General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Project No. 2024-746 Capital Project No. 3502
City of Lake Charles, Louisiana Project No. 2024-746 Capital Project No. 3502 Kirby and Hodges Street Sidewalk Repairs The general scope of work for this project includes the removal of hard surface pavement and installation of 4” plain concrete for sidewalks and 6” reinforced concrete for driveways or sidewalks (5.8 sack), together with 2-foot wide concrete curb and gutter and all necessary work for a complete project.
07/01/2025 07:45 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
HL-SOV-26.A, 28, 34, 36, 40, 81.D.2, 111
City of Lake Charles Water & Wastewater Treatment Plants – Building Demolition Hurricane Laura (DR-4559-LA) Recovery Program Repair Project HL-SOV-26.A, 28, 34, 36, 40, 81.D.2, 111 I. Background: Gusting winds, debris impacts, and heavy rain, associated with Hurricane Laura, incurred damage to various buildings at the McNeese Water Treatment Plant and Wastewater Treatment Plant ‘B/C’, to point where the buildings are no longer suitable for occupancy and require demolition to facilitate future site improvements. II. Scope of Services: Design and implementation of demolition procedures, in response to damage incurred as result of Hurricane Laura (DR-4559-LA), to remove and dispose of damaged structures and foundations to facilitate future site improvements. This Work shall include: McNeese Water Treatment Plant (617 E. McNeese Street) • Lab Building (Insurance SOV #111) o Remove and Dispose of Existing Building, Furnishings, Utilities, etc. o Remove and Dispose of Existing Overhead Canopy o Remove and Dispose of Existing Concrete Foundation Wastewater Treatment Plant B/C (1132 W. 18th Street) • Recreation Maintenance Building (Insurance SOV #26.A) o Remove and Dispose of Existing Building, Furnishings, Utilities, etc. o Remove and Dispose of Existing Concrete Foundation • Mechanic Shop (Insurance SOV #28) o Remove and Dispose of Existing Building, Furnishings, Utilities, etc. o Remove and Dispose of Existing Concrete Foundation • Storage Building (Insurance SOV #34) o Remove and Dispose of Existing Building, Furnishings, Utilities, etc. • Supervisor Building (Insurance SOV #36) o Remove and Dispose of Existing Building, Furnishings, Utilities, etc. • Map Building (Insurance SOV #40) o Remove and Dispose of Existing Building, Furnishings, Utilities, etc. Wastewater Treatment Plant A (128 West Railroad Avenue) • Recreation Maintenance Building (Insurance SOV # 81.D.2) o Remove and Dispose of Existing Building, Furnishings, Utilities, etc. o Remove and Dispose of Existing Concrete Foundation Design services shall be as per the City of Lake Charles A&E Manual.
12/06/2022 08:45 PM UTC
2023-08
Request for Qualifications for Professional Services for Flood Mitigation, Public Safety & Citywide Resilience – BRIC 2021 on High Priority Ditches & Culverts in the 2021 Critical Drainage Improvement Program (RFQ #2023-08)
12/06/2022 08:45 PM UTC
LR0002
City of Lake Charles, Louisiana Nelson Road Extension And Bridge Utility Improvements LR0002 SCOPE OF WORK: Project scope consists of the relocation of water and sewer lines currently in conflict with the Nelson Road Extension and Bridge project by LADOTD (State Project No. H.005967). PROJECT LIMITS: Project utility relocations are west of the intersection of Sallier St. and Riverside Dr. within newly acquired right-of-way by DOTD.
11/15/2022 08:45 PM UTC
Project No. CP3040
City of Lake Charles, Louisiana 1st AVENUE TRAIL NORTH OF BROAD TO I-10 STATE PROJECT NO. H.014658 CITY OF LAKE CHARLES PROJECT NO. CP 3040 City of Lake Charles project, ‘1st Avenue Trail North of Broad to I-10’ consist of site work improvements for an identified recreational trail development area. The site work consists of traffic control, erosion control, clearing and grubbing, grading, and stockpiling of topsoil and vegetative much, saw cutting, demolition of asphaltic and concrete pavement, installation of concrete pavement, and installation of concrete curb and gutter build back, as outlined on the contract documents. This project is a Federal-Aid Construction Project with reference and inclusion of Form FHWA 1273 and its required outlined provisions for Prime Contractor, Sub-Contractors, and Lower Tier Sub-contracts.
