City of Lake Charles
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Number | Deadline |
---|---|
Project No. 2018-681 Capital Project No. 3279
Project No. 2018-681
Capital Project No. 3279
6th Avenue Reconstruction
3rd Street to 6th Street
City of Lake Charles, LA
The general scope of work for Project No. 2018-681, 6th Avenue Reconstruction from 3rd Street to 6th Street includes the following:
a. Reconstruction of roadways
b. Storm drainage improvements
c. New water distribution system
d. New sidewalks & ADA compliant sidewalk ramps
| 08/17/2021 07:45 PM UTC |
PROJECT NUMBER HL-SOV-95/96/98/99/101-108/110/112-114
CITY OF LAKE CHARLES, LOUISIANA
HURRICANE LAURA (DR-4559-LA) DISASTER RECOVERY PROGRAM
WATER TREATMENT PLANTS – CHEMICAL FEED SYSTEM REPAIRS
PROJECT NUMBER HL-SOV-95/96/98/99/101-108/110/112-114
The Contractor shall furnish all labor, materials, equipment, tools, services, supervision, and incidentals required to complete the Work as shown on the Plans and specified herein. This Work includes, but is not necessarily limited to, the following:
1. Chlorine Feed System (Insurance SOV #101) @ Center East WTP (3207 Center Street)
a. Remove and Replace Exterior Door w/Panic Hardware
b. Remove and Replace Security Chains for Chlorine Cover
2. Fluoride Feed System (Insurance SOV #102) @ Center East WTP (3207 Center Street)
a. Removal and Disposal of Diluted Chemical
b. Remove and Replace Bulk Storage Tank
3. Phosphate Feed System (Insurance SOV #104) @ Center East WTP (3207 Center Street)
a. Removal and Disposal of Diluted Chemical
b. Remove and Replace Bulk Storage Tank
4. Caustic Feed System (Insurance SOV #108) @ Center East WTP (3207 Center Street)
a. Removal and Disposal of Diluted Chemical
b. Furnish and Install New Bulk Fill Line (2-Inch)
c. Remove and Replace Bulk Storage Tank
5. Caustic Feed System (Insurance SOV #103) @ Center West WTP (3208 Center Street)
a. Removal and Disposal of Diluted Chemical
b. Furnish and Install New Bulk Fill Line (2-Inch)
c. Furnish and Install Day Tank w/Transfer Pump
d. Remove and Replace Bulk Storage Tank
6. Phosphate Feed System (Insurance SOV #105) @ Center West WTP (3208 Center Street)
a. Remove and Replace Fiberglass Enclosure
b. Re-termination of Damaged Electrical/Process Piping
c. Furnish and Install Duplex Metering Pump Skid
d. Furnish and Install Day Tank w/Transfer Pump
e. Remove and Replace Bulk Storage Tank
7. Fluoride Feed System (Insurance SOV #106) @ Center West WTP (3208 Center Street)
a. Removal and Disposal of Diluted Chemical
b. Remove and Replace Bulk Storage Tank
8. Caustic Feed System (Insurance SOV #95) @ Chennault WTP (1501 W. Main Street)
a. Furnish and Install Fiberglass Enclosure
b. Furnish and Install Electrical Wiring/Conduit
c. Furnish and Install Process Piping
d. Furnish and Install New Bulk Fill Line (2-Inch)
e. Furnish and Install Duplex Metering Pump Skid
f. Furnish and Install Day Tank w/Transfer Pump
g. Remove and Replace Bulk Storage Tank
9. Chlorine Feed System (Insurance SOV #96) @ Chennault WTP (1501 W. Main Street)
a. Remove and Replace Exterior Door w/Panic Hardware
b. Remove and Replace Exterior Single-Pane Windows
c. Remove and Replace Security Chains for Chlorine Cover
10. Fluoride Feed System (Insurance SOV #98) @ Chennault WTP (1501 W. Main Street)
a. Furnish and Install Electrical Wiring/Conduit
b. Furnish and Install New Bulk Fill Line (2-Inch)
c. Remove and Replace Bulk Storage Tank
11. Phosphate Feed System (Insurance SOV #99) @ Chennault WTP (1501 W. Main Street)
a. Remove and Replace Fiberglass Enclosure
b. Furnish and Install Electrical Wiring/Conduit
c. Furnish and Install New Bulk Fill Line (2-Inch)
d. Furnish and Install Duplex Metering Pump Skid
e. Furnish and Install Day Tank w/Transfer Pump
f. Remove and Replace Bulk Storage Tank
12. Caustic Feed System (Insurance SOV #110) @ McNeese WTP (617 E. McNeese Street)
a. Furnish and Install New Bulk Fill Line (2-Inch)
b. Furnish and Install Day Tank w/Transfer Pump
c. Remove and Replace Bulk Storage Tank
13. Chlorine Feed System (Insurance SOV #112) @ McNeese WTP (617 E. McNeese Street)
a. Remove and Replace Fiberglass Enclosure
b. Remove and Replace Security Chains for Chlorine Cover
14. Fluoride Feed System (Insurance SOV #113) @ McNeese WTP (617 E. McNeese Street)
a. Remove and Replace Fiberglass Enclosure
b. Re-termination of Damaged Electrical/Process Piping
c. Furnish and Install Duplex Metering Pump Skid
d. Furnish and Install Day Tank w/Transfer Pump
e. Remove and Replace Bulk Storage Tank
15. Phosphate Feed System (Insurance SOV #114) @ McNeese WTP (617 E. McNeese Street)
a. Remove and Replace Fiberglass Enclosure
b. Re-termination of Damaged Electrical/Process Piping
c. Furnish and Install Duplex Metering Pump Skid
d. Furnish and Install Day Tank w/Transfer Pump
e. Remove and Replace Bulk Storage Tank
| 08/17/2021 07:45 PM UTC |
Project No. 2019-697 Capital Project No. 3288
Project No. 2019-697
Capital Project No. 3288
Holly Hill Road Sewer Line Rehabilitation Phase 3
City of Lake Charles, LA
The general scope of work for Project No. 2019-697, Capital Project No. 3288, includes the rehabilitation of approximately 2500 feet of 48-inch sewer main by cured-in-place (CIPP) lining including sewer manholes on Holly Hill Road from Wickersham Drive/Moss Loop north to Chrysler Street. Sewer manhole rehabilitation to continue northerly to Prien Lake Road Roundabout.
