General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP 3492
City of Lake Charles, Louisiana Mallard Golf Driving Range CP 3492 1. Four covered hitting bays totaling 1,333 SF with integrated hitting surfaces, rough ins for ball tracing technology by owner, integrated hitting surfaces, dining area behind each station, heating, and architecture matching the existing clubhouse. 2. Bar area totaling 1,178 SF with fold-up doors on all sides, serving bar, and seating area, architecture consistent with existing clubhouse. 3. Paved hitting area at the driving range with 5’ x 5’ hitting mats. 4. Two additional charging stations at existing cart facility serving 12 golf carts and a paved night hitting area with durable hitting mats.
09/15/2026 07:45 PM UTC
CP 3537
City of Lake Charles, Louisiana Goosport Recreation Splash Pad CP 3537 Remove the existing splash pad and build a new splash pad and putting green and other work as noted in the project plans and project manual.
09/15/2026 07:45 PM UTC
Capital Project No. CP3051
City of Lake Charles, Louisiana 2025 Citywide Striping Package Lake Charles, Louisiana City of Lake Charles Capital Project No. CP3051 LEI Project No. 26-006 The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract. The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles: 1. Southpark Road (McNeese Street to Smith Road) 2. 6th Avenue (12th Street to Broad Street) 3. Hodges Street (Alamo Street to Belden Street) 4. Bilbo Street (S. Railroad Avenue to Clarence Street) 5. Lake Street (Shell Beach Drive to Prien Lake Road) 6. Opelousas Street (Enterprise Boulevard to Highway 171) 7. Fitzenreiter Road (Riverside Park to Highway 171) 8. North Goos Boulevard (Knapp Street to Opelousas Street) 9. Medora Street (Simmons Street to Highway 171) 10. Shattuck Street (Broad Street to Moeling Street) 11. 18th Street (Lake Street to Ryan Street) 12. Enterprise Parkway (Interstate 10 to Katherine Street) 13. W. Prien Lake Road (Cove Lane Roundabout to Nelson Road) 14. Contraband Parkway (Lauberge Boulevard to Prien Lake Road) 15. Enterprise Boulevard (12th Street to Prien Lake Road) 16. Broad Street (Lakeshore Drive to Enterprise Boulevard) 17. Moeling Street (Enterprise Boulevard to Highway 171) 18. 6th Street (4th Avenue to Highway 14) 19. Mill Street (Lakeshore Drive to Highway 14) 20. Common Street (McNeese Street to Prien Lake Road) 21. Lake Street (Prien Lake Road to McNeese Street) 22. Kirkman Street (Jackson Street to McNeese Street) 23. Alamo Street (Ryan Street to Enterprise Boulevard) 24. Oak Park Boulevard (Enterprise Boulevard to Highway 14) 25. 12th Street (Highway 14 to Hodges Street) 26. Sallier Street (Lake Street to Hodges Street) 27. Ernest Street (Sale Road to Sallier Street) 28. Jefferson Drive (University Drive to University Drive) 29. Henderson Bayou Road (Locke Lane to W. Prien Lake Road) 30. General Doolittle Avenue (Highway 14 to General Twining Street) 31. Alvin Street (Sallier Street to Shell Beach Drive) 32. 18th Street (Enterprise Boulevard to Highway 14) 33. Bord du Lac Drive (Lakeshore Drive to N. Lakeshore Drive) 34. Russell Street (12th Street to Hillcrest Drive) 35. Hillcrest Drive (Highway 14 to Russell Street) 36. N. Prater Street (Knapp Street to Fitzenreiter Road) 37. Pear Street (Knapp Street to Fitzenreiter Road) The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
09/15/2026 07:45 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
Various City Park Repairs
City of Lake Charles, Louisiana Hurricane Laura Storm Repairs – Various City Park Repairs HL – 05, 12, 20, 120, 139, 140, 142, 143, 144, 145, 146 01, 03, 07, 08, 09, 13, 18, 137 1. The Work includes repairs to multiple existing park facilities: a. Repair existing bleacher cover structures. b. Replace damaged bleachers. a. Chain-link fencing repair/replacement. b. Repairs to lighting and mechanical systems. c. Repairs to existing buildings including roofing, fascia, soffit, siding, framing, sheathing, flooring, gypsum board, painting etc. d. Replacement of open air pavilion. e. Repairs to wood fencing. f. Repair/replace exterior and field lighting. g. Conversion of tennis court to basketball court. h. Repairs to damage site components such as benches, picnic tables, trash bins etc.
04/19/2022 07:45 PM UTC
Capital Project Number CP3415
CITY OF LAKE CHARLES, LOUISIANA MCNEESE WATER TREATMENT PLANT BACK-UP POWER IMPROVEMENTS CAPITAL PROJECT NUMBER CP3415 Contractor shall complete all Work as specified or indicated in the Contract Documents for McNeese Water Treatment Plant – Back-Up Power Improvements project. The Work includes, but is not limited to, the following: • Furnish and Install 480V Stand-by Generator with 5kV Automatic Transfer Switch • Intercept incoming Entergy Feed and Replace Miscellaneous Electrical Panels • Interconnect Generator Control Panel with Owner’s SCADA and Low Voltage Supply
04/19/2022 07:45 PM UTC
Capital Project Number CP2944
City of Lake Charles, Louisiana GH West Transmission Main Extension Capital Project Number CP2944 The City of Lake Charles desires to improve reliability of its transmission mains leaving the George H. West WTP through the installation of a new main leaving the facility. The installation of this new transmission main will allow the City to systematically approach the future replacement of other, existing transmission mains that were installed in the 1930’s. This Work will include but is not limited to the following: 1. Installation of approximately 1,790 ft. of 24-inch ductile iron transmission from the George West WTP to the proposed distribution system connection points. The proposed transmission main extension would connect the existing 24-inch stub from the 2007 plant construction to the existing 16-inch water mains that run along the north side Jackson Street and west side of N Bilbo Street. 2. Installation of approximately 850 ft of electrical duct back, conduit, and electrical power/control wire from the George West WTP to the existing pad mounted starter cabinet receiving manhole. The removal of existing overhead control wiring.