11/01/2022 07:45 PM UTC
CP HL-14
City of Lake Charles, Louisiana Lake Charles Civic Center - Coliseum Interior Repairs CP HL-14 Return Lake Charles Civic Center Coliseum Hurricane Laura Repair Project Pre-Disaster Condition (PDC)
10/18/2022 07:45 PM UTC
RFP #2023-01, File ID #180-22
Request for Proposals for Professional Services - Program Manager for City of Lake Charles Community Development Block Grant-Disaster Recovery (CDBG-DR) Direct Allocation
10/04/2022 07:45 PM UTC
HL-83, HL-85, HL-86A, HL-86B, HL-88, HL-96, HL-101, HL-103, HL-110, HL-116
CITY OF LAKE CHARLES, LOUISIANA WATER TREATMENT PLANTS MISCELLANEOUS BUILDING REPAIRS CAPITAL PROJECT NO. HL-83, HL-85, HL-86A, HL-86B, HL-88, HL-96, HL-101, HL-103, HL-110, HL-116 I. Background: Gusting winds, debris impacts, and heavy rain, associated with Hurricane Laura, incurred minimal to severe damages to multiple buildings located at the Southwest, George H. West, Center East, Center West, Chennault, and McNeese Water Treatment Plants. This project will serve to provide necessary repairs to reinstate building functionality to pre-storm conditions. Scope items have also been identified that would serve to upgrade these antiquated systems to the latest codes and standards. II. Scope of Services: Design and implementation of building repairs, in response to damages incurred as a result of Hurricane Laura (DR-4559-LA), to pre-storm conditions and regulations as imposed by governmental bodies with the appropriate jurisdictional authority. This Work shall include the following: Southwest Water Treatment Plant (4300 Alma Lane) • Pump/Administration Building (Insurance SOV No. 116) George H. West Water Treatment Plant (225 N. Ryan Street) • Distribution/Linemen Building (Insurance SOV No. 083) • Pump/Administration Building (Insurance SOV No. 085) • Chlorine Building (Insurance SOV No. 086A) • Chlorine Building (Insurance SOV No. 086B) • Utility Building (Insurance SOV No. 088) Center East Water Treatment Plant (3207 Center Street) • Main Building (Insurance SOV No. 101) Center West Water Treatment Plant (3208 Center Street) • Pump Building (Insurance SOV No. 103) Chennault Water Treatment Plant (1501 W. Main Street) • Chlorine Building (Insurance SOV No. 096) McNeese Water Treatment Plant (617 E. McNeese Street) • Pump Building (Insurance SOV No. 110) Design services shall be as per the City of Lake Charles A&E Manual.
10/04/2022 07:45 PM UTC
HL-24, 25A, 29E, 29G, 29H, 32, 33, 81A, 81.D.1, 81M, 126E, 126C, 126D, 126J, 126K, 126F
CITY OF LAKE CHARLES, LOUISIANA WASTEWATER TREATMENT PLANTS MISCELLANEOUS BUILDING REPAIRS CAPITAL PROJECT NO. HL-24, 25A, 29E, 29G, 29H, 32, 33, 81A, 81.D.1, 81M, 126E, 126C, 126D, 126J, 126K, 126F I. Background: Gusting winds, debris impacts, and heavy rain, associated with Hurricane Laura, incurred minimal to severe damages to multiple buildings located at Wastewater Treatment Plants A, B/C, and D. This project will serve to provide necessary repairs to reinstate building functionality to pre-storm conditions. Scope items have also been identified that would serve to upgrade these antiquated systems to the latest codes and standards. II. Scope of Services: Design and implementation of building repairs, in response to damages incurred as a result of Hurricane Laura (DR-4559-LA), to pre-storm conditions and regulations as imposed by governmental bodies with the appropriate jurisdictional authority. This Work shall include the following: Wastewater Treatment Plant A (128 W. Railroad Ave., Lake Charles, LA 70601) • Office/Administration/Blower Pump Room Building (Insurance SOV No. 081A) • Storage Building No.1 (Insurance SOV NO. 081.D.1) • Sludge Processing Building (Insurance SOV No. 081M) Wastewater Treatment Plant B/C (1132 W. 18th St., Lake Charles, LA 70601) • Equipment Building (Insurance SOV No. 024) • Portable Building (Insurance SOV NO. 25A) • RAS/WAS Pump Station (Insurance SOV No. 029E) • Motor Control Center No. 1 Building (Insurance SOV No. 029G) • Motor Control Center No. 2 Building (Insurance SOV No. 029H) • Electrical Storage Building (Insurance SOV No. 32) • Portable Building (Insurance SOV No. 33) Wastewater Treatment Plant D (3820 Tank Farm Rd., Lake Charles, LA 70601) • Press Building (Insurance SOV No. 126C) • Tertiary Filter Building (Insurance SOV No. 126D) • Maintenance Building (Insurance SOV No. 126E) • Control Room Building (Insurance SOV No. 126F) • MCC Building (Insurance SOV No. 126J) • MCC Building (Insurance SOV No. 126K) • Oxidation Ditch No. 1 (Insurance SOV No. 126.A.1) Design services shall be as per the City of Lake Charles A&E Manual.
10/04/2022 07:45 PM UTC
CP HL-14
City of Lake Charles, Louisiana Lake Charles Civic Center – Marquee Replacement CP HL-14 Scope of Work: 1. Construct new 60' marquee sign as shown on attached drawing to replace the existing marquee. 2. Reuse existing pipe column structure and existing electrical and data service. 3. New marquee shall include new signage and digital message boards. 4. Provide updated electrical and data. Modify and relocate panels as required. 5. Provide (2) directional pylon signs in front of Civic Center to replace existing damaged signs. (Alternate Bid, See attached drawing). 6. Remove rust; clean and paint existing steel pipe bollards and existing metal pipe structure.
09/20/2022 07:45 PM UTC
HL-138
City of Lake Charles, Louisiana Lake Charles Police Dept Annex-Demo HL-138 Remove existing single story building, foundation, paving, and all related components in their entirety. Project includes asbestos abatement of hazardous material in building. Build back sidewalk along street.
08/02/2022 07:45 PM UTC
81 - 90 of 378 Solicitations
1 2 5 6 7 9 11 12 13 37 38