General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Project No. 2023-734 Capital Project No. 3400
Project No. 2023-734 Capital Project No. 3400 18th Street Reconstruction (Lake St. to Creole St.) – Phase I City of Lake Charles, Louisiana The general scope of work for Phase 1 of this project is the reconstruction of 18th Street from Lake Street to the west side of the existing bridge over Small Bayou (approx. 800 feet). This includes the construction of a new 25-foot-wide reinforced concrete roadway with an integral curb and with a sidewalk on both sides. The installation of a new subsurface drainage system will also be included to drain this new roadway and better serve the impacted area. Lastly, this project will include the installation of a new, larger diameter water distribution system from Lake Street to Creole Street.
06/02/2026 07:45 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Capital Project Number CP3250
CITY OF LAKE CHARLES, LOUISIANA KIRKMAN AND OPELOUSAS MODIFICATIONS AND RECONSTRUCTION CAPITAL PROJECT NUMBER CP3250 Scope of Services: The City of Lake Charles desires to provide roadway repairs to the existing Kirman Street and Opelousas Street intersection. Repairs to the existing roadway shall consist of the removal of roadway pavement, damaged and/or non-ADA compliant sidewalk pavement, waterline and sewer line relocation/replacement, and drainage improvements required to reconstruct this damaged intersection.
11/30/2021 08:45 PM UTC
Capital Project Number 3393
CITY OF LAKE CHARLES, LOUISIANA CONTRABAND SEWER LIFT STATION PERMANENT STAND-BY GENERATOR CAPITAL PROJECT NUMBER CP3393 Scope of Services: Contractor shall complete all Work as specified or indicated in the Contract Documents for Contraband Sewer Lift Station – Permanent Stand-by Generator project. The Work includes, but is not limited to, the following: • Furnish and Install 480V Stand-by Generator with Automatic Transfer Switch • Intercept incoming Entergy Feed and Replace Miscellaneous Electrical Panels • Interconnect Generator Control Panel with Owner’s SCADA and Low Voltage Supply
11/30/2021 08:45 PM UTC
CP 3341
City of Lake Charles, Louisiana Clooney Street Improvement CP 3341 The referenced project will include the following improvements to Clooney Street: • Removal of existing concrete pavement • Reconstruction of roadway with lime-treated subgrade, stone base, and new concrete pavement • Installation of subsurface drainage system • Installation of 6” HDPE water main • CIPP lining of existing sanitary sewer main and services
11/30/2021 08:45 PM UTC
Repair Project HL-SOV-081
City of Lake Charles WWTP A Tank Debris Removal and Disposal Project Hurricane Laura (DR-4559-LA) Recovery Program Repair Project HL-SOV-081 Scope of Services: Removal of storm blown debris from open top wastewater tanks at WWTP A, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following: A. GENERAL 1. Sludge material in tanks listed below to be dewatered, hauled, and disposed of at an approved landfill. 2. The landfilled product shall have a minimum solids content of 16%. 3. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein. B. WWTP A 1. Remove and dispose of settled debris in Digester No. 1 (SOV 81.F.1). 2. Remove and dispose of settled debris in Digester No. 2 (SOV 81.F.2). 3. Remove and dispose of settled debris in Aeration Basin No. 1 (SOV 81.G.1). 4. Remove and dispose of settled debris in Aeration Basin No. 2 (SOV 81.G.2). 5. Remove and dispose of settled debris in Aeration Basin No. 3 (SOV 81.G.3). 6. Remove and dispose of settled debris in Aeration Basin No. 4 (SOV 81.G.4).
