City of Lake Charles
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
DR002
City of Lake Charles, Louisiana
Lake Charles Public Works New Facility Phase 2
DR002
Scope of Project
Build a variety of new buildings on an existing partially developed site. Project to include parking, generators, underground drainage, drainage swales and detention areas, enclosed conditioned buildings, open air pavilions, vehicle canopies, a new fuel station, and other work as noted in plans and specifications.
| 02/16/2026 08:45 PM UTC |
|
LCR 401
City of Lake Charles, Louisiana
Lock Park Inclusive Playground
LCR 401
CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents for the LCR 401 Lock Park Inclusive Playground. The Work includes, but is not limited to:
PROJECT SUMMARY:
• The scope of work that is considered base bid includes:
o Necessary earthwork, grading, tree protection, and utility adjustments to accommodate the proposed playground and parking;
o Demolition of the two (2) stall concrete parking lot off 6th Street, the central pedestrian promenade connecting 6th Street to 7th Street, select removal of concrete paths to accommodate drainage and curb ramps, and the removal of select trees;
o Installation of vehicular rated concrete paving for a parking lot and entry drive, custom playground components, poured-in-place safety surfacing on a gravel and concrete base, engineered wood fiber safety surfacing, two (2) pre-engineered shade structures, concrete curbs and pedestrian paths, subsurface drainage, site lighting, playground fencing, planting, and an irrigation system.
• The scope of work that is considered alternates includes:
o Alternate No. 1: Add vehicular rated paving and curbs east of proposed drive aisle.
o Alternate No. 2: Add planting and irrigation in parking islands and in front of pavilion.
| 02/16/2026 08:45 PM UTC |
|
2026-12
Millennium Park Fall Surface Replacement
In accordance with the specifications, it is the intent of this formal invitation to receive bids from qualified bidders for Materials, Supplies and Labor for the removal of existing poured-in-place rubber surfacing, preparation of the underlying concrete slab, and installation of a synthetic turf playground surfacing system with an impact attenuation pad and silica sand infill for Millennium Park, located on the grounds of the Bord du Lac Park, adjacent to the Lake Charles Event Center.
All work shall be performed in a clean, safe, and workmanlike manner in accordance with manufacturer specifications and ASTM standards for playground surfacing safety and accessibility.
| 03/03/2026 08:45 PM UTC |
|
Project No. 2025-749 Capital Project No. 3309
PROJECT NO. 2025-749
CAPITAL PROJECT NO. 3309
HAM REID ROAD WATERLINE EXTENSION-
ELLIOTT RD. TO BIG LAKE RD.
CITY OF LAKE CHARLES, LA
SCOPE OF WORK:
The scope of work includes the installation of new 12” diameter waterline along the north side of Ham Reid Road between Elliot Road and Big Lake Highway (LA 384). The scope also includes the relocation of the existing 12” diameter water line at the intersection of La 384 and Graywood Parkway in anticipation of a new round-a-bout at this location.
| 03/03/2026 08:45 PM UTC |
| Number | Deadline |
|---|---|
|
Project No. 2024-739 DR010
City of Lake Charles, Louisiana
Project No. 2024-739
DR010
LCFD Fire Training Facility Demo & Earthwork
PROJECT SUMMARY: The general scope of work for this project consists of demolition and removal of the former school building and improvements as shown on the plans. Once the building demolition has occurred, the removal and disposal of the of the top 2 feet of existing soil within the limits shown on the plans, followed by the furnishing and installation of lime conditioned select fill to the proposed elevation identified. The select fill will be installed in multiple lifts and compacted to the required density as monitored by engineer and testing laboratory.
| 10/15/2024 07:45 PM UTC |
|
CP 3492
City of Lake Charles, Louisiana
Mallard Golf Club
Driving Range Lighting
CP 3492
SCOPE OF WORK
A. Driving Range Lighting
1) Installation of light poles, conduit, and all associated electrical.
B. Site Access
1) Stabilization and protection of site access drive for material and light pole delivery.
2) Repair of concrete paving damaged by site access
3) Repair of landscaping and regrading of site to return to its preconstruction state.
