City of Lake Charles
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
CP 3492
City of Lake Charles, Louisiana
Mallard Golf Driving Range
CP 3492
1. Four covered hitting bays totaling 1,333 SF with integrated hitting surfaces, rough ins for ball tracing technology by owner, integrated hitting surfaces, dining area behind each station, heating, and architecture matching the existing clubhouse.
2. Bar area totaling 1,178 SF with fold-up doors on all sides, serving bar, and seating area, architecture consistent with existing clubhouse.
3. Paved hitting area at the driving range with 5’ x 5’ hitting mats.
4. Two additional charging stations at existing cart facility serving 12 golf carts and a paved night hitting area with durable hitting mats.
| 09/15/2026 07:45 PM UTC |
|
CP 3537
City of Lake Charles, Louisiana
Goosport Recreation Splash Pad
CP 3537
Remove the existing splash pad and build a new splash pad and putting green and other work as noted in the project plans and project manual.
| 09/15/2026 07:45 PM UTC |
|
Capital Project No. CP3051
City of Lake Charles, Louisiana
2025 Citywide Striping Package
Lake Charles, Louisiana
City of Lake Charles Capital Project No. CP3051
LEI Project No. 26-006
The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract.
The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles:
1. Southpark Road (McNeese Street to Smith Road)
2. 6th Avenue (12th Street to Broad Street)
3. Hodges Street (Alamo Street to Belden Street)
4. Bilbo Street (S. Railroad Avenue to Clarence Street)
5. Lake Street (Shell Beach Drive to Prien Lake Road)
6. Opelousas Street (Enterprise Boulevard to Highway 171)
7. Fitzenreiter Road (Riverside Park to Highway 171)
8. North Goos Boulevard (Knapp Street to Opelousas Street)
9. Medora Street (Simmons Street to Highway 171)
10. Shattuck Street (Broad Street to Moeling Street)
11. 18th Street (Lake Street to Ryan Street)
12. Enterprise Parkway (Interstate 10 to Katherine Street)
13. W. Prien Lake Road (Cove Lane Roundabout to Nelson Road)
14. Contraband Parkway (Lauberge Boulevard to Prien Lake Road)
15. Enterprise Boulevard (12th Street to Prien Lake Road)
16. Broad Street (Lakeshore Drive to Enterprise Boulevard)
17. Moeling Street (Enterprise Boulevard to Highway 171)
18. 6th Street (4th Avenue to Highway 14)
19. Mill Street (Lakeshore Drive to Highway 14)
20. Common Street (McNeese Street to Prien Lake Road)
21. Lake Street (Prien Lake Road to McNeese Street)
22. Kirkman Street (Jackson Street to McNeese Street)
23. Alamo Street (Ryan Street to Enterprise Boulevard)
24. Oak Park Boulevard (Enterprise Boulevard to Highway 14)
25. 12th Street (Highway 14 to Hodges Street)
26. Sallier Street (Lake Street to Hodges Street)
27. Ernest Street (Sale Road to Sallier Street)
28. Jefferson Drive (University Drive to University Drive)
29. Henderson Bayou Road (Locke Lane to W. Prien Lake Road)
30. General Doolittle Avenue (Highway 14 to General Twining Street)
31. Alvin Street (Sallier Street to Shell Beach Drive)
32. 18th Street (Enterprise Boulevard to Highway 14)
33. Bord du Lac Drive (Lakeshore Drive to N. Lakeshore Drive)
34. Russell Street (12th Street to Hillcrest Drive)
35. Hillcrest Drive (Highway 14 to Russell Street)
36. N. Prater Street (Knapp Street to Fitzenreiter Road)
37. Pear Street (Knapp Street to Fitzenreiter Road)
The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
| 09/15/2026 07:45 PM UTC |
| Number | Deadline |
|---|---|
|
2023-38
Purchase and Installation of GPS/Automated Vehicle Location (AVL)/Telematics/Fleet Management System for the City of Lake Charles
| 09/19/2023 07:45 PM UTC |
|
2023-42
Contract for Additional Interstate Maintenance Activities within the City Limits of Lake Charles, LA
| 09/19/2023 07:45 PM UTC |
|
2023-36
Request for Proposals for Emergency Debris Management Services
| 09/05/2023 07:45 PM UTC |
|
2023-37
Request for Proposals for Emergency Debris Monitoring Services
| 09/05/2023 07:45 PM UTC |
|
2023-35
Request for Proposals for Emergency Materials & Equipment for Disaster Mitigation
| 09/05/2023 07:45 PM UTC |
|
2023-39
Professional Services - Appraisal Services
| 09/05/2023 07:45 PM UTC |
|
2023-40
Professional Services - Lead Paint Testing Services
| 09/05/2023 07:45 PM UTC |
|
CP3385
City of Lake Charles, Louisiana
2020 Infrastructure Asphalt Overlay of Various Streets
CP3385
2020 Infrastructure Asphalt Overlay of Various City Streets
City of Lake Charles
Calcasieu Parish
City Project No. CP3385
MAI Project No. B6-22049-DA
The City of Lake Charles project scope of work consists of roadway improvements of various City streets as listed below:
• North Booker Street (Harless Street to Ray Street)
• Commercial Street (N. Prater Street to N. Booker Street)
• Commercial Street (N. Booker Street to Lincoln Street)
• Guinn Street (N. Grace Street to Cathy Street)
• Orrin Street (Harless Street to Knapp Street)
All roadway improvements will be conducted in accordance with City and industry standards.
