RFP #2026-25
Request for Proposals for Entertainment, Food and Beverage Establishment on the Lakefront
| 07/14/2026 07:45 PM UTC |
|
Capital Project Number 3544
City of Lake Charles
Hodges Street Waterline Extension
Capital Project Number 3544
I. Background:
Homes along Hodges Street are experiencing ongoing low water pressure issues. Existing infrastructure along this section of the distribution system is undersized and unable to adequately meet current household demand, resulting in inconsistent and insufficient water pressure within several homes. By extending and upgrading the waterline, the project will improve system capacity, enhance water flow, and provide more reliable service to affected properties. This improvement is intended to ensure adequate water pressure for daily use and to support long-term reliability of the neighborhood’s water distribution system.
II. Project Scope of Work:
Design and implementation of ~1,500 feet of 6-inch diameter waterline including a looping connection on W. Prien Lake Road and a looping connection on E. Hale Street.
Design Services shall be as per the City of Lake Charles A&E Manual.
| 08/04/2026 07:45 PM UTC |
|
Capital Project No. CP2894
City of Lake Charles, Louisiana
WWTP A McNabb and Cline Street
Emergency Sewer System Rehabilitation
Capital Project No. CP2894
I. Background:
Waggoner Engineering, Inc. (Waggoner) was retained by the City of Lake Charles, Louisiana to evaluate and address deficiencies within the existing sanitary sewer collection system along McNabb Street between Broad Street and Cline Street. Approximately 2,250 linear feet of existing 18-inch reinforced concrete sanitary sewer pipe along McNabb Street has been identified as being in poor structural condition. Observed deficiencies include cracking and joint separation. Due to the severity and extent of the deterioration, the sewer line is no longer suitable for spot repairs or lining and requires full replacement. Rehabilitation of this segment will be performed using pipe bursting methods to install new 18-inch high-density polyethylene (HDPE) pipe, minimizing surface disruption while significantly improving the long-term performance and reliability of the sanitary sewer system.
II. Project Scope of Work:
Design and construction services for the repair and rehabilitation of the existing 18-inch gravity sanitary sewer collection system along McNabb Street, between Broad Street and Cline Street, to address documented system deterioration. Design services shall be as per the City of Lake Charles A&E Manual. The work will include, but is not limited to, the following:
• Replacement of the existing 18-inch gravity sewer main via pipe bursting installation.
• Reinstating of existing sanitary sewer service laterals to the rehabilitated main.
• Furnishing, installation, operation, and maintenance of temporary bypass pumping to maintain continuous sewer service during construction.
| 08/04/2026 07:45 PM UTC |
| Number | Deadline |
|---|---|
|
CP 3257
City of Lake Charles, Louisiana
Sally Mae (Medora – Dead End) Phase II
CP 3257
The Sally Mae Street Drainage & Overlay project for the City of Lake Charles, Louisiana, involves improvements to Sally Mae Street that include grading, earthwork, installation of new and replacement drainage infrastructure, sub-surface drainage, and an asphaltic overlay of the roadway. The scope also covers driveway replacements, utility coordination, and erosion control measures to enhance stormwater management and roadway durability along the project corridor.
| 10/14/2025 07:45 PM UTC |
|
Project No. 2023-727 Capital Project No. 3469
City of Lake Charles, Louisiana
E. McNeese Sidewalk -
Corbina Rd. to Lake Crest Blvd
Project No. 2023-727
Capital Project No. 3469
PROJECT SUMMARY: The general scope of work for Project No. 2023-727 involves installing a new 8’ wide sidewalk on the North side of East McNeese Street from the East side of the roundabout at Corbina Rd. to Lake Crest Blvd. This work includes the associated roadway pavement work to facilitate the sidewalk installation.
| 09/02/2025 07:45 PM UTC |
|
Capital Project Number CP 3274
CITY OF LAKE CHARLES, LOUISIANA
SOUTH PARK DRIVE WATERLINE EXTENSION
(E. GAUTHIER RD. TO RED DAVIS MCCOLLISTER RD.)
