City of Lake Charles
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
Capital Project Number CP3414
CITY OF LAKE CHARLES, LOUISIANA
SOUTHWEST WATER TREATMENT PLANT
BACK-UP POWER IMPROVEMENTS
CAPITAL PROJECT NUMBER CP3414
HMGP GRANT NO. DR-4559-43
I. Scope of Services:
Contractor shall complete all Work as specified or indicated in the Contract Documents for the Southwest Water Treatment Plant – Back-Up Power Improvements project. The Work includes, but is not limited to, the following:
• Removal and Replacement of the Existing Stand-By Generator with Two (2) Parallel 600kW Stand-By Diesel Generators complete with 2,500A, 480VAC, 3PH Paralleling Switchgear.
• Removal and Disposal of the Existing Manual Transfer Switch and Replacement with 2,500A, 480VAC Delayed Transition Automatic Transfer Switch.
• Installation of Low Voltage Panelboard for Supply to Generator Appurtenances.
• Interconnections to Owner’s SCADA for Generator Monitoring.
• Miscellaneous Civil and Electrical Work as Required to Complete the Work.
| 11/18/2025 08:45 PM UTC |
| Number | Deadline |
|---|---|
|
CP 3339
City of Lake Charles, Louisiana
Lakefront Parking Garage – Phase II
CP 3339
Lakefront Parking Garage – Phase II
Estimate of Probable Cost
6/3/2021
1. The Work includes repairs to existing parking garage structure.
a. Demolition and removal of misc. metal and CMU walls.
b. Replacement of existing electrical equipment, new lighting & specialty lighting.
c. New storefront systems for elevator lobby.
d. New curtain wall system.
e. New exterior metal stair units.
f. Repairs to existing buildings including roofing, fascia, soffit, pre-finished metal siding, framing, sheathing, flooring, re-painting etc.
g. New retaining wall foundations and waterproofing.
h. Fascade replacement of pre-finished metal wall panels.
i. Re-stripping of parking area & misc. painting.
| 07/20/2021 07:45 PM UTC |
|
HL - 02, 06, 135, 136
City of Lake Charles, Louisiana
Hurricane Laura storm Repairs – Multiple Ball Park Repairs
HL - 02, 06, 135, 136
1. The Work includes repairs to multiple existing park facilities including ball fields, concession
stands, restrooms, bleachers and covers.
a. Repair existing bleacher cover structures. Replace damaged bleachers.
b. Chain-link fencing repair/replacement.
c. Repairs to lighting and mechanical systems.
d. Repairs to existing buildings including roofing, fascia, soffit, siding, framing, sheathing, flooring, gypsum board, painting etc.
| 07/20/2021 07:45 PM UTC |
|
HL - 55
City of Lake Charles, Louisiana
Hurricane Laura Storm Repairs – Central School - Interiors
HL - 55
The general scope of work will include repair to damaged plaster walls and ceilings, repainting, repair/replacement of damaged wood trim, wood floor repair, carpet replacement, installing a new mechanical yard for replaced HVAC systems, electrical repairs, misc. plumbing and site drainage repairs.
| 07/20/2021 07:45 PM UTC |
|
CP3231
City of Lake Charles, Louisiana
2nd Street Rehabilitation (6th Avenue to 8th Avenue) CP3231
The referenced project will include the following improvements to 2nd Street from 6th Avenue to 8th Avenue:
• Rehabilitation of existing asphalt roadway with cement stabilized base and new asphalt pavement
• Installation of concrete sidewalk
• Installation of subsurface drainage system
| 07/20/2021 07:45 PM UTC |
|
Project No. CP 3316
City of Lake Charles, Louisiana
Mallard Golf Club Lake Charles
Clubhouse & Pro Shop
CP 3316
New 7000 SF Clubhouse facility will include Pro Shop, Offices, Restrooms, Dinning/Bar and Kitchen
| 07/06/2021 07:45 PM UTC |
|
HL-SOV-95/96/98/99/101-108/110/112-114
CITY OF LAKE CHARLES, LOUISIANA
HURRICANE LAURA (DR-4559-LA) DISASTER RECOVERY PROGRAM
WATER TREATMENT PLANTS – CHEMICAL FEED SYSTEM REPAIRS
PROJECT NUMBER HL-SOV-95/96/98/99/101-108/110/112-114
I. Background:
Gusting winds, debris impacts, and heavy rain, associated with Hurricane Laura, incurred damage to the chemical feed systems at the Center East, Center West, Chennault, and McNeese Water Treatment Plants, to the point where the systems are not operational. This project will serve to re‐instate operation of ALL chemical feed systems and return the water system to its pre‐storm operation. Scope items have also been identified that would serve to upgrade these antiquated systems to the latest codes and standards.
