City of Lake Charles
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Project No. 2024-746 Capital Project No. 3502
City of Lake Charles, Louisiana
Project No. 2024-746
Capital Project No. 3502
Kirby and Hodges Street Sidewalk Repairs
The general scope of work for this project includes the removal of hard surface pavement and installation of 4” plain concrete for sidewalks and 6” reinforced concrete for driveways or sidewalks (5.8 sack), together with 2-foot wide concrete curb and gutter and all necessary work for a complete project.
| 07/01/2025 07:45 PM UTC |
Number | Deadline |
---|---|
Capital Project No. CP3440
City of Lake Charles, Louisiana
2023 Asphalt Overlays
Lake Charles, Louisiana
City of Lake Charles Capital Project No. CP3440
LEI Project No. 23-003
The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract.
The project consists of pavement patching, degrassing edge of road and grading shoulders, adjusting sanitary sewer manholes to grade, milling asphaltic concrete pavement, asphaltic concrete surface course, asphaltic concrete ramps at paved driveways, aggregate surface course on aggregate driveways, topsoil shoulder material, hydro-seeding, and slab sodding for the following streets at various locations in the City of Lake Charles:
1. Belle Alee Lane (Holly Hill Road to Dead End)
2. Brammer Lane (Opelousas Street to Dead End)
3. Central Parkway - East (University Drive to Archwood Street)
4. Central Parkway - West (University Drive to Heather Street)
5. Fernwood Drive (Lisle Peters Road to Dead End)
6. Lucas Lane (Fernwood Drive to Dead End)
| 12/19/2023 08:45 PM UTC |
Capital Project No. CP3051
City of Lake Charles, Louisiana
2023 Citywide Striping
Lake Charles, Louisiana
City of Lake Charles Capital Project No. CP3051
LEI Project No. 23-002
This intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract.
The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles:
1. Derek Drive (Highway 14 to E. Prien Lake Road)
2. Dillard Loop (Highway 14 to Amoco Drive)
3. 5th Avenue (McNeese Street to 12th Street)
4. Benoit Lane (Sale Road to Jennifer Street)
5. Jennifer Street (Benoit Lane to Eileen Street)
6. LaGrange Street (Lake Street to Common Street)
7. McNeese Street (Nelson Road to Ryan Street)
8. Sale Road (Weaver Road to Common Street)
9. Lake Street (Country Club Road to McNeese Street)
10. Eileen Street (McNeese Street to Jennifer Street)
11. E. McNeese Street (Roundabout to All Approaches to Concrete Limits)
12. Golden Nugget Boulevard (State ROW Cove Lane to Ave L’Auberge)
13. Graywood Parkway (Big Lake Road to Roundabout)
14. Kingsley Street (Fruge Street to Mill Street)
15. Park Avenue (Shell Beach Drive to Ryan Street)
16. Wilson Avenue (Shell Beach Drive to Dr. Michael Debakey Drive)
17. Shell Beach Drive (From Asphalt/Concrete Transition to Clarence Street)
18. Pujo Street (Ryan Street to Kirkman Street)
19. Moss Street (Kirby Street to Broad Street)
20. Holly Hill Road (Chrysler Street to Sale Road)
21. Amoco Drive (Power Center Parkway to Derek Drive)
22. Dr. Michael Debakey Drive (Ryan Street to Lake Street)
23. Medora Street (Cathy Street to Highway 171)
24. Pineview Street (Highway 171 to Cathy Street)
25. Cathy Street (Medora Street to W. JB Carter Lane)
26. 7th Street (Ryan Street to 1st Avenue)
27. Street Removed from Project
28. Lakeshore Drive (Clarence Street to Mill Street)
29. Power Center Parkway (Highway 14 to East 3100 Ft. to Asphalt)
30. Simmons Street (Opelousas Street to Fitzenreiter Road)
31. Walters Street (Kirkman Street to Louisiana Avenue)
32. Weaver Road (Sale Road to South 300 Ft. – End of Concrete)
33. 14th Street (Highway 14 to 4th Avenue)
34. 1st Avenue (Prien Lake Road to Broad Street)
35. 2nd Avenue (Prien Lake Road to Broad Street)
36. 3rd Avenue (Prien Lake Road to Broad Street)
37. 4th Avenue (Prien Lake Road to Broad Street)
38. Nelson Road Roundabout (at Ham Reid Road)
The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
| 12/19/2023 08:45 PM UTC |
DR009
City of Lake Charles, Louisiana
LCPD Annex
DR009
Renovate an existing 2-story building on an existing developed site. The newly renovated space will be 2-storeis and approximately 9,190 sf. The project will include all new mechanical, electrical for the building, some paving repair, landscaping, fencing and other amenities. The project will include a new generator.
