General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
DR002
City of Lake Charles, Louisiana Lake Charles Public Works New Facility Phase 2 DR002 Scope of Project Build a variety of new buildings on an existing partially developed site. Project to include parking, generators, underground drainage, drainage swales and detention areas, enclosed conditioned buildings, open air pavilions, vehicle canopies, a new fuel station, and other work as noted in plans and specifications.
02/16/2026 08:45 PM UTC
LCR 401
City of Lake Charles, Louisiana Lock Park Inclusive Playground LCR 401 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents for the LCR 401 Lock Park Inclusive Playground. The Work includes, but is not limited to: PROJECT SUMMARY: • The scope of work that is considered base bid includes: o Necessary earthwork, grading, tree protection, and utility adjustments to accommodate the proposed playground and parking; o Demolition of the two (2) stall concrete parking lot off 6th Street, the central pedestrian promenade connecting 6th Street to 7th Street, select removal of concrete paths to accommodate drainage and curb ramps, and the removal of select trees; o Installation of vehicular rated concrete paving for a parking lot and entry drive, custom playground components, poured-in-place safety surfacing on a gravel and concrete base, engineered wood fiber safety surfacing, two (2) pre-engineered shade structures, concrete curbs and pedestrian paths, subsurface drainage, site lighting, playground fencing, planting, and an irrigation system. • The scope of work that is considered alternates includes: o Alternate No. 1: Add vehicular rated paving and curbs east of proposed drive aisle. o Alternate No. 2: Add planting and irrigation in parking islands and in front of pavilion.
02/16/2026 08:45 PM UTC
2026-12
Millennium Park Fall Surface Replacement In accordance with the specifications, it is the intent of this formal invitation to receive bids from qualified bidders for Materials, Supplies and Labor for the removal of existing poured-in-place rubber surfacing, preparation of the underlying concrete slab, and installation of a synthetic turf playground surfacing system with an impact attenuation pad and silica sand infill for Millennium Park, located on the grounds of the Bord du Lac Park, adjacent to the Lake Charles Event Center. All work shall be performed in a clean, safe, and workmanlike manner in accordance with manufacturer specifications and ASTM standards for playground surfacing safety and accessibility.
03/03/2026 08:45 PM UTC
Project No. 2025-749 Capital Project No. 3309
PROJECT NO. 2025-749 CAPITAL PROJECT NO. 3309 HAM REID ROAD WATERLINE EXTENSION- ELLIOTT RD. TO BIG LAKE RD. CITY OF LAKE CHARLES, LA SCOPE OF WORK: The scope of work includes the installation of new 12” diameter waterline along the north side of Ham Reid Road between Elliot Road and Big Lake Highway (LA 384). The scope also includes the relocation of the existing 12” diameter water line at the intersection of La 384 and Graywood Parkway in anticipation of a new round-a-bout at this location.
03/03/2026 08:45 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
Capital Project No. CP3386
City of Lake Charles, Louisiana 2020 Asphalt Overlay Package Lake Charles, Louisiana City of Lake Charles Capital Project No. CP3386 LEI Project No. 21-002 The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract. The project consists of pavement patching, degrassing edge of road and grading shoulders, adjusting sanitary sewer manholes to grade, milling asphalt concrete pavement, in-place cement stabilized base course, sanitary sewer collection system reconstruction, water distribution system construction, asphalt concrete surface course, asphalt concrete ramps at paved driveways, aggregate surface course on aggregate driveways, hot rap and topsoil shoulder material, and hydro-seeding for the following streets at various locations in the City of Lake Charles: 1. Conoco Street (Ory Street to Highway 171) 2. North Malcolm Street (Conoco Street to Crockett Street) 3. Crockett Street (Ory Street to Highway 171) 4. Pack Road (Old Highway 171 to South Pack Road) 5. Kinder Street (Highway 171 to East to Dead End) 6. North Grace Street (Kinder Street to Medora Street) 7. Colfax Street (Highway 171 to East to Dead End) 8. Lynn Street (Highway 171 to East to Dead End) 9. Mary Street (Highway 171 to East to Dead End) 10. Mary Belle Williams Parking Lot
12/19/2023 08:45 PM UTC
Capital Project No. CP3440
City of Lake Charles, Louisiana 2023 Asphalt Overlays Lake Charles, Louisiana City of Lake Charles Capital Project No. CP3440 LEI Project No. 23-003 The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract. The project consists of pavement patching, degrassing edge of road and grading shoulders, adjusting sanitary sewer manholes to grade, milling asphaltic concrete pavement, asphaltic concrete surface course, asphaltic concrete ramps at paved driveways, aggregate surface course on aggregate driveways, topsoil shoulder material, hydro-seeding, and slab sodding for the following streets at various locations in the City of Lake Charles: 1. Belle Alee Lane (Holly Hill Road to Dead End) 2. Brammer Lane (Opelousas Street to Dead End) 3. Central Parkway - East (University Drive to Archwood Street) 4. Central Parkway - West (University Drive to Heather Street) 5. Fernwood Drive (Lisle Peters Road to Dead End) 6. Lucas Lane (Fernwood Drive to Dead End)
12/19/2023 08:45 PM UTC
Capital Project No. CP3051