II. Scope of Services:
Design and implementation of mechanical and electrical improvements, in response to damage incurred as a result of Hurricane Laura (DR‐4559‐LA), to reinstate the damaged systems to pre‐storm conditions and to upgrade these existing systems to coincide with newly applicable codes, standards, and regulations as imposed by governmental bodies with the appropriate jurisdictional authority.
This Work shall include the following:
Center East Water Treatment Plant (3207 Center Street)
• Chlorine Feed System (Insurance SOV #101)
o Remove and Replace Exterior Door w/Panic Hardware and Inspection Window
o Remove and Replace Deteriorated Security Chains for Chlorine Cover (TYP. of 4)
• Fluoride Feed System (Insurance SOV #102)
o Removal and Disposal of ~600 Gallons of Diluted Chemical
o Repair Apparent Leak on Bulk Storage Discharge Line (1‐Inch)
o Furnish and Install #24 Mesh, Fiberglass Screen on Bulk Storage Vent
o Remove and Replace 1,000 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
• Phosphate Feed System (Insurance SOV #104)
o Removal and Disposal of ~700 Gallons of Diluted Chemical
o Remove and Replace Damaged Vent Screen on Fiberglass Enclosure
o Remove and Replace Damaged Exhaust Fan on Fiberglass Enclosure
o Remove and Replace 1,000 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
• Caustic Feed System (Insurance SOV #108)
o Removal and Disposal of ~700 Gallons of Diluted Chemical
o Furnish and Install New Bulk Storage Fill Line (2‐Inch)
o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height)
o Remove and Replace Seal Fittings on Existing Junction Box (TYP. of 3, 3/4”)
o Remove and Replace Damaged Vent Screen on Fiberglass Enclosure
o Remove and Replace 1,000 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
Center West Water Treatment Plant (3208 Center Street)
• Caustic Feed System (Insurance SOV #103)
o Removal and Disposal of ~1,300 Gallons of Diluted Chemical
o Furnish and Install New Bulk Storage Fill Line (2‐Inch)
o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height)
o Remove and Replace Damaged Isolation Valve on Bulk Storage Discharge (1‐Inch)
o Furnish and Install 200 Gallon Day Tank w/Piping and Appurtenances (1‐Inch)
o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
• Phosphate Feed System (Insurance SOV #105)
o Re‐Grout and Finish Concrete Slab for Installation of New Enclosure
o Remove and Replace Damaged Electrical Conduit & Wiring w/Stanchion Supports
o Re‐Terminate Electrical Service from Pump Building and Well Controls
o Remove/Replace/Anchor New Fiberglass Enclosure w/Appurtenances
o Furnish and Install New Injection Line from Pump Discharge (1/2‐Inch)
o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch)
o Furnish and Install Duplex Metering Pump Skid
o Furnish and Install Hose‐type Chemical Transfer Pump (TYP. of 1)
o Furnish and Install 50 Gallon Day Tank w/Piping and Appurtenances (1‐Inch)
o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
• Fluoride Feed System (Insurance SOV #106)
o Removal and Disposal of ~1,100 Gallons of Diluted Chemical
o Remove and Replace Damaged Vent Screen on Fiberglass Enclosure
o Furnish and Install #24 Mesh, Fiberglass Screen on Bulk Storage Vent
o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
Chennault Water Treatment Plant (1501 W. Main Street)
• Caustic Feed System (Insurance SOV #95)
o Re‐Grout and Finish Concrete Slab for Installation of New Enclosure
o Furnish and Install Electrical Wiring/Conduit for Electrical Service and Controls
o Terminate Electrical Service into Existing Low Voltage Panelboard and QDS PLC
o Furnish/Install/Relocate Fiberglass Enclosure w/Appurtenances
o Re‐Terminate into Injection Line from Pump Discharge (1/2‐Inch)
o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch)
o Furnish and Install New Bulk Storage Fill Line (2‐Inch)
o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height)
o Furnish and Install Duplex Metering Pump Skid
o Furnish and Install Hose‐type Chemical Transfer Pump (TYP. of 1)
o Furnish and Install 150 Gallon Day Tank w/Piping and Appurtenances (1‐Inch)