PRODUCTS, WORKS AND SERVICES PROVIDED BY THE OWNER
A. Testing lab services.
INSTALLATION OF OWNER PROVIDED AND ALLOWABLE PRODUCTS
A. The contractor shall provide accessories and installation of such products, unless specified otherwise.
| 10/15/2024 07:45 PM UTC |
|
2024-26
Request for Qualifications for Consultant Services in Response to SAFE STREETS AND ROADS FOR ALL (SS4A) – SAFETY ACTION PLAN
| 09/03/2024 07:45 PM UTC |
|
CP 3274
City of Lake Charles, Louisiana
Gauthier Rd Waterline Extension CP 3274
I. Scope of Services:
Contractor shall complete all Work as specified or indicated in the Contract Documents for Gauthier Road Waterline Extension project. The Work includes, but is not limited to, the following:
o Furnishing and installing of approximately 1300 linear feet of 18-inch PVC and 900 linear feet of 20-inch HDPE water main from Nelson Road to Southpark Drive.
| 07/16/2024 07:45 PM UTC |
|
Capital Project Number CP3070
CITY OF LAKE CHARLES, LOUISIANA
WWTP B/C OXIDATION DITCH REPAIRS & IMPROVEMENTS
CAPITAL PROJECT NUMBER CP3070
Scope of Services:
Contractor shall complete all Work as specified or indicated in the Contract Documents for the WWTP B/C Oxidation Ditch Repairs and Improvements Project. The Work includes, but is not limited to, the following:
• Remove and replace all bearings and couplings in Oxidation Ditch No. 1.
• Remove 60 HP direct coupled motors/gearboxes (6 EA) from Oxidation Ditch No. 1 and replace with 60 HP belt driven motors/gearboxes (6 EA).
• Furnish and install 100A NEMA 4XSS disconnect switch near each motor at Oxidation Ditch No.’s 1 and 2 (12 EA).
• Furnish and install CAT6 ethernet cable in existing 1” conduit (2 EA) for wireless gateway monitoring system.
| 07/02/2024 07:45 PM UTC |
|
Project No. 2024-738 Capital Project No. 3493
Project No. 2024-738
Capital Project No. 3493
Ryan Street Drainage Improvements –
Clarence to Kirby St
City of Lake Charles, Louisiana
PROJECT SUMMARY: The general scope of work for this project includes the rehabilitation and reconstruction of existing drainage infrastructure on Ryan Street from Clarence Street to Kirby Street. This work includes the installation of new drainage pipe and boxes, rehab of existing drainage where possible, and the associated roadway pavement repairs to facilitate the drainage improvements.
| 07/02/2024 07:45 PM UTC |
|
2024-24
Transit Advertising Program for Lake Charles Transit
| 06/04/2024 07:45 PM UTC |
|
Capital Project No. CP3476
City of Lake Charles, Louisiana
2024 Asphalt Overlays
Lake Charles, Louisiana
City of Lake Charles Capital Project No. CP3476
LEI Project No. 23-009
The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract.
The project consists of pavement patching, removing and replacing combination concrete curb and gutter in isolated locations, milling asphaltic concrete pavement, asphaltic concrete surface course, pavement markings, and slab sodding in isolated locations for the following streets at various locations in the City of Lake Charles:
1. Broad Street (Lakeshore Drive to Enterprise Boulevard)
2. Kirby Street (Ryan Street to Kirkman Street)
3. Pujo Street (Ryan Street to Louisiana Avenue)
4. Ryan Street (Clarence Street to Kirby Street)
5. Ryan Street (Mill Street to River Road)
6. South Division Street (Kirkman Street to Louisiana Avenue)
7. Mill Street (Ann Street to Bilbo Street)
8. Common Street (Kirby Street to Cleveland Street)
9. Division Street (Bilbo Street to Lakeshore Drive)
10. Iris Street (Ryan Street to Common Street)
| 06/04/2024 07:45 PM UTC |
|
Capital Project No. 3491
Project No. 2024-737
Capital Project No. 3491
2024 Sewer Pipe Bursting and
Ancillary Infrastructure Improvements
City of Lake Charles, Louisiana
PROJECT SUMMARY: Rehabilitation of approximately 5780 linear feet of gravity sewer lines by pipe bursting and manhole lining, in addition to performing several drainage related point repairs.
| 06/04/2024 07:45 PM UTC |
|
CP3381
CITY OF LAKE CHARLES, LOUISIANA
CENTER WEST WATER TREATMENT PLANT
ELECTRICAL STARTER REPLACEMENT
CAPITAL PROJECT NUMBER CP3381
I. Scope of Services:
Contractor shall complete all Work as specified or indicated in the Contract Documents for the Center West Water Treatment Plant - Electrical Starter Replacement project. The Work includes, but is not limited to, the following:
• Remove and Replace Existing 100 HP Starter for Pump #1.
• Remove and Replace Existing 200 HP Starter for Pump #2.
• Remove and Replace Two (2) Existing 125 HP Starters for Wells.
• Remove and Replace Two (2) Existing 400A Disconnect Switches.
• Furnish and Install Two (2) Field Mounted 400A Disconnect Switches.
• Misc. Demolition and Rewiring to Clean-Up and As-Built Onsite Cabling.
| 05/14/2024 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.