CITY OF LAKE CHARLES CAPITAL PROJECT NUMBER
CP 3274
I. Scope of Services:
Contractor shall complete all Work as specified or indicated in the Contract Documents for South Park Drive Waterline Extension project. The Work includes, but is not limited to, the following:
o Furnishing and installing of approximately 3,008 linear feet of 20-inch PVC and 2,078 linear feet of 24-inch HDPE water main from Red Davis McCollister Road to East Gauthier Road.
| 08/05/2025 07:45 PM UTC |
|
Project No. 2024-746 Capital Project No. 3502
City of Lake Charles, Louisiana
Project No. 2024-746
Capital Project No. 3502
Kirby and Hodges Street Sidewalk Repairs
The general scope of work for this project includes the removal of hard surface pavement and installation of 4” plain concrete for sidewalks and 6” reinforced concrete for driveways or sidewalks (5.8 sack), together with 2-foot wide concrete curb and gutter and all necessary work for a complete project.
| 07/01/2025 07:45 PM UTC |
|
LCR409
City of Lake Charles, Louisiana
Buddy Prejean Park Enhancements
LCR409
The overall project will include renovations/upgrades to the (2) existing ball fields. The existing fields will have all components removed and new installed. This will include new fencing, new dugouts, new lighting at the baseball field, and new backstop. The fields will be one for baseball and one for softball. The fields will be built to NHSA dimensions for high school sizes and be natural grass/clay. Other miscellaneous components will be provided as needed for a complete and useful project.
Alternate No. 1 is for additional fencing and gates as shown on the project drawings.
| 06/17/2025 07:45 PM UTC |
|
CP3450
CITY OF LAKE CHARLES, LOUISIANA
WASTEWATER TREATMENT PLANT ‘A’
OPERATIONAL RELIABILITY IMPROVEMENTS
LIFT STATION ELECTRICAL UPGRADES
CAPITAL PROJECT NUMBER CP3450
I. Scope of Services:
Contractor shall complete all Work as specified or indicated for Wastewater Treatment Plant ‘A’ – Operational Reliability Improvements – Lift Station Electrical Upgrades. The Work includes, but is not limited to, the following:
• Booker Street Lift Station (120 N. Booker Street)
o Earthwork to Erect Access Driveways for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• N. Blake Street Lift Station (1306 N. Blake Street)
o Clearing and Grubbing to Facilitate the Work
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Replacement of Existing SCADA Components to Upgrade Site Communication
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Opelousas Street Lift Station (3038 Opelousas Street)
o Furnish and Install Domestic Water Service
o Furnish and Install Bypass Connection for Temporary Service
o Remove and Replace Existing Wet Well Topping Slab and Valve Vault
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Furnish and Install Temporary Bypass Pumping to Maintain Site Operation
o Removal and Replacement of Existing Electrical Rack
o Installation and Commissioning of an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Installation and Commissioning of a Duplex Pump Control Panel
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Broad Street Lift Station (3219 Broad Street)
o Furnish and Install Bypass Connection for Temporary Service
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• 3rd Ave. & 3rd St. Lift Station (949 Third Avenue)
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Replacement and Installation of Misc. Electrical Gear/Fixtures
o Replacement of Existing SCADA Components to Upgrade Site Communication
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Colletta Street Lift Station (2218 Colletta Street)
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Installation and Commissioning of a Triplex Pump Control Panel
o Installation and Commissioning of Three (3) Variable Frequency Drives
o Installation and Commissioning of Pump Junction Box and Level Junction Box
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• St. John Street Lift Station (1318 St. John Street)
o Furnish and Install Bypass Connection for Temporary Service
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Installation and Commissioning of a Triplex Pump Control Panel
o Installation and Commissioning of Three (3) Variable Frequency Drives
o Installation and Commissioning of Pump Junction Box and Level Junction Box
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
• Cline Street Lift Station (2715 Cline Street)
o Clearing and Grubbing to Facilitate the Work
o Erection of Concrete Revetment for Embankment Protection
o Earthwork to Erect Access Driveway for Project Site
o Erection of Fencing/Gates for Site Security
o Relocation of Existing OHP Service in Coordination with Utility Provider
o Replacement of Existing MTS with an Automatic Transfer Switch
o Installation and Commissioning of a Diesel Back-Up Generator
o Installation and Commissioning of a Triplex Pump Control Panel
o Installation and Commissioning of Three (3) Variable Frequency Drives
o Installation and Commissioning of Pump Junction Box and Level Junction Box
o Installation and Commissioning of a SCADA Panel
o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
| 05/20/2025 07:45 PM UTC |
|
CP2876
CITY OF LAKE CHARLES, LOUISIANA
CITY HALL BACK UP POWER AND MCC IMPROVEMENTS PROJECT
CAPITAL PROJECT NUMBER CP2876
I. Background:
In light of recurring power failures and a lack of adequate back-up power facilities at the City Hall Facility, the City would like to replace the existing facilities with a reliable, secondary power source. Additionally, due to location of and the recent damage to the buildings motor control center it is the desire of the City to harden this facility with an exterior motor control center and installation of properly sized back-up power facilities to mitigate future, potential concerns in event of outages related to hurricanes, hard freezes, etc. This project will improve the facility’s durability, preparedness for natural disasters, sustainability for the operation of the City, and increase reliability for customers system-wide.