| 09/05/2023 07:45 PM UTC |
|
DR017
City of Lake Charles, Louisiana
Hurricane Laura Storm Repairs – Ball Parks Sports Lighting Repairs - DR017
College Oaks/Weaver Park:
1. The Work includes the following:
a. Replacement of all storm damaged light poles with new metal light poles.
b. All storm damaged lighting to be replaced in like kind.
Henry Heights/Nelson Park:
1. The Work includes the following:
a. Replacement of all storm damaged light poles with new metal light poles.
b. All storm damaged lighting to be replaced in like kind.
c. Alternate 1 – All metal halide lighting to be replaced with new LED lighting. All undamaged wood poles are to be replaced with metal light poles.
| 08/01/2023 07:45 PM UTC |
|
CP 9778
City of Lake Charles, Louisiana
City of Lake Charles Civic Center Chiller Replacement
CP 9778
SECTION 01010 - SUMMARY OF WORK
PART 1 - GENERAL
RELATED DOCUMENTS
Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections, apply to this Section.
PROJECT DESCRIPTION
The project of which the "work" of this contract is a part is titled, “CITY OF LAKE CHARLES – CIVIC CENTER CHILLER REPLACEMENT”.
The project consists of the work as hereinafter specified and as shown on plans dated April 2023 and prepared by:
ADG Engineering
3004 Ryan Street
Lake Charles, LA 70601
The work, in general, consists of the following:
Base bid: The work will involve removal of existing Chiller 1A and associated piping, controls, and electrical work. The existing chilled water system will be chemically treated when complete.
WORK SEQUENCE
The Base Bid contractor shall begin immediately upon receipt of notice to proceed. Phasing shall be as hereinafter described. Contractor shall coordinate receipt of equipment materials, etc. to coincide with timetable of Phasing. Contractor shall coordinate through owner's representative and shall cooperate to provide efficient interfacing of activities.
CONTRACTOR USE OF PREMISES
General: During the construction period, the Contractor shall have full use of the premises for construction operations, including use of the site, as indicated on the Construction Documents. The contractor's use of the premises is limited only by the Owner’s right to perform construction operation with its own forces or to employ separate contractors on work not of this contract.
Confine operations to areas within Contract limits indicated. Portions of the site beyond areas in which construction operations are indicated are not to be disturbed.
Keep driveways and entrances serving the premises clear and available to the Owner and the Owner’s employees at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on site.
Use of Existing Building: Maintain the existing building in a weathertight condition throughout the construction period. Repair damage caused by construction operations. Take all precautions necessary to protect the building and its occupants during the construction period.
OWNER OCCUPANCY
Owner Occupancy: The existing building is currently occupied. Portions of the work will remain occupied throughout the course of the project. Contractor shall coordinate all requirements for access, with owner’s representatives.
Partial Owner Occupancy
The Owner reserves the right to occupy and to place and install equipment in areas of the building, prior to Substantial Completion provided that such occupancy does not interfere with completion of the work. Such placing of equipment and partial occupancy shall not constitute acceptance of the total work.
A Certificate of Substantial Completion will be executed for each specific portion of the Work to be occupied prior to Owner occupancy.
Prior to partial Owner occupancy, mechanical and electrical systems shall be fully operational. Required inspections and tests shall have been successfully completed. Upon occupancy the Owner will provide operation and maintenance of mechanical and electrical systems in occupied portions of the building.
PART 2 - PRODUCTS (Not Applicable).
PART 3 - EXECUTION (See specific sections of specifications).
PHASING
Upon Notice to Proceed, contractor shall submit a detailed phasing plan, together with first application for payment, for review and acceptance.
Existing facility shall remain open with systems in operation on a continuous basis. Where new systems are installed, existing systems shall be left in service while work is ongoing and when new systems are capable, a short duration (less than 12 hours) shut-down will be coordinated with staff to effect a change over.
| 06/06/2023 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.