City of Lake Charles, Louisiana 2023 Citywide Striping Lake Charles, Louisiana City of Lake Charles Capital Project No. CP3051 LEI Project No. 23-002 This intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract. The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles: 1. Derek Drive (Highway 14 to E. Prien Lake Road) 2. Dillard Loop (Highway 14 to Amoco Drive) 3. 5th Avenue (McNeese Street to 12th Street) 4. Benoit Lane (Sale Road to Jennifer Street) 5. Jennifer Street (Benoit Lane to Eileen Street) 6. LaGrange Street (Lake Street to Common Street) 7. McNeese Street (Nelson Road to Ryan Street) 8. Sale Road (Weaver Road to Common Street) 9. Lake Street (Country Club Road to McNeese Street) 10. Eileen Street (McNeese Street to Jennifer Street) 11. E. McNeese Street (Roundabout to All Approaches to Concrete Limits) 12. Golden Nugget Boulevard (State ROW Cove Lane to Ave L’Auberge) 13. Graywood Parkway (Big Lake Road to Roundabout) 14. Kingsley Street (Fruge Street to Mill Street) 15. Park Avenue (Shell Beach Drive to Ryan Street) 16. Wilson Avenue (Shell Beach Drive to Dr. Michael Debakey Drive) 17. Shell Beach Drive (From Asphalt/Concrete Transition to Clarence Street) 18. Pujo Street (Ryan Street to Kirkman Street) 19. Moss Street (Kirby Street to Broad Street) 20. Holly Hill Road (Chrysler Street to Sale Road) 21. Amoco Drive (Power Center Parkway to Derek Drive) 22. Dr. Michael Debakey Drive (Ryan Street to Lake Street) 23. Medora Street (Cathy Street to Highway 171) 24. Pineview Street (Highway 171 to Cathy Street) 25. Cathy Street (Medora Street to W. JB Carter Lane) 26. 7th Street (Ryan Street to 1st Avenue) 27. Street Removed from Project 28. Lakeshore Drive (Clarence Street to Mill Street) 29. Power Center Parkway (Highway 14 to East 3100 Ft. to Asphalt) 30. Simmons Street (Opelousas Street to Fitzenreiter Road) 31. Walters Street (Kirkman Street to Louisiana Avenue) 32. Weaver Road (Sale Road to South 300 Ft. – End of Concrete) 33. 14th Street (Highway 14 to 4th Avenue) 34. 1st Avenue (Prien Lake Road to Broad Street) 35. 2nd Avenue (Prien Lake Road to Broad Street) 36. 3rd Avenue (Prien Lake Road to Broad Street) 37. 4th Avenue (Prien Lake Road to Broad Street) 38. Nelson Road Roundabout (at Ham Reid Road) The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
12/19/2023 08:45 PM UTC
DR009
City of Lake Charles, Louisiana LCPD Annex DR009 Renovate an existing 2-story building on an existing developed site. The newly renovated space will be 2-storeis and approximately 9,190 sf. The project will include all new mechanical, electrical for the building, some paving repair, landscaping, fencing and other amenities. The project will include a new generator. The project will include two alternates. Alternate one will be for landscaping and alternate two will be for perimeter fencing as shown and indicated on the drawings.
12/05/2023 08:45 PM UTC
CP3382
City of Lake Charles, Louisiana Anita Drive Park Development CP3382 The Anita Drive Park is a city owned, vacant 1.56-acre tract located at the intersection for Ryder Avenue and Anita Drive within the City of Lake Charles. The proposed improvements include site construction associated with a concrete parking lot, a children’s splash pad, a picnic pavilion /shade structure, a lighted walking path, restroom facilities, open play lawn, site furnishings, site landscape, and required utility connections.
12/05/2023 08:45 PM UTC
DR001
City of Lake Charles, Louisiana LCPD Investigations DR001 Construct a new approximately 11,000 sq ft building on a partially developed site. Project will include new paving, landscaping, fencing, and other site amenities. Project will include a new generator for the building. The project will include two alternates. Alternate one will be for landscaping as shown and noted on the drawings and alternate two will be for perimeter fencing as shown and indicated on the drawings.
11/14/2023 08:45 PM UTC
Project No. 2023-729 Capital Project No. 3308
Project No. 2023-729 Capital Project No. 3308 Downtown Streetscape Phase II Bilbo St. Between Division St. & Mill Street City of Lake Charles, LA The general scope of work for this project consists of reconstructing paving and sidewalks at the intersection of Division Street and Hodges, and Bilbo Street between Division and Mill, and on Mill Street West of Bilbo in preparation of the new Woodring Apartment development in the 600 block of Bilbo Street. This will be accomplished by: • Reconstructing the sidewalks at the intersections to provide ADA compliant handicap sidewalk ramps • Removing the traffic signals at these intersections and converting them to 4-way stops • Constructing “bulb-outs” to further define existing streetside parking • Increasing the pavement width on the East side of Bilbo Street from Division Street to Mill Street to provide for additional parallel, streetside parking • Salvaging the existing bus-stop assembly and constructing a new bus-stop site on Mill Street This work will also require installation of new drainage features as well as the associated pavement work.
11/14/2023 08:45 PM UTC
2023-06
Professional Services - Appraisal Services
10/31/2023 07:45 PM UTC
2024-07
Professional Services - Lead Paint Testing Services
10/31/2023 07:45 PM UTC
CP 3436
City of Lake Charles, Louisiana 2022 Drainage Infrastructure Improvements – Package No. 4 CP 3436 Project scope consists of improvements to the subsurface storm drainage system along various areas throughout the City. The project shall incorporate various rehabilitation methods such as removal & replacement and cured in place pipe (CIPP) lining as well as sealing or replacement of storm drain inlets to improve drainage flow and maintain the integrity of the properties served by the system.
10/31/2023 07:45 PM UTC
51 - 60 of 389 Solicitations
1 2 3 4 6 8 9 10 38 39