II. Scope of Services:
Design of complete electrical and back-up power solutions. This Work shall include:
• Furnish and Install 450KW, Natural Gas Generator
• Furnish and Install an Automatic Transfer Switch
• Installation of Generator Slab
• Installation of a new exterior MCC building
• Installation of a new MCC
• Installation of splice blocks, conduit and wire to extend existing feeds to MCC building.
• Miscellaneous Site Improvements including concrete paving modifications, fencing modifications, etc.
• Interconnections of Generator/MCC improvements to existing infrastructure
| 05/20/2025 07:45 PM UTC |
|
CP3511
Huber Park Playground and Parking Improvements
Lake Charles City Project No. CP3511
1. Relocation of existing playground equipment at southeast corner of Huber Park to more central location at the park.
2. The addition of approximately 35 internal parking spaces at the southeast corner of the park. The parking will accommodate access points on both 4th Avenue and Orchid Street to avoid dead end circulation.
| 05/06/2025 07:45 PM UTC |
|
CP3426
City of Lake Charles
Wastewater Treatment Plant A
Operational Reliability Improvements Collection System Hardening
Capital Project Number CP3426
I. Scope of Work:
Implementation of CIPP lining and repairs, as needed, to large diameter (i.e. 24-inch diameter and above) gravity collection mains within the treatment site's service area to reduce I&I to better pump operations and work towards meeting requirements of the subject compliance order. This Work shall be more thoroughly described as:
Collection System Hardening
• Ford Street from Church Street to Mill Street – (~ 1,367 ft of 24”)
o Cleaning/CCTV of Existing 24” Diameter Gravity Sewer Main
o Installation of CIPP Lining within Existing 24” Diameter Gravity Sewer Main
o Reinstitute Existing Sanitary Sewer Service Laterals
o Interior Protective Lining of Existing Concrete Manholes
o Furnish, Install, and Maintain Bypass Pumping
• Pine Street from Ford Street to Reid Street – (~ 920 ft of 24”)
o Cleaning/CCTV of Existing 24” Diameter Gravity Sewer Main
o Installation of CIPP Lining within Existing 24” Diameter Gravity Sewer Main
o Reinstitute Existing Sanitary Sewer Service Laterals
o Interior Protective Lining of Existing Concrete Manholes
o Furnish, Install, and Maintain Bypass Pumping
• N. Railroad Avenue from Bilbo Street to Enterprise Boulevard –
(~ 3,510 ft of 30” and ~ 3,520 ft of 36”)
o Cleaning/CCTV of Existing 30” Diameter Gravity Sewer Main
o Cleaning/CCTV of Existing 36” Diameter Gravity Sewer Main
o Installation of CIPP Lining within Existing 30” Diameter Gravity Sewer Main
o Installation of CIPP Lining within Existing 36” Diameter Gravity Sewer Main
o Reinstitute Existing Sanitary Sewer Service Laterals
o Interior Protective Lining of Existing Concrete Manholes
o Furnish, Install, and Maintain Bypass Pumping
| 04/01/2025 07:45 PM UTC |
|
CP3512
City of Lake Charles, Louisiana
Goosport Park New Pool and Improvements
CP3512
Providing a new pool to the north of the existing Goosport Park multi-purpose family community center. Project will include a new swimming pool, new pool equipment, new concrete deck, new fencing and other work as noted on drawings and specifications.
| 04/01/2025 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.