General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Capital Project Number CP3414
CITY OF LAKE CHARLES, LOUISIANA SOUTHWEST WATER TREATMENT PLANT BACK-UP POWER IMPROVEMENTS CAPITAL PROJECT NUMBER CP3414 HMGP GRANT NO. DR-4559-43 I. Scope of Services: Contractor shall complete all Work as specified or indicated in the Contract Documents for the Southwest Water Treatment Plant – Back-Up Power Improvements project. The Work includes, but is not limited to, the following: • Removal and Replacement of the Existing Stand-By Generator with Two (2) Parallel 600kW Stand-By Diesel Generators complete with 2,500A, 480VAC, 3PH Paralleling Switchgear. • Removal and Disposal of the Existing Manual Transfer Switch and Replacement with 2,500A, 480VAC Delayed Transition Automatic Transfer Switch. • Installation of Low Voltage Panelboard for Supply to Generator Appurtenances. • Interconnections to Owner’s SCADA for Generator Monitoring. • Miscellaneous Civil and Electrical Work as Required to Complete the Work.
11/18/2025 08:45 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
RFP #2021-24
Program Management of the Critical Drainage Improvement Program
08/17/2021 07:45 PM UTC
Project #HL-67 & HL-68
City of Lake Charles, Louisiana Communications Tower – 706 Enterprise Boulevard Project #HL-67 & HL-68 Base Bid: 1. Provide a new 350’ tall communications with associated site and foundation concrete drill shafts. 2. Attached antennae and cabling. 3. Commission tower to designed function & capacity. Alternate #1: 1. Extend tower height to 450’ as specified.
08/17/2021 07:45 PM UTC
Project No. 2018-681 Capital Project No. 3279
Project No. 2018-681 Capital Project No. 3279 6th Avenue Reconstruction 3rd Street to 6th Street City of Lake Charles, LA The general scope of work for Project No. 2018-681, 6th Avenue Reconstruction from 3rd Street to 6th Street includes the following: a. Reconstruction of roadways b. Storm drainage improvements c. New water distribution system d. New sidewalks & ADA compliant sidewalk ramps
08/17/2021 07:45 PM UTC
PROJECT NUMBER HL-SOV-95/96/98/99/101-108/110/112-114
CITY OF LAKE CHARLES, LOUISIANA HURRICANE LAURA (DR-4559-LA) DISASTER RECOVERY PROGRAM WATER TREATMENT PLANTS – CHEMICAL FEED SYSTEM REPAIRS PROJECT NUMBER HL-SOV-95/96/98/99/101-108/110/112-114 The Contractor shall furnish all labor, materials, equipment, tools, services, supervision, and incidentals required to complete the Work as shown on the Plans and specified herein. This Work includes, but is not necessarily limited to, the following: 1. Chlorine Feed System (Insurance SOV #101) @ Center East WTP (3207 Center Street) a. Remove and Replace Exterior Door w/Panic Hardware b. Remove and Replace Security Chains for Chlorine Cover 2. Fluoride Feed System (Insurance SOV #102) @ Center East WTP (3207 Center Street) a. Removal and Disposal of Diluted Chemical b. Remove and Replace Bulk Storage Tank 3. Phosphate Feed System (Insurance SOV #104) @ Center East WTP (3207 Center Street) a. Removal and Disposal of Diluted Chemical b. Remove and Replace Bulk Storage Tank 4. Caustic Feed System (Insurance SOV #108) @ Center East WTP (3207 Center Street) a. Removal and Disposal of Diluted Chemical b. Furnish and Install New Bulk Fill Line (2-Inch) c. Remove and Replace Bulk Storage Tank 5. Caustic Feed System (Insurance SOV #103) @ Center West WTP (3208 Center Street) a. Removal and Disposal of Diluted Chemical b. Furnish and Install New Bulk Fill Line (2-Inch) c. Furnish and Install Day Tank w/Transfer Pump d. Remove and Replace Bulk Storage Tank 6. Phosphate Feed System (Insurance SOV #105) @ Center West WTP (3208 Center Street) a. Remove and Replace Fiberglass Enclosure b. Re-termination of Damaged Electrical/Process Piping c. Furnish and Install Duplex Metering Pump Skid d. Furnish and Install Day Tank w/Transfer Pump e. Remove and Replace Bulk Storage Tank 7. Fluoride Feed System (Insurance SOV #106) @ Center West WTP (3208 Center Street) a. Removal and Disposal of Diluted Chemical b. Remove and Replace Bulk Storage Tank 8. Caustic Feed System (Insurance SOV #95) @ Chennault WTP (1501 W. Main Street) a. Furnish and Install Fiberglass Enclosure b. Furnish and Install Electrical Wiring/Conduit c. Furnish and Install Process Piping d. Furnish and Install New Bulk Fill Line (2-Inch) e. Furnish and Install Duplex Metering Pump Skid f. Furnish and Install Day Tank w/Transfer Pump g. Remove and Replace Bulk Storage Tank 9. Chlorine Feed System (Insurance SOV #96) @ Chennault WTP (1501 W. Main Street) a. Remove and Replace Exterior Door w/Panic Hardware b. Remove and Replace Exterior Single-Pane Windows c. Remove and Replace Security Chains for Chlorine Cover 10. Fluoride Feed System (Insurance SOV #98) @ Chennault WTP (1501 W. Main Street) a. Furnish and Install Electrical Wiring/Conduit b. Furnish and Install New Bulk Fill Line (2-Inch) c. Remove and Replace Bulk Storage Tank 11. Phosphate Feed System (Insurance SOV #99) @ Chennault WTP (1501 W. Main Street) a. Remove and Replace Fiberglass Enclosure b. Furnish and Install Electrical Wiring/Conduit c. Furnish and Install New Bulk Fill Line (2-Inch) d. Furnish and Install Duplex Metering Pump Skid e. Furnish and Install Day Tank w/Transfer Pump f. Remove and Replace Bulk Storage Tank 12. Caustic Feed