital Project No. CP3503 LEI Project No. 25-016 The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract. This project consists of pavement patching, degrassing edge of road and grading shoulders, adjusting sanitary sewer manholes to grade, milling asphaltic concrete pavement, in-place cement stabilized base course, asphalt concrete wearing course, asphalt concrete ramps at paved driveways, aggregate surface course on aggregate driveways and hydro-seeding (if required) for the following streets at various locations in the City of Lake Charles: 1. North Grace Street (Opelousas Street to South to Dead End) 2. North Grace Street (Opelousas Street to North to Dead End) 3. Cessford Street (North Grace Street to East to Dead End) 4. Byrne Street (North Grace Street to East to Dead End) 5. Bayou Road (Sale Road to Orchard Street) 6. North Railroad Avenue (1st Avenue to Bilbo Street) 7. Pithon Street (Clarence Street to South to Dead End)
05/05/2026 07:45 PM UTC
2026-17
Request for Qualifications for Architectural & Engineering Design of Resilient Indoor Multi-Sports & Recreation Complex
04/14/2026 07:45 PM UTC
CP3538
City of Lake Charles, Louisiana Buddy Prejean Park Lighting CP3538 The overall project will include new field to the existing softball field. The field will be designed for NHSA regulation foot candles. Other miscellaneous components to be provided as per the bid drawings and manual.
04/14/2026 07:45 PM UTC
Capital Project Number CP3242
CITY OF LAKE CHARLES, LOUISIANA SOUTHERN SEWER LOOP GULF HIGHWAY LIFT STATION FORCEMAIN & GRAVITY EXTENSION CITY OF LAKE CHARLES CAPITAL PROJECT NUMBER CP3242 I. Background: Waggoner Engineering, Inc. (Engineer) was retained by the City of Lake Charles to evaluate a solution to a significant bottleneck occurring at the Sarver Lift Station, which serves as the main anchor station to WWTP ‘D’. Through the evaluation, the station was found to be grossly undersized to accommodate peak weather conditions, much less, expansive growth in its collection area. Due to significant costs and physical constraints associated with expanding the Sarver Lift Station and its collection system, an alternate solution was proposed to redirect flows from the Sarver Lift Station’s service area into an independent transmission system, that would deposit flow downstream of the Sarver Lift Station. The system would serve not only to divert flow from the service area of the Sarver Lift Station, but also, provide adequate capacity to collect flows from presently unserved areas. The full extent of the transmission system will be constructed in phases to expedite completion and reduce capital expenditures of initial construction. Incoming flow will trigger progression into the successive phases of the proposed improvements. Therefore, completion of the transmission system will be controlled by its necessity (i.e. increase in flow either through growth or extension of collection infrastructure). II. Project Scope of Work: Design of approximately 13,500 linear feet of 30/36-inch sewer forcemain from the Gulf Highway Lift Station (Contract ‘B’) to Nelson Road. Project shall conclude at the junction point with Segment 1 and Segment 2 (both by Others) of Phase I of this Project. Design services shall be as per the City of Lake Charles A&E Manual.
03/31/2026 07:45 PM UTC
Project No. 2025-749 Capital Project No. 3309
PROJECT NO. 2025-749 CAPITAL PROJECT NO. 3309 HAM REID ROAD WATERLINE EXTENSION- ELLIOTT RD. TO BIG LAKE RD. CITY OF LAKE CHARLES, LA SCOPE OF WORK: The scope of work includes the installation of new 12” diameter waterline along the north side of Ham Reid Road between Elliot Road and Big Lake Highway (LA 384). The scope also includes the relocation of the existing 12” diameter water line at the intersection of La 384 and Graywood Parkway in anticipation of a new round-a-bout at this location.
03/17/2026 07:45 PM UTC
DR002
City of Lake Charles, Louisiana Lake Charles Public Works New Facility Phase 2 DR002 Scope of Project Build a variety of new buildings on an existing partially developed site. Project to include parking, generators, underground drainage, drainage swales and detention areas, enclosed conditioned buildings, open air pavilions, vehicle canopies, a new fuel station, and other work as noted in plans and specifications.
03/03/2026 08:45 PM UTC
LCR 401
City of Lake Charles, Louisiana Lock Park Inclusive Playground LCR 401 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents for the LCR 401 Lock Park Inclusive Playground. The Work includes, but is not limited to: PROJECT SUMMARY: • The scope of work that is considered base bid includes: o Necessary earthwork, grading, tree protection, and utility adjustments to accommodate the proposed playground and parking; o Demolition of the two (2) stall concrete parking lot off 6th Street, the central pedestrian promenade connecting 6th Street to 7th Street, select removal of concrete paths to accommodate drainage and curb ramps, and the removal of select trees; o Installation of vehicular rated concrete paving for a parking lot and entry drive, custom playground components, poured-in-place safety surfacing on a gravel and concrete base, engineered wood fiber safety surfacing, two (2) pre-engineered shade structures, concrete curbs and pedestrian paths, subsurface drainage, site lighting, playground fencing, planting, and an irrigation system. • The scope of work that is considered alternates includes: o Alternate No. 1: Add vehicular rated paving and curbs east of proposed drive aisle. o Alternate No. 2: Add planting and irrigation in parking islands and in front of pavilion.
03/03/2026 08:45 PM UTC
1 - 10 of 400 Solicitations