11/30/2021 08:45 PM UTC
Repair Project HL-SOV-126
City of Lake Charles WWTP D Tank Debris Removal and Disposal Project Hurricane Laura (DR-4559-LA) Recovery Program Repair Project HL-SOV-126 Scope of Services: Removal of storm blown debris from open top wastewater tanks at WWTP D, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following: A. GENERAL 1. Sludge material in tanks listed below to be dewatered, hauled, and disposed of at an approved landfill. 2. The landfilled product shall have a minimum solids content of 16%. 3. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein. B. WWTP D 1. Remove and dispose of debris in Digester No. 1 (SOV 126.B.1). 2. Remove and dispose of debris in Digester No. 2 (SOV 126.B.2). 3. Remove and dispose of debris in Digester No. 3 (SOV 126.B.3). 4. Remove and dispose of debris in Oxidation Ditch No. 1 (SOV 126.A.1). 5. Remove and dispose of debris in Oxidation Ditch No. 2 (SOV 126.A.2). 6. Remove and dispose of debris in Oxidation Ditch No. 3 (SOV 126.A.3). 7. Remove and dispose of debris in Anoxic Tank No. 1 (SOV 126.A.4). 8. Remove and dispose of debris in Anoxic Tank No. 2 (SOV 126.A.5). 9. Remove and dispose of debris in Anoxic Tank No. 3 (SOV 126.A.6).
11/30/2021 08:45 PM UTC
Hurricane Laura Storm Repairs - Park Fencing Repairs
City of Lake Charles, Louisiana Hurricane Laura storm Repairs – Park Fencing Repairs HL-01 DREW PARK HL-03 GOOSPORT PARK HL-05 BELLARD PARK HL-07 NORTH BEACH HL-08 CLIFTON PARK HL-09 LOCK PARK HL-12 LANZA PARK HL-18 MILLENNIUM PLAYGROUND HL-20 McMILLIAN PARK HL-120 COLUMBUS CIRCLE HL-137 LaGRANGE SOCCER PARK HL-139 RIVERSIDE PARK HL-140 TUTEN PARK HL-142 ADMIRAL NIMITZ PARK HL-143 GRACE AND MEDORA PARK HL-144 MARY BELLE PARK HL-145 GENERAL MOORE PARK HL-146 HOLMES STREET PARK HL-147 GRACE AND CHURCH PARK 1. The Work includes repairs to existing fencing at park facilities a. Chain-link fencing repair/replacement. b. Steel fencing repairs. c. Aluminum fencing repairs/replacement.
11/16/2021 08:45 PM UTC
Project No. 2021-715
Project No. 2021-715 Lake Charles City Capital Project No. HL-15 Bord du Lac Drive - Marina Repairs (RE-BID) City of Lake Charles, LA The general scope of work is the restoration of the Lake Charles Civic Center Marina Docks A, B, and C to pre-hurricane loss conditions. The general scope of repair includes the following general items: • Complete removal of damaged float assemblies and walers, water line, electrical conductors, gangway, service pedestals, and related side pile guides. • Installation of new float assemblies and walers, side pile guides, thru rods, water and electrical system, service pedestals, and missing filler panels and covers. • Re-coat damaged guide piles.
11/16/2021 08:45 PM UTC
HL-67 & HL-68
City of Lake Charles, Louisiana Communications Tower – 706 Enterprise Boulevard Project #HL-67 & HL-68 The scope of work: Base Bid: 1. Provide a new 350’ tall communications with associated site and foundation concrete drill shafts. 2. Attached antennae and cabling. 3. Commission tower to designed function & capacity. Alternate #1: 1. Extend tower height to 450’ as specified.
11/16/2021 08:45 PM UTC
HL-65
City of Lake Charles, Louisiana Training Center Demo HL-65 Remove existing building, foundation, paving, antennae and all related components in their entirety. Project includes asbestos abatement of hazardous material in building.
11/16/2021 08:45 PM UTC
HL-02, 06, 43, 135, 136
City of Lake Charles, Louisiana Hurricane Laura storm Repairs – Multiple Ball Park Repairs HL - 02, 06, 43, 135, 136 1. The Work includes repairs to multiple existing park facilities including ball fields, concession stands, restrooms, bleachers and covers. a. Repair existing bleacher cover structures. Replace damaged bleachers. b. Chain-link fencing repair/replacement. c. Repairs to lighting and mechanical systems. d. Repairs to existing buildings including roofing, fascia, soffit, siding, framing, sheathing, flooring, gypsum board, painting etc.
11/02/2021 07:45 PM UTC
141 - 150 of 400 Solicitations
1 2 11 12 13 15 17 18 19 39 40