o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
• Chlorine Feed System (Insurance SOV #96)
o Remove and Replace Exterior Door w/Panic Hardware and Inspection Window
o Remove and Replace Damaged Exterior Windows (TYP. of 3)
o Remove and Replace Deteriorated Security Chains for Chlorine Cover (TYP. of 4)
• Fluoride Feed System (Insurance SOV #98)
o Furnish and Install New Bulk Storage Fill Line (2‐Inch)
o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height)
o Remove and Replace Damaged Vent Screen on Fiberglass Enclosure
o Furnish and Install #24 Mesh, Fiberglass Screen on Bulk Storage Vent
o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
• Phosphate Feed System (Insurance SOV #99)
o Re‐Grout and Finish Concrete Slab for Installation of New Enclosure
o Furnish and Install Electrical Wiring/Conduit for Electrical Service and Controls
o Terminate Electrical Service into Existing Low Voltage Panelboard and QDS PLC
o Furnish/Install/Relocate Fiberglass Enclosure w/Appurtenances
o Re‐Terminate into Injection Line from Pump Discharge (1/2‐Inch)
o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch)
o Furnish and Install New Bulk Storage Fill Line (2‐Inch)
o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height)
o Furnish and Install Duplex Metering Pump Skid
o Furnish and Install Hose‐type Chemical Transfer Pump (TYP. of 1)
o Furnish and Install 50 Gallon Day Tank w/Piping and Appurtenances (1‐Inch)
o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
McNeese Water Treatment Plant (617 E. McNeese Street)
• Caustic Feed System (Insurance SOV #110)
o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch)
o Furnish and Install New Bulk Storage Fill Line (2‐Inch)
o Furnish and Install New Fill Line Stanchion Support w/Bracket (~36” Height)
o Furnish and Install 200 Gallon Day Tank w/Piping and Appurtenances (1‐Inch)
o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
• Chlorine Feed System (Insurance SOV #112)
o Remove and Replace Damaged Electrical Conduit & Wiring w/Support Brackets
o Remove and Replace Deteriorated Security Chains for Chlorine Cover (TYP. of 4)
o Remove/Replace/Anchor Fiberglass Enclosure w/Appurtenances
• Fluoride Feed System (Insurance SOV #113)
o Re‐Grout and Finish Concrete Slab for Installation of New Enclosure
o Remove and Replace Damaged Electrical Conduit & Wiring w/Stanchion Supports
o Re‐Terminate Electrical Service from Pump Building and Well Controls
o Remove/Replace/Anchor New Fiberglass Enclosure w/Appurtenances
o Furnish and Install New Injection Line from Pump Discharge (1/2‐Inch)
o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch)
o Furnish and Install Duplex Metering Pump Skid
o Furnish and Install Hose‐type Chemical Transfer Pump (TYP. of 1)
o Furnish and Install 50 Gallon Day Tank w/Piping and Appurtenances (1‐Inch)
o Furnish and Install #24 Mesh, Fiberglass Screen on Bulk Storage Vent
o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
• Phosphate Feed System (Insurance SOV #114)
o Re‐Grout and Finish Concrete Slab for Installation of New Enclosure
o Remove and Replace Damaged Electrical Conduit & Wiring w/Stanchion Supports
o Re‐Terminate Electrical Service from Pump Building and Well Controls
o Remove/Replace/Anchor New Fiberglass Enclosure w/Appurtenances
o Furnish and Install New Injection Line from Pump Discharge (1/2‐Inch)
o Furnish and Install New Bulk Storage Discharge Line w/Sight Glass (1‐Inch)
o Furnish and Install Duplex Metering Pump Skid
o Furnish and Install Hose‐type Chemical Transfer Pump (TYP. of 1)
o Furnish and Install 50 Gallon Day Tank w/Piping and Appurtenances (1‐Inch)
o Remove and Replace 1,500 Gallon Double‐Walled Bulk Storage Tank
o Complete Hydrostatic Fill Test to Confirm Bulk Storage Tank’s Integrity
| 07/06/2021 07:45 PM UTC |
|
Repair Project HL-SOV-081
City of Lake Charles
WWTP A Tank Debris Removal and Disposal Project
Hurricane Laura (DR-4559-LA) Recovery Program
Repair Project HL-SOV-081
I. Scope of Services:
Removal of storm blown debris from open top wastewater tanks at WWTP A, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following:
