City of Lake Charles
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
Capital Project Number CP3414
CITY OF LAKE CHARLES, LOUISIANA
SOUTHWEST WATER TREATMENT PLANT
BACK-UP POWER IMPROVEMENTS
CAPITAL PROJECT NUMBER CP3414
HMGP GRANT NO. DR-4559-43
I. Scope of Services:
Contractor shall complete all Work as specified or indicated in the Contract Documents for the Southwest Water Treatment Plant – Back-Up Power Improvements project. The Work includes, but is not limited to, the following:
• Removal and Replacement of the Existing Stand-By Generator with Two (2) Parallel 600kW Stand-By Diesel Generators complete with 2,500A, 480VAC, 3PH Paralleling Switchgear.
• Removal and Disposal of the Existing Manual Transfer Switch and Replacement with 2,500A, 480VAC Delayed Transition Automatic Transfer Switch.
• Installation of Low Voltage Panelboard for Supply to Generator Appurtenances.
• Interconnections to Owner’s SCADA for Generator Monitoring.
• Miscellaneous Civil and Electrical Work as Required to Complete the Work.
| 11/18/2025 08:45 PM UTC |
| Number | Deadline |
|---|---|
|
Capital Project No. CP3476
City of Lake Charles, Louisiana
2024 Asphalt Overlays
Lake Charles, Louisiana
City of Lake Charles Capital Project No. CP3476
LEI Project No. 23-009
The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract.
The project consists of pavement patching, removing and replacing combination concrete curb and gutter in isolated locations, milling asphaltic concrete pavement, asphaltic concrete surface course, pavement markings, and slab sodding in isolated locations for the following streets at various locations in the City of Lake Charles:
1. Broad Street (Lakeshore Drive to Enterprise Boulevard)
2. Kirby Street (Ryan Street to Kirkman Street)
3. Pujo Street (Ryan Street to Louisiana Avenue)
4. Ryan Street (Clarence Street to Kirby Street)
5. Ryan Street (Mill Street to River Road)
6. South Division Street (Kirkman Street to Louisiana Avenue)
7. Mill Street (Ann Street to Bilbo Street)
8. Common Street (Kirby Street to Cleveland Street)
9. Division Street (Bilbo Street to Lakeshore Drive)
10. Iris Street (Ryan Street to Common Street)
| 06/04/2024 07:45 PM UTC |
|
Capital Project No. 3491
Project No. 2024-737
Capital Project No. 3491
2024 Sewer Pipe Bursting and
Ancillary Infrastructure Improvements
City of Lake Charles, Louisiana
PROJECT SUMMARY: Rehabilitation of approximately 5780 linear feet of gravity sewer lines by pipe bursting and manhole lining, in addition to performing several drainage related point repairs.
| 06/04/2024 07:45 PM UTC |
|
CP3381
CITY OF LAKE CHARLES, LOUISIANA
CENTER WEST WATER TREATMENT PLANT
ELECTRICAL STARTER REPLACEMENT
CAPITAL PROJECT NUMBER CP3381
I. Scope of Services:
Contractor shall complete all Work as specified or indicated in the Contract Documents for the Center West Water Treatment Plant - Electrical Starter Replacement project. The Work includes, but is not limited to, the following:
• Remove and Replace Existing 100 HP Starter for Pump #1.
• Remove and Replace Existing 200 HP Starter for Pump #2.
• Remove and Replace Two (2) Existing 125 HP Starters for Wells.
• Remove and Replace Two (2) Existing 400A Disconnect Switches.
• Furnish and Install Two (2) Field Mounted 400A Disconnect Switches.
