General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Capital Project No. CP3051
City of Lake Charles, Louisiana 2025 Citywide Striping Package Lake Charles, Louisiana City of Lake Charles Capital Project No. CP3051 LEI Project No. 26-006 The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract. The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles: 1. Southpark Road (McNeese Street to Smith Road) 2. 6th Avenue (12th Street to Broad Street) 3. Hodges Street (Alamo Street to Belden Street) 4. Bilbo Street (S. Railroad Avenue to Clarence Street) 5. Lake Street (Shell Beach Drive to Prien Lake Road) 6. Opelousas Street (Enterprise Boulevard to Highway 171) 7. Fitzenreiter Road (Riverside Park to Highway 171) 8. North Goos Boulevard (Knapp Street to Opelousas Street) 9. Medora Street (Simmons Street to Highway 171) 10. Shattuck Street (Broad Street to Moeling Street) 11. 18th Street (Lake Street to Ryan Street) 12. Enterprise Parkway (Interstate 10 to Katherine Street) 13. W. Prien Lake Road (Cove Lane Roundabout to Nelson Road) 14. Contraband Parkway (Lauberge Boulevard to Prien Lake Road) 15. Enterprise Boulevard (12th Street to Prien Lake Road) 16. Broad Street (Lakeshore Drive to Enterprise Boulevard) 17. Moeling Street (Enterprise Boulevard to Highway 171) 18. 6th Street (4th Avenue to Highway 14) 19. Mill Street (Lakeshore Drive to Highway 14) 20. Common Street (McNeese Street to Prien Lake Road) 21. Lake Street (Prien Lake Road to McNeese Street) 22. Kirkman Street (Jackson Street to McNeese Street) 23. Alamo Street (Ryan Street to Enterprise Boulevard) 24. Oak Park Boulevard (Enterprise Boulevard to Highway 14) 25. 12th Street (Highway 14 to Hodges Street) 26. Sallier Street (Lake Street to Hodges Street) 27. Ernest Street (Sale Road to Sallier Street) 28. Jefferson Drive (University Drive to University Drive) 29. Henderson Bayou Road (Locke Lane to W. Prien Lake Road) 30. General Doolittle Avenue (Highway 14 to General Twining Street) 31. Alvin Street (Sallier Street to Shell Beach Drive) 32. 18th Street (Enterprise Boulevard to Highway 14) 33. Bord du Lac Drive (Lakeshore Drive to N. Lakeshore Drive) 34. Russell Street (12th Street to Hillcrest Drive) 35. Hillcrest Drive (Highway 14 to Russell Street) 36. N. Prater Street (Knapp Street to Fitzenreiter Road) 37. Pear Street (Knapp Street to Fitzenreiter Road) The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
11/17/2026 08:45 PM UTC
2027-04
Maintenance of City of Lake Charles Customer-Owned Lighting
11/17/2026 08:45 PM UTC
Capital Project Number CP3453
CITY OF LAKE CHARLES, LOUISIANA HAZARD MITIGATION GRANT PROGRAM (HMGP) LIFT STATION BACK-UP POWER IMPROVEMENTS CAPITAL PROJECT NUMBER CP3453 HMGP PROJECT NUMBER DR-4559-0043 I. Scope of Services: Contractor shall complete Work as specified and indicated in the Contract Documents for Lift Station Back-Up Power Improvements (Capital Project No. CP3453). This Work includes, but is not limited to, the following: • Install of Automatic Transfer Switches & Stand-By Diesel Generators at Lift Stations. • Miscellaneous Work including civil, mechanical, structural, & electrical components required to fully execute the Work.
11/17/2026 08:45 PM UTC
Capital Project No. 3508
City of Lake Charles, Louisiana Project No. 2024-745 Capital Project No. 3508 Riverside Park Shoreline Protection – Phase One The general scope of work for this project includes the restoration and protection of approximately 250 linear feet of shoreline near the entrance of Riverside Park. This restorative work includes placement of stone revetment to rebuild the riverbank, repair/replacement of existing decorative black fence compromised from erosion, and installation of approximately 100 linear feet of steel sheet pile for bank protection near the gate entrance.