A. GENERAL
1. Sludge material in tanks listed below to be dewatered, hauled, and disposed of at an approved landfill.
2. The landfilled product shall have a minimum solids content of 16%.
3. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein.
B. WWTP A
1. Remove and dispose of settled debris in Digester No. 1 (SOV 81.F.1).
2. Remove and dispose of settled debris in Digester No. 2 (SOV 81.F.2).
3. Remove and dispose of settled debris in Aeration Basin No. 1 (SOV 81.G.1).
4. Remove and dispose of settled debris in Aeration Basin No. 2 (SOV 81.G.2).
5. Remove and dispose of settled debris in Aeration Basin No. 3 (SOV 81.G.3).
6. Remove and dispose of settled debris in Aeration Basin No. 4 (SOV 81.G.4).
| 06/01/2021 07:45 PM UTC |
|
Repair Project HL-SOV-029
City of Lake Charles
WWTP B/C Tank Debris Removal and Disposal Project
Hurricane Laura (DR-4559-LA) Recovery Program
Repair Project HL-SOV-029
I. Scope of Services:
Removal of storm blown debris from open top wastewater tanks at WWTP B/C, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following:
A. GENERAL
1. Sludge material in tanks listed below to be dewatered, hauled, and disposed of at an approved landfill.
2. The landfilled product shall have a minimum solids content of 16%.
3. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein.
B. WWTP B/C
1. Remove and dispose of debris in Digester No. 1 (SOV 29).
2. Remove and dispose of debris in Aeration Basin No. 1 (SOV 29.A.1).
| 06/01/2021 07:45 PM UTC |
|
Repair Project HL-SOV-126
City of Lake Charles
WWTP D Tank Debris Removal and Disposal Project
Hurricane Laura (DR-4559-LA) Recovery Program
Repair Project HL-SOV-126
I. Scope of Services:
Removal of storm blown debris from open top wastewater tanks at WWTP D, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following:
A. GENERAL
1. Sludge material in tanks listed below to be dewatered, hauled, and disposed of at an approved landfill.
2. The landfilled product shall have a minimum solids content of 16%.
3. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein.
B. WWTP D
1. Remove and dispose of debris in Digester No. 1 (SOV 126.B.1).
2. Remove and dispose of debris in Digester No. 2 (SOV 126.B.2).
3. Remove and dispose of debris in Digester No. 3 (SOV 126.B.3).
4. Remove and dispose of debris in Oxidation Ditch No. 1 (SOV 126.A.1).
5. Remove and dispose of debris in Oxidation Ditch No. 2 (SOV 126.A.2).
6. Remove and dispose of debris in Oxidation Ditch No. 3 (SOV 126.A.3).
7. Remove and dispose of debris in Anoxic Tank No. 1 (SOV 126.A.4).
8. Remove and dispose of debris in Anoxic Tank No. 2 (SOV 126.A.5).
| 06/01/2021 07:45 PM UTC |
|
2021-HL54
Request for Qualifications for Construction Contracting Services - Historic Structure
| 06/01/2021 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.