• Misc. Demolition and Rewiring to Clean-Up and As-Built Onsite Cabling.
| 05/14/2024 07:45 PM UTC |
|
Capital Project No. 3274
City of Lake Charles, Louisiana
Red Davis McCollister Water Main Extension
Capital Project No. 3274
I. Scope of Services:
Contractor shall complete all Work as specified or indicated in the Contract Documents for Red Davis McCollister Road - Waterline Extension Project (South Park Drive to Highway 14) project. The Work includes, but is not limited to, the following:
o Furnishing and installation of approximately 3400 linear feet of 20-inch C900 PVC water main and 2000 linear feet of 24-inch C900 PVC water main, along with all associated fittings, valves, hydrants, and miscellaneous items as specified within the contract documents.
| 05/14/2024 07:45 PM UTC |
|
Capital Project No. 3404
City of Lake Charles, Louisiana
Wastewater Treatment Plant D Disinfection Facility Improvements
Capital Project No. 3404
I. Scope of Services:
The City of Lake Charles owns and operates the Wastewater Treatment Plant D, located at 3820 Tank Farm Rd. In the draft permit renewals for each facility, the Department of Environmental Quality (DEQ) introduced a new effluent discharge limitation for Enterococci bacteria. Manchac has consulted with the existing disinfection equipment manufacturer and determined that the equipment will not meet the new Enterococci limits as mandated by DEQ.
This project will include the removal and replacement of the existing disinfection treatment equipment with a new Sodium Hypochlorite and Sodium Bisulfite disinfection basin. Work includes the construction of a new contact basin, new sodium hypochlorite storage building, renovations to an existing sodium bisulfite building, installation of new gravity sewer, and misc. piping.
| 04/30/2024 07:45 PM UTC |
|
2024-20
Commercial Banking Services for the City of Lake Charles
| 04/16/2024 07:45 PM UTC |
|
Capital Project Number CP3242
CITY OF LAKE CHARLES, LOUISIANA
SOUTHERN SEWER LOOP
SUNSET LIFT STATION REHABILITATION & IMPROVEMENTS
CAPITAL PROJECT NUMBER CP3242
I. Scope of Services:
Contractor shall complete all Work as specified or indicated in the Contract Documents for Sunset Lift Station Rehabilitation & Improvements project. The Work includes, but is not limited to, the following:
• Construction of Onsite Motor Control Center.
• Replacement of Existing Control Panel and Installation of VFDs.
• Installation of Stand-by Diesel Generator w/ATS.
• Relocation and Consolidation of Incoming Gravity Sewer to Lift Station.
| 04/02/2024 07:45 PM UTC |
|
CP 3274
City of Lake Charles, Louisiana
Highway 14 Water Line Extension
CP 3274
I. Scope of Services:
Contractor shall complete all Work as specified or indicated in the Contract Documents for Highway 14 Water Line Extension project. The Work includes, but is not limited to, the following:
o Furnishing and installing of approximately x linear feet of 20-inch PVC and x linear feet of 24-inch HDPE water main from East McNeese Street to Red Davis McCollister Road.
| 03/19/2024 07:45 PM UTC |
|
LCR-1
REQUEST FOR QUALIFICATIONS FOR LC REBOUND - IMPROVEMENTS TO CITY PARKS, LANDSCAPING AND BEAUTIFICATION OF RIGHT-OF-WAYS, AND STREETSCAPING
| 03/19/2024 07:45 PM UTC |
|
Capital Project No. 3423
City of Lake Charles, Louisiana
Wastewater Treatment Plant A Basin A-05 Rehabilitation
Capital Project No. 3423
I. Scope of Services:
The City of Lake Charles WWTP ‘A’ is currently under a Compliance Order (CO) with LDEQ. The approved CO schedule requires the rehabilitation of 13 sub basins in the WWTP ‘A’ Basin. The Sub Basins have been prioritized and ranked in order of severity of condition through wastewater modeling of the system.
There is approximately 18,500 LF of 6-inch through 12-inch gravity sewer pipeline to be rehabilitated (Critical and Priority 1) as part of this project. Rehabilitation methods include point repairs, pipe bursting, and manhole lining.
| 03/05/2024 08:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.