04/19/2022 07:45 PM UTC
Capital Project Number CP3413
CITY OF LAKE CHARLES, LOUISIANA CENTER EAST WATER TREATMENT PLANT BACK-UP POWER IMPROVEMENTS CAPITAL PROJECT NUMBER CP3413 Contractor shall complete all Work as specified or indicated in the Contract Documents for the Center East Water Treatment Plant – Back-Up Power Improvements project. The Work includes, but is not limited to, the following: • Remove and Replace Stand-by Generator and Interconnect with Transfer Switch • Intercept incoming Entergy Feed and Replace Miscellaneous Electrical Panels • Interconnect Generator Control Panel with Owner’s SCADA and Low Voltage Supply
04/05/2022 07:45 PM UTC
Capital Project Number HL-0082
CITY OF LAKE CHARLES, LOUISIANA SALE ROAD STREET LIFT STATION REPAIR CAPITAL PROJECT NUMBER HL-0082 Design and implementation of structural and electrical repairs, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA), to reinstate the damaged systems to pre-storm conditions and to upgrade these existing systems to coincide with newly applicable codes, standards, and regulations as imposed by governmental bodies with the appropriate jurisdictional authority. This Work shall include the following: BASE BID: (1) Demolition and removal of existing lift station building, including removal and disposal of existing electrical and HVAC equipment. (2) Furnishing and install new electrical building equipment with new electrical equipment, controls, HVAC system, conduits, etc. (3) Furnish and install new 6-inch reinforced concrete pad, 2-inch limestone driveway, 6-ft green slatted chain-link privacy fencing, etc. ALTERNATE NO.1 (1) Furnish and Install New Stand by Generator with Automatic Transfer Switch and Generator Pad and bollards.
04/05/2022 07:45 PM UTC
2022-20
Request for Proposals - Cleaning and Evaluation of Storm Sewers
04/05/2022 07:45 PM UTC
CP 3338
City of Lake Charles, Louisiana 2019 Sidewalk Construction CP 3338 The installation of a six-foot (6’) sidewalk along the west side of nelson road between Evergreen at River Oaks Apartments driveway and W. Mcneese Street, the installation of a five-foot (5’) sidewalk on the west side of Canal Street between W. Mcneese Street and W. Sale Road, the installation of a five-foot (5’) sidewalk along the south side of Madeline Street between Common Street and Kirkman Street, the installation of a four- to five-foot (4’-5’) sidewalk along the south side of Illinois street between Brentwood Avenue and E. Walton Street, and the removal and replacement of existing concrete curbing and a five-foot (5’) sidewalk along the east and west sides of Bilbo Street between Clarence Street and Iris Street. It also includes the installation and adjustment of subsurface drainage systems along Nelson Road and Canal Street, the removal and installation of driveways impacted by sidewalk placement, and the installation of a retaining wall along the sidewalk located on the east side of Bilbo Street.
03/15/2022 07:45 PM UTC
Project No. 2021-711 Capital Project No. 3372
Project No. 2021-711 Capital Project No. 3372 Louisiana Avenue – South of McNeese – Drainage Improvements City of Lake Charles, LA The general scope of work for Project 2021-711, Capital Project No. 3372 is the installation of new underground drainage system to better serve Louisiana Avenue south of McNeese Street. This new system will tie into McNeese Street, run south along the east property line of F.K. White Middle School, and then turn east along the south property line of the Entergy Substation. The system will cross to the east side of Louisiana Avenue at this location. Additionally, this underground system will extend south in the existing west roadside ditch of Louisiana Avenue approximately 650 feet. This new underground system will consist of new drainage inlets and pipe ranging from 15” to 48” in diameter, as well the associated pavement work.
03/15/2022 07:45 PM UTC
CP 3339
City of Lake Charles, Louisiana Lakefront Parking Garage – Phase II CP 3339 1. The Work includes repairs to existing parking garage structure. a. Demolition and removal CMU walls and metal wall panels. b. Replacement of existing electrical equipment, new lighting & specialty lighting. c. New elevator core and storefront systems for elevator lobbies at each level. d. New curtain wall system. e. New exterior metal stair units. f. Repairs to existing buildings including roofing, fascia, soffit, pre-finished metal siding, framing, sheathing, flooring, re-painting etc. g. New retaining wall foundations and waterproofing. h. Fascade replacement of pre-finished metal wall panels. i. Re-stripping of parking area & misc. painting.
02/01/2022 08:45 PM UTC
HL-69
City of Lake Charles, Louisiana Public Works Admin Building Demo HL-69 Remove existing 2-story building, foundation, paving, and all related components in their entirety. Project includes asbestos abatement of hazardous material in building.
02/01/2022 08:45 PM UTC
131 - 140 of 405 Solicitations