General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Project No. 2023-734 Capital Project No. 3400
Project No. 2023-734 Capital Project No. 3400 18th Street Reconstruction (Lake St. to Creole St.) – Phase I City of Lake Charles, Louisiana The general scope of work for Phase 1 of this project is the reconstruction of 18th Street from Lake Street to the west side of the existing bridge over Small Bayou (approx. 800 feet). This includes the construction of a new 25-foot-wide reinforced concrete roadway with an integral curb and with a sidewalk on both sides. The installation of a new subsurface drainage system will also be included to drain this new roadway and better serve the impacted area. Lastly, this project will include the installation of a new, larger diameter water distribution system from Lake Street to Creole Street.
06/02/2026 07:45 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
RFP #2022-02, File ID #381-21
Request for Proposals for Professional Services - Select Services for Management of HUD Programs
11/02/2021 07:45 PM UTC
CP 3359
City of Lake Charles, Louisiana St. Louis Area Drainage Rehabilitation CP 3359 SCOPE OF WORK: Project scope consists of improvements to the subsurface storm drainage system in the area surrounding St. Louis High School. The project shall incorporate various rehabilitation methods such as removal & replacement, cured in place pipe (CIPP) lining, and sealing of catch basin walls to improve drainage flow and maintain the integrity of the property through which it serves. PROJECT LIMITS: Project limits are from Enterprise Blvd. to Kirkman St. in the East – West direction and from 7th St. to 12th St. in the North – South direction.
11/02/2021 07:45 PM UTC
Project # HL-66
City of Lake Charles, Louisiana LCPD Central Station Restoration- Project # HL-66 Scope of Repair Work Remove ex roof system down to deck. Ex roof has ex lightweight insulating concrete over concrete roof deck. Remove this lightweight insulating concrete down to roof deck. Install new roof drains, new exhaust fans, new roof insulation. New roof insulation to be min R-20 at all areas and tapered to slope at ¼:12 min. New roof system and flashing in its entirety to be designed for wind loads per ASCE 7-16 and as required for essential facility. Ex roof top antennae and communications system cabling to be removed and reinstalled. Ex roof system at parking canopy to be removed and new roofing and flashing installed. Remove existing roof mounted light fixtures and conduit at parapet flashing. Install new light and position to light up flagpole. Remove existing remnants of parking light pole light and bases. Install new light poles and concrete bases to comply with current wind loads per ASCE 7-16 and connect to existing circuits. Remove ex carpet and base and install new carpet and base at main lobby. Install new ceiling tiles in existing system. Install new ceiling tiles in men and women ceiling system. Remove ex ceiling system remnants and install new suspended ceiling system and one new light fixture connected to existing circuit. And other work as may be enumerated in project drawings.
11/02/2021 07:45 PM UTC
Capital Project Number CP3387
City of Lake Charles, Louisiana George H. West Water Treatment Plant Back-Up Power Improvements Capital Project Number CP3387 I. Scope of Services: Contractor shall complete all Work as specified or indicated in the Contract Documents for the George H. West Water Treatment Plant – Back-Up Power Improvements project. The Work includes, but is not limited to, the following: • Furnish and Install 2,300V Stand-by Generator with 5kV Automatic Transfer Switch • Intercept incoming Broad/Ann Street Entergy Feeds and Route into new ATS • Route new Incoming Feed from ATS to Existing Main ATS and Switchgear • Institute Operational Relays/Controls for Automatic Generator Operation • Interconnect Generator Control Panel with Owner’s SCADA and Low Voltage Supply
10/19/2021 07:45 PM UTC
Project #CP3303
City of Lake Charles, Louisiana Transit Storage Paving Project #CP3303 The project consists of the new construction of a 20,000 square foot of paving and 25,000 square of aggregate lay down area.
10/05/2021 07:45 PM UTC
CP 3336
City of Lake Charles, Louisiana Oak Park Lateral Drainage Improvements CP 3336 Project scope consists of improvements to subsurface storm drainage system along lateral streets adjoining Oak Park Boulevard. The project shall incorporate various rehabilitation methods such as removal & replacement and cured in place pipe (CIPP) lining as well as new storm drain inlets and subsurface piping to improve drainage flow and maintain the integrity of the property through which it serves. Project scope includes locations along Oak Park Boulevard and neighboring streets between 1st Avenue and 4th Avenue.
10/05/2021 07:45 PM UTC
Project No. 2021-710 Capital Project No. 3391
Project No. 2021-710 Capital Project No. 3391 West Oak Lane Drainage City of Lake Charles, LA The general scope of work for this project is the installation of new underground drainage on the north and south sides of West Oak Lane from Ryan Street west to Olive Street. This new system will extend south on the east side of Olive Street to an existing 48” storm drainage pipe located approximately 400 feet south of W. Oak Lane. This new underground system will consist of new drainage inlets and pipe ranging from 12” to 30” in diameter, as well as associated pavement work.
10/05/2021 07:45 PM UTC
RFP #2021-22, File ID #151-21
Request for Proposals for Automated Water Meter Infrastructure (AMI) System
08/17/2021 07:45 PM UTC
RFP #2021-24
Program Management of the Critical Drainage Improvement Program
08/17/2021 07:45 PM UTC
Project #HL-67 & HL-68
City of Lake Charles, Louisiana Communications Tower – 706 Enterprise Boulevard Project #HL-67 & HL-68 Base Bid: 1. Provide a new 350’ tall communications with associated site and foundation concrete drill shafts. 2. Attached antennae and cabling. 3. Commission tower to designed function & capacity. Alternate #1: 1. Extend tower height to 450’ as specified.
08/17/2021 07:45 PM UTC
151 - 160 of 400 Solicitations
1 2 12 13 14 16 18 19 20 39 40