The project will include two alternates. Alternate one will be for landscaping and alternate two will be for perimeter fencing as shown and indicated on the drawings.
| 12/05/2023 08:45 PM UTC |
CP3382
City of Lake Charles, Louisiana
Anita Drive Park Development
CP3382
The Anita Drive Park is a city owned, vacant 1.56-acre tract located at the intersection for Ryder Avenue and Anita Drive within the City of Lake Charles. The proposed improvements include site construction associated with a concrete parking lot, a children’s splash pad, a picnic pavilion /shade structure, a lighted walking path, restroom facilities, open play lawn, site furnishings, site landscape, and required utility connections.
| 12/05/2023 08:45 PM UTC |
DR001
City of Lake Charles, Louisiana
LCPD Investigations
DR001
Construct a new approximately 11,000 sq ft building on a partially developed site. Project will include new paving, landscaping, fencing, and other site amenities. Project will include a new generator for the building.
The project will include two alternates. Alternate one will be for landscaping as shown and noted on the drawings and alternate two will be for perimeter fencing as shown and indicated on the drawings.
| 11/14/2023 08:45 PM UTC |
Project No. 2023-729 Capital Project No. 3308
Project No. 2023-729
Capital Project No. 3308
Downtown Streetscape Phase II
Bilbo St. Between Division St. & Mill Street
City of Lake Charles, LA
The general scope of work for this project consists of reconstructing paving and sidewalks at the intersection of Division Street and Hodges, and Bilbo Street between Division and Mill, and on Mill Street West of Bilbo in preparation of the new Woodring Apartment development in the 600 block of Bilbo Street. This will be accomplished by:
• Reconstructing the sidewalks at the intersections to provide ADA compliant handicap sidewalk ramps
• Removing the traffic signals at these intersections and converting them to 4-way stops
• Constructing “bulb-outs” to further define existing streetside parking
• Increasing the pavement width on the East side of Bilbo Street from Division Street to Mill Street to provide for additional parallel, streetside parking
• Salvaging the existing bus-stop assembly and constructing a new bus-stop site on Mill Street
This work will also require installation of new drainage features as well as the associated pavement work.
| 11/14/2023 08:45 PM UTC |
2023-06
Professional Services - Appraisal Services
| 10/31/2023 07:45 PM UTC |
2024-07
Professional Services - Lead Paint Testing Services
| 10/31/2023 07:45 PM UTC |
CP 3436
City of Lake Charles, Louisiana
2022 Drainage Infrastructure Improvements – Package No. 4
CP 3436
Project scope consists of improvements to the subsurface storm drainage system along various areas throughout the City. The project shall incorporate various rehabilitation methods such as removal & replacement and cured in place pipe (CIPP) lining as well as sealing or replacement of storm drain inlets to improve drainage flow and maintain the integrity of the properties served by the system.
| 10/31/2023 07:45 PM UTC |
Project No. 2021-717 Capital Project No. 3346
Project No. 2021-717
Capital Project No. 3346
Lakefront Boardwalk Phase II
City of Lake Charles, LA
The Lakefront Boardwalk Phase ll will construct a 15-foot-wide walkway with decorative concrete pavers approximately 1000 feet long along the recently installed steel sheet pile bulkhead placed at the Port Wonder/Crying Eagle/Parking Garage site on North beach.
This work will include the handrail and reinforced concrete pile cap on the steel sheet pile wall. Lighting, site benches, amenities, and landscaping bordering this new walkway will be incorporated into the project. Walkway access points with connectivity to Crying Eagle and the Parking Garage shall be provided. Site fill and grading along the boundary of the new sidewalk and between the parking garage and walkway will be required.
| 10/17/2023 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.