11/17/2026 08:45 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
Project # HL-66
City of Lake Charles, Louisiana LCPD Central Station Restoration- Project # HL-66 Scope of Repair Work Remove ex roof system down to deck. Ex roof has ex lightweight insulating concrete over concrete roof deck. Remove this lightweight insulating concrete down to roof deck. Install new roof drains, new exhaust fans, new roof insulation. New roof insulation to be min R-20 at all areas and tapered to slope at ¼:12 min. New roof system and flashing in its entirety to be designed for wind loads per ASCE 7-16 and as required for essential facility. Ex roof top antennae and communications system cabling to be removed and reinstalled. Ex roof system at parking canopy to be removed and new roofing and flashing installed. Remove existing roof mounted light fixtures and conduit at parapet flashing. Install new light and position to light up flagpole. Remove existing remnants of parking light pole light and bases. Install new light poles and concrete bases to comply with current wind loads per ASCE 7-16 and connect to existing circuits. Remove ex carpet and base and install new carpet and base at main lobby. Install new ceiling tiles in existing system. Install new ceiling tiles in men and women ceiling system. Remove ex ceiling system remnants and install new suspended ceiling system and one new light fixture connected to existing circuit. And other work as may be enumerated in project drawings.
11/02/2021 07:45 PM UTC
Capital Project Number CP3387
City of Lake Charles, Louisiana George H. West Water Treatment Plant Back-Up Power Improvements Capital Project Number CP3387 I. Scope of Services: Contractor shall complete all Work as specified or indicated in the Contract Documents for the George H. West Water Treatment Plant – Back-Up Power Improvements project. The Work includes, but is not limited to, the following: • Furnish and Install 2,300V Stand-by Generator with 5kV Automatic Transfer Switch • Intercept incoming Broad/Ann Street Entergy Feeds and Route into new ATS • Route new Incoming Feed from ATS to Existing Main ATS and Switchgear • Institute Operational Relays/Controls for Automatic Generator Operation • Interconnect Generator Control Panel with Owner’s SCADA and Low Voltage Supply
10/19/2021 07:45 PM UTC
Project #CP3303
City of Lake Charles, Louisiana Transit Storage Paving Project #CP3303 The project consists of the new construction of a 20,000 square foot of paving and 25,000 square of aggregate lay down area.
10/05/2021 07:45 PM UTC
CP 3336
City of Lake Charles, Louisiana Oak Park Lateral Drainage Improvements CP 3336 Project scope consists of improvements to subsurface storm drainage system along lateral streets adjoining Oak Park Boulevard. The project shall incorporate various rehabilitation methods such as removal & replacement and cured in place pipe (CIPP) lining as well as new storm drain inlets and subsurface piping to improve drainage flow and maintain the integrity of the property through which it serves. Project scope includes locations along Oak Park Boulevard and neighboring streets between 1st Avenue and 4th Avenue.
10/05/2021 07:45 PM UTC
Project No. 2021-710 Capital Project No. 3391
Project No. 2021-710 Capital Project No. 3391 West Oak Lane Drainage City of Lake Charles, LA The general scope of work for this project is the installation of new underground drainage on the north and south sides of West Oak Lane from Ryan Street west to Olive Street. This new system will extend south on the east side of Olive Street to an existing 48” storm drainage pipe located approximately 400 feet south of W. Oak Lane. This new underground system will consist of new drainage inlets and pipe ranging from 12” to 30” in diameter, as well as associated pavement work.
10/05/2021 07:45 PM UTC
RFP #2021-22, File ID #151-21
Request for Proposals for Automated Water Meter Infrastructure (AMI) System
08/17/2021 07:45 PM UTC
RFP #2021-24
Program Management of the Critical Drainage Improvement Program
08/17/2021 07:45 PM UTC
Project #HL-67 & HL-68
City of Lake Charles, Louisiana Communications Tower – 706 Enterprise Boulevard Project #HL-67 & HL-68 Base Bid: 1. Provide a new 350’ tall communications with associated site and foundation concrete drill shafts. 2. Attached antennae and cabling. 3. Commission tower to designed function & capacity. Alternate #1: 1. Extend tower height to 450’ as specified.