System (Insurance SOV #110) @ McNeese WTP (617 E. McNeese Street) a. Furnish and Install New Bulk Fill Line (2-Inch) b. Furnish and Install Day Tank w/Transfer Pump c. Remove and Replace Bulk Storage Tank 13. Chlorine Feed System (Insurance SOV #112) @ McNeese WTP (617 E. McNeese Street) a. Remove and Replace Fiberglass Enclosure b. Remove and Replace Security Chains for Chlorine Cover 14. Fluoride Feed System (Insurance SOV #113) @ McNeese WTP (617 E. McNeese Street) a. Remove and Replace Fiberglass Enclosure b. Re-termination of Damaged Electrical/Process Piping c. Furnish and Install Duplex Metering Pump Skid d. Furnish and Install Day Tank w/Transfer Pump e. Remove and Replace Bulk Storage Tank 15. Phosphate Feed System (Insurance SOV #114) @ McNeese WTP (617 E. McNeese Street) a. Remove and Replace Fiberglass Enclosure b. Re-termination of Damaged Electrical/Process Piping c. Furnish and Install Duplex Metering Pump Skid d. Furnish and Install Day Tank w/Transfer Pump e. Remove and Replace Bulk Storage Tank
08/17/2021 07:45 PM UTC
Project No. 2019-697 Capital Project No. 3288
Project No. 2019-697 Capital Project No. 3288 Holly Hill Road Sewer Line Rehabilitation Phase 3 City of Lake Charles, LA The general scope of work for Project No. 2019-697, Capital Project No. 3288, includes the rehabilitation of approximately 2500 feet of 48-inch sewer main by cured-in-place (CIPP) lining including sewer manholes on Holly Hill Road from Wickersham Drive/Moss Loop north to Chrysler Street. Sewer manhole rehabilitation to continue northerly to Prien Lake Road Roundabout.
08/03/2021 07:45 PM UTC
Project Number HL-SOV-93
CITY OF LAKE CHARLES, LOUISIANA HURRICANE LAURA (DR-4559-LA) DISASTER RECOVERY PROGRAM GEORGE H. WEST WATER TREATMENT PLANT WELLS G-8 & G-9 STARTER REPLACEMENTS PROJECT NUMBER HL-SOV-93 I. Background: Gusting winds, debris impacts, and heavy rain, associated with Hurricane Laura, incurred damage to the motor starters/cabinets on wells G-8 and G-9 which are located at the N. Ryan and Railroad Ave well site associated with the Water Treatment Plant. The damage to the starters is to the point where functions of the systems no longer provide reliable operation and are in need of replacement. This project will serve to replace the starters, controls, and cabinets associated with Wells G-8 and G-9 and return the water system to its pre-storm operation. This project is necessary to ensure the City of Lake Charles is able to adequately provide reliable service to their consumers. II. Scope of Work: Implementation of electrical improvements, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA), to reinstate damaged well starters to their pre-storm condition, as well as, improve equipment installation in conformance with applicable codes and standards and improve the ability of the Owner to service and maintain the proposed equipment. This Work shall include: • Removal and Disposal of Existing, Defective Starter Cabinets • Installation of Pad-Mounted 2,300V to 480V Transformer • Installation of Main Service Disconnect (per Entergy requirements) • Installation of MCC with Starter Cabinets for Well Starters w/Soft Starts • Installation of Service Disconnect for Each Starter (TYP of 2) • Removal and Replacement of 150HP Well Motors (TYP of 2) • Termination of Electrical Connections into Existing Plant Service/Controls
08/03/2021 07:45 PM UTC
Capital Project No. HL-15
Project No. 2021-715 Lake Charles City Capital Project No. HL-15 Bord du Lac Drive - Marina Repairs City of Lake Charles, LA The general scope of work is the restoration of the Lake Charles Civic Center Marina Docks A, B, and C to pre-hurricane loss conditions. The general scope of repair includes the following general items: • Complete removal of damaged float assemblies and walers, water line, electrical conductors, gangway, service pedestals, and related side pile guides. • Installation of new float assemblies and walers, side pile guides, thru rods, water and electrical system, service pedestals, and missing filler panels and covers. • Re-coat damaged guide piles.
08/03/2021 07:45 PM UTC
CP HL-14
City of Lake Charles, Louisiana Emergency Generator Replacement of Lake Charles Civic Center CP HL-14 Scope of Work: Disconnect and abandon the existing non-functioning diesel generator. Disconnect and remove the existing automatic transfer switch. Provide and install a new 350kw / 437.5kva 277/480v 3p 4w diesel generator in a weatherproof sound attenuated enclosure mounted onto a UL2085 diesel storage tank. Mount onto a new concrete slab adjacent to the cooling tower – east side. Provide and install new underground feeders thru the basement to a new Automatic Transfer Switch - ATS location and reconnect all previous feeds/loads.
08/03/2021 07:45 PM UTC
Project #HL-66
City of Lake Charles, Louisiana LCPD Central Station Restoration- Project # HL-66 Scope of Work: Remove and install new roofing over the existing building and parking canopy against building. Repair indoor water damage at front lobby and at men’s and women’s restroom and janitor closet.
08/03/2021 07:45 PM UTC
RFQ #2021-HL54
Request for Qualifications for Construction Contracting Services - Historic Structure
08/03/2021 07:45 PM UTC
141 - 150 of 382 Solicitations
1 2 11 12 13 15 17 18 19 38 39