Capital Project Number CP3414
CITY OF LAKE CHARLES, LOUISIANA
SOUTHWEST WATER TREATMENT PLANT
BACK-UP POWER IMPROVEMENTS
CAPITAL PROJECT NUMBER CP3414
HMGP GRANT NO. DR-4559-43
I. Scope of Services:
Contractor shall complete all Work as specified or indicated in the Contract Documents for the Southwest Water Treatment Plant – Back-Up Power Improvements project. The Work includes, but is not limited to, the following:
• Removal and Replacement of the Existing Stand-By Generator with Two (2) Parallel 600kW Stand-By Diesel Generators complete with 2,500A, 480VAC, 3PH Paralleling Switchgear.
• Removal and Disposal of the Existing Manual Transfer Switch and Replacement with 2,500A, 480VAC Delayed Transition Automatic Transfer Switch.
• Installation of Low Voltage Panelboard for Supply to Generator Appurtenances.
• Interconnections to Owner’s SCADA for Generator Monitoring.
• Miscellaneous Civil and Electrical Work as Required to Complete the Work.
| 11/18/2025 08:45 PM UTC |
| Number | Deadline |
|---|---|
|
HL-65
City of Lake Charles, Louisiana
Training Center Demo
HL-65
Remove existing building, foundation, paving, antennae and all related components in their entirety. Project includes asbestos abatement of hazardous material in building.
| 11/16/2021 08:45 PM UTC |
|
HL-02, 06, 43, 135, 136
City of Lake Charles, Louisiana
Hurricane Laura storm Repairs – Multiple Ball Park Repairs
HL - 02, 06, 43, 135, 136
1. The Work includes repairs to multiple existing park facilities including ball fields, concession
stands, restrooms, bleachers and covers.
a. Repair existing bleacher cover structures. Replace damaged bleachers.
b. Chain-link fencing repair/replacement.
c. Repairs to lighting and mechanical systems.
d. Repairs to existing buildings including roofing, fascia, soffit, siding, framing, sheathing,
flooring, gypsum board, painting etc.
| 11/02/2021 07:45 PM UTC |
|
RFP #2022-02, File ID #381-21
Request for Proposals for Professional Services - Select Services for Management of HUD Programs
| 11/02/2021 07:45 PM UTC |
|
CP 3359
City of Lake Charles, Louisiana
St. Louis Area Drainage Rehabilitation
CP 3359
SCOPE OF WORK:
Project scope consists of improvements to the subsurface storm drainage system in the area surrounding St. Louis High School. The project shall incorporate various rehabilitation methods such as removal & replacement, cured in place pipe (CIPP) lining, and sealing of catch basin walls to improve drainage flow and maintain the integrity of the property through which it serves.
PROJECT LIMITS:
Project limits are from Enterprise Blvd. to Kirkman St. in the East – West direction and from 7th St. to 12th St. in the North – South direction.
| 11/02/2021 07:45 PM UTC |
|
Project # HL-66
City of Lake Charles, Louisiana
LCPD Central Station Restoration-
Project # HL-66
Scope of Repair Work
Remove ex roof system down to deck. Ex roof has ex lightweight insulating concrete over concrete roof deck. Remove this lightweight insulating concrete down to roof deck. Install new roof drains, new exhaust fans, new roof insulation. New roof insulation to be min R-20 at all areas and tapered to slope at ¼:12 min. New roof system and flashing in its entirety to be designed for wind loads per ASCE 7-16 and as required for essential facility. Ex roof top antennae and communications system cabling to be removed and reinstalled. Ex roof system at parking canopy to be removed and new roofing and flashing installed.
Remove existing roof mounted light fixtures and conduit at parapet flashing. Install new light and position to light up flagpole. Remove existing remnants of parking light pole light and bases. Install new light poles and concrete bases to comply with current wind loads per ASCE 7-16 and connect to existing circuits.
Remove ex carpet and base and install new carpet and base at main lobby. Install new ceiling tiles in existing system. Install new ceiling tiles in men and women ceiling system. Remove ex ceiling system remnants and install new suspended ceiling system and one new light fixture connected to existing circuit.
And other work as may be enumerated in project drawings.
| 11/02/2021 07:45 PM UTC |
|
Capital Project Number CP3387
City of Lake Charles, Louisiana
George H. West Water Treatment Plant
Back-Up Power Improvements
Capital Project Number CP3387
I. Scope of Services:
Contractor shall complete all Work as specified or indicated in the Contract Documents for the George H. West Water Treatment Plant – Back-Up Power Improvements project. The Work includes, but is not limited to, the following:
• Furnish and Install 2,300V Stand-by Generator with 5kV Automatic Transfer Switch
• Intercept incoming Broad/Ann Street Entergy Feeds and Route into new ATS
• Route new Incoming Feed from ATS to Existing Main ATS and Switchgear
• Institute Operational Relays/Controls for Automatic Generator Operation
• Interconnect Generator Control Panel with Owner’s SCADA and Low Voltage Supply
| 10/19/2021 07:45 PM UTC |
|
Project #CP3303
City of Lake Charles, Louisiana
Transit Storage Paving
Project #CP3303
The project consists of the new construction of a 20,000 square foot of paving and 25,000 square of aggregate lay down area.
| 10/05/2021 07:45 PM UTC |
|
CP 3336
City of Lake Charles, Louisiana
Oak Park Lateral Drainage Improvements
CP 3336
Project scope consists of improvements to subsurface storm drainage system along lateral streets adjoining Oak Park Boulevard. The project shall incorporate various rehabilitation methods such as removal & replacement and cured in place pipe (CIPP) lining as well as new storm drain inlets and subsurface piping to improve drainage flow and maintain the integrity of the property through which it serves.
Project scope includes locations along Oak Park Boulevard and neighboring streets between 1st Avenue and 4th Avenue.
| 10/05/2021 07:45 PM UTC |
|
Project No. 2021-710 Capital Project No. 3391
Project No. 2021-710
Capital Project No. 3391
West Oak Lane Drainage
City of Lake Charles, LA
The general scope of work for this project is the installation of new underground drainage on the north and south sides of West Oak Lane from Ryan Street west to Olive Street. This new system will extend south on the east side of Olive Street to an existing 48” storm drainage pipe located approximately 400 feet south of W. Oak Lane. This new underground system will consist of new drainage inlets and pipe ranging from 12” to 30” in diameter, as well as associated pavement work.
| 10/05/2021 07:45 PM UTC |
|
RFP #2021-22, File ID #151-21
Request for Proposals for Automated Water Meter Infrastructure (AMI) System
| 08/17/2021 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.