08/17/2021 07:45 PM UTC
Project No. 2018-681 Capital Project No. 3279
Project No. 2018-681 Capital Project No. 3279 6th Avenue Reconstruction 3rd Street to 6th Street City of Lake Charles, LA The general scope of work for Project No. 2018-681, 6th Avenue Reconstruction from 3rd Street to 6th Street includes the following: a. Reconstruction of roadways b. Storm drainage improvements c. New water distribution system d. New sidewalks & ADA compliant sidewalk ramps
08/17/2021 07:45 PM UTC
PROJECT NUMBER HL-SOV-95/96/98/99/101-108/110/112-114
CITY OF LAKE CHARLES, LOUISIANA HURRICANE LAURA (DR-4559-LA) DISASTER RECOVERY PROGRAM WATER TREATMENT PLANTS – CHEMICAL FEED SYSTEM REPAIRS PROJECT NUMBER HL-SOV-95/96/98/99/101-108/110/112-114 The Contractor shall furnish all labor, materials, equipment, tools, services, supervision, and incidentals required to complete the Work as shown on the Plans and specified herein. This Work includes, but is not necessarily limited to, the following: 1. Chlorine Feed System (Insurance SOV #101) @ Center East WTP (3207 Center Street) a. Remove and Replace Exterior Door w/Panic Hardware b. Remove and Replace Security Chains for Chlorine Cover 2. Fluoride Feed System (Insurance SOV #102) @ Center East WTP (3207 Center Street) a. Removal and Disposal of Diluted Chemical b. Remove and Replace Bulk Storage Tank 3. Phosphate Feed System (Insurance SOV #104) @ Center East WTP (3207 Center Street) a. Removal and Disposal of Diluted Chemical b. Remove and Replace Bulk Storage Tank 4. Caustic Feed System (Insurance SOV #108) @ Center East WTP (3207 Center Street) a. Removal and Disposal of Diluted Chemical b. Furnish and Install New Bulk Fill Line (2-Inch) c. Remove and Replace Bulk Storage Tank 5. Caustic Feed System (Insurance SOV #103) @ Center West WTP (3208 Center Street) a. Removal and Disposal of Diluted Chemical b. Furnish and Install New Bulk Fill Line (2-Inch) c. Furnish and Install Day Tank w/Transfer Pump d. Remove and Replace Bulk Storage Tank 6. Phosphate Feed System (Insurance SOV #105) @ Center West WTP (3208 Center Street) a. Remove and Replace Fiberglass Enclosure b. Re-termination of Damaged Electrical/Process Piping c. Furnish and Install Duplex Metering Pump Skid d. Furnish and Install Day Tank w/Transfer Pump e. Remove and Replace Bulk Storage Tank 7. Fluoride Feed System (Insurance SOV #106) @ Center West WTP (3208 Center Street) a. Removal and Disposal of Diluted Chemical b. Remove and Replace Bulk Storage Tank 8. Caustic Feed System (Insurance SOV #95) @ Chennault WTP (1501 W. Main Street) a. Furnish and Install Fiberglass Enclosure b. Furnish and Install Electrical Wiring/Conduit c. Furnish and Install Process Piping d. Furnish and Install New Bulk Fill Line (2-Inch) e. Furnish and Install Duplex Metering Pump Skid f. Furnish and Install Day Tank w/Transfer Pump g. Remove and Replace Bulk Storage Tank 9. Chlorine Feed System (Insurance SOV #96) @ Chennault WTP (1501 W. Main Street) a. Remove and Replace Exterior Door w/Panic Hardware b. Remove and Replace Exterior Single-Pane Windows c. Remove and Replace Security Chains for Chlorine Cover 10. Fluoride Feed System (Insurance SOV #98) @ Chennault WTP (1501 W. Main Street) a. Furnish and Install Electrical Wiring/Conduit b. Furnish and Install New Bulk Fill Line (2-Inch) c. Remove and Replace Bulk Storage Tank 11. Phosphate Feed System (Insurance SOV #99) @ Chennault WTP (1501 W. Main Street) a. Remove and Replace Fiberglass Enclosure b. Furnish and Install Electrical Wiring/Conduit c. Furnish and Install New Bulk Fill Line (2-Inch) d. Furnish and Install Duplex Metering Pump Skid e. Furnish and Install Day Tank w/Transfer Pump f. Remove and Replace Bulk Storage Tank 12. Caustic Feed System (Insurance SOV #110) @ McNeese WTP (617 E. McNeese Street) a. Furnish and Install New Bulk Fill Line (2-Inch) b. Furnish and Install Day Tank w/Transfer Pump c. Remove and Replace Bulk Storage Tank 13. Chlorine Feed System (Insurance SOV #112) @ McNeese WTP (617 E. McNeese Street) a. Remove and Replace Fiberglass Enclosure b. Remove and Replace Security Chains for Chlorine Cover 14. Fluoride Feed System (Insurance SOV #113) @ McNeese WTP (617 E. McNeese Street) a. Remove and Replace Fiberglass Enclosure b. Re-termination of Damaged Electrical/Process Piping c. Furnish and Install Duplex Metering Pump Skid d. Furnish and Install Day Tank w/Transfer Pump e. Remove and Replace Bulk Storage Tank 15. Phosphate Feed System (Insurance SOV #114) @ McNeese WTP (617 E. McNeese Street) a. Remove and Replace Fiberglass Enclosure b. Re-termination of Damaged Electrical/Process Piping c. Furnish and Install Duplex Metering Pump Skid d. Furnish and Install Day Tank w/Transfer Pump e. Remove and Replace Bulk Storage Tank
08/17/2021 07:45 PM UTC
161 - 170 of 408 Solicitations
1 2 … 13 14 15 17 19 20 21 … 40 41