| 08/03/2021 07:45 PM UTC |
Project Number HL-SOV-93
CITY OF LAKE CHARLES, LOUISIANA
HURRICANE LAURA (DR-4559-LA) DISASTER RECOVERY PROGRAM
GEORGE H. WEST WATER TREATMENT PLANT
WELLS G-8 & G-9 STARTER REPLACEMENTS
PROJECT NUMBER HL-SOV-93
I. Background:
Gusting winds, debris impacts, and heavy rain, associated with Hurricane Laura, incurred damage to the motor starters/cabinets on wells G-8 and G-9 which are located at the N. Ryan and Railroad Ave well site associated with the Water Treatment Plant. The damage to the starters is to the point where functions of the systems no longer provide reliable operation and are in need of replacement. This project will serve to replace the starters, controls, and cabinets associated with Wells G-8 and G-9 and return the water system to its pre-storm operation. This project is necessary to ensure the City of Lake Charles is able to adequately provide reliable service to their consumers.
II. Scope of Work:
Implementation of electrical improvements, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA), to reinstate damaged well starters to their pre-storm condition, as well as, improve equipment installation in conformance with applicable codes and standards and improve the ability of the Owner to service and maintain the proposed equipment. This Work shall include:
• Removal and Disposal of Existing, Defective Starter Cabinets
• Installation of Pad-Mounted 2,300V to 480V Transformer
• Installation of Main Service Disconnect (per Entergy requirements)
• Installation of MCC with Starter Cabinets for Well Starters w/Soft Starts
• Installation of Service Disconnect for Each Starter (TYP of 2)
• Removal and Replacement of 150HP Well Motors (TYP of 2)
• Termination of Electrical Connections into Existing Plant Service/Controls
| 08/03/2021 07:45 PM UTC |
Capital Project No. HL-15
Project No. 2021-715
Lake Charles City Capital Project No. HL-15
Bord du Lac Drive - Marina Repairs
City of Lake Charles, LA
The general scope of work is the restoration of the Lake Charles Civic Center Marina Docks A, B, and C to pre-hurricane loss conditions.
The general scope of repair includes the following general items:
• Complete removal of damaged float assemblies and walers, water line, electrical conductors, gangway, service pedestals, and related side pile guides.
• Installation of new float assemblies and walers, side pile guides, thru rods, water and electrical system, service pedestals, and missing filler panels and covers.
• Re-coat damaged guide piles.
| 08/03/2021 07:45 PM UTC |
CP HL-14
City of Lake Charles, Louisiana
Emergency Generator Replacement of Lake Charles Civic Center
CP HL-14
Scope of Work: Disconnect and abandon the existing non-functioning diesel generator. Disconnect and remove the existing automatic transfer switch. Provide and install a new 350kw / 437.5kva 277/480v 3p 4w diesel generator in a weatherproof sound attenuated enclosure mounted onto a UL2085 diesel storage tank. Mount onto a new concrete slab adjacent to the cooling tower – east side. Provide and install new underground feeders thru the basement to a new Automatic Transfer Switch - ATS location and reconnect all previous feeds/loads.
| 08/03/2021 07:45 PM UTC |
Project #HL-66
City of Lake Charles, Louisiana
LCPD Central Station Restoration-
Project # HL-66
Scope of Work:
Remove and install new roofing over the existing building and parking canopy against building. Repair indoor water damage at front lobby and at men’s and women’s restroom and janitor closet.
| 08/03/2021 07:45 PM UTC |
RFQ #2021-HL54
Request for Qualifications for Construction Contracting Services - Historic Structure
| 08/03/2021 07:45 PM UTC |
CP 3339
City of Lake Charles, Louisiana
Lakefront Parking Garage – Phase II
CP 3339
Lakefront Parking Garage – Phase II
Estimate of Probable Cost
6/3/2021
1. The Work includes repairs to existing parking garage structure.
a. Demolition and removal of misc. metal and CMU walls.
b. Replacement of existing electrical equipment, new lighting & specialty lighting.
c. New storefront systems for elevator lobby.
d. New curtain wall system.
e. New exterior metal stair units.
f. Repairs to existing buildings including roofing, fascia, soffit, pre-finished metal siding, framing, sheathing, flooring, re-painting etc.
g. New retaining wall foundations and waterproofing.
h. Fascade replacement of pre-finished metal wall panels.
i. Re-stripping of parking area & misc. painting.
| 07/20/2021 07:45 PM UTC |
HL - 02, 06, 135, 136
City of Lake Charles, Louisiana
Hurricane Laura storm Repairs – Multiple Ball Park Repairs
HL - 02, 06, 135, 136
1. The Work includes repairs to multiple existing park facilities including ball fields, concession
stands, restrooms, bleachers and covers.
a. Repair existing bleacher cover structures. Replace damaged bleachers.
b. Chain-link fencing repair/replacement.
c. Repairs to lighting and mechanical systems.
d. Repairs to existing buildings including roofing, fascia, soffit, siding, framing, sheathing, flooring, gypsum board, painting etc.
| 07/20/2021 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.