General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Project No. 2024-746 Capital Project No. 3502
City of Lake Charles, Louisiana Project No. 2024-746 Capital Project No. 3502 Kirby and Hodges Street Sidewalk Repairs The general scope of work for this project includes the removal of hard surface pavement and installation of 4” plain concrete for sidewalks and 6” reinforced concrete for driveways or sidewalks (5.8 sack), together with 2-foot wide concrete curb and gutter and all necessary work for a complete project.
07/01/2025 07:45 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Project No. 2019-697 Capital Project No. 3288
Project No. 2019-697 Capital Project No. 3288 Holly Hill Road Sewer Line Rehabilitation Phase 3 City of Lake Charles, LA The general scope of work for Project No. 2019-697, Capital Project No. 3288, includes the rehabilitation of approximately 2500 feet of 48-inch sewer main by cured-in-place (CIPP) lining including sewer manholes on Holly Hill Road from Wickersham Drive/Moss Loop north to Chrysler Street. Sewer manhole rehabilitation to continue northerly to Prien Lake Road Roundabout.
08/03/2021 07:45 PM UTC
Project Number HL-SOV-93
CITY OF LAKE CHARLES, LOUISIANA HURRICANE LAURA (DR-4559-LA) DISASTER RECOVERY PROGRAM GEORGE H. WEST WATER TREATMENT PLANT WELLS G-8 & G-9 STARTER REPLACEMENTS PROJECT NUMBER HL-SOV-93 I. Background: Gusting winds, debris impacts, and heavy rain, associated with Hurricane Laura, incurred damage to the motor starters/cabinets on wells G-8 and G-9 which are located at the N. Ryan and Railroad Ave well site associated with the Water Treatment Plant. The damage to the starters is to the point where functions of the systems no longer provide reliable operation and are in need of replacement. This project will serve to replace the starters, controls, and cabinets associated with Wells G-8 and G-9 and return the water system to its pre-storm operation. This project is necessary to ensure the City of Lake Charles is able to adequately provide reliable service to their consumers. II. Scope of Work: Implementation of electrical improvements, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA), to reinstate damaged well starters to their pre-storm condition, as well as, improve equipment installation in conformance with applicable codes and standards and improve the ability of the Owner to service and maintain the proposed equipment. This Work shall include: • Removal and Disposal of Existing, Defective Starter Cabinets • Installation of Pad-Mounted 2,300V to 480V Transformer • Installation of Main Service Disconnect (per Entergy requirements) • Installation of MCC with Starter Cabinets for Well Starters w/Soft Starts • Installation of Service Disconnect for Each Starter (TYP of 2) • Removal and Replacement of 150HP Well Motors (TYP of 2) • Termination of Electrical Connections into Existing Plant Service/Controls
08/03/2021 07:45 PM UTC
Capital Project No. HL-15
Project No. 2021-715 Lake Charles City Capital Project No. HL-15 Bord du Lac Drive - Marina Repairs City of Lake Charles, LA The general scope of work is the restoration of the Lake Charles Civic Center Marina Docks A, B, and C to pre-hurricane loss conditions. The general scope of repair includes the following general items: • Complete removal of damaged float assemblies and walers, water line, electrical conductors, gangway, service pedestals, and related side pile guides. • Installation of new float assemblies and walers, side pile guides, thru rods, water and electrical system, service pedestals, and missing filler panels and covers. • Re-coat damaged guide piles.
08/03/2021 07:45 PM UTC
CP HL-14
City of Lake Charles, Louisiana Emergency Generator Replacement of Lake Charles Civic Center CP HL-14 Scope of Work: Disconnect and abandon the existing non-functioning diesel generator. Disconnect and remove the existing automatic transfer switch. Provide and install a new 350kw / 437.5kva 277/480v 3p 4w diesel generator in a weatherproof sound attenuated enclosure mounted onto a UL2085 diesel storage tank. Mount onto a new concrete slab adjacent to the cooling tower – east side. Provide and install new underground feeders thru the basement to a new Automatic Transfer Switch - ATS location and reconnect all previous feeds/loads.
08/03/2021 07:45 PM UTC
Project #HL-66
City of Lake Charles, Louisiana LCPD Central Station Restoration- Project # HL-66 Scope of Work: Remove and install new roofing over the existing building and parking canopy against building. Repair indoor water damage at front lobby and at men’s and women’s restroom and janitor closet.
08/03/2021 07:45 PM UTC
RFQ #2021-HL54
Request for Qualifications for Construction Contracting Services - Historic Structure
08/03/2021 07:45 PM UTC
CP 3339
City of Lake Charles, Louisiana Lakefront Parking Garage – Phase II CP 3339 Lakefront Parking Garage – Phase II Estimate of Probable Cost 6/3/2021 1. The Work includes repairs to existing parking garage structure. a. Demolition and removal of misc. metal and CMU walls. b. Replacement of existing electrical equipment, new lighting & specialty lighting. c. New storefront systems for elevator lobby. d. New curtain wall system. e. New exterior metal stair units. f. Repairs to existing buildings including roofing, fascia, soffit, pre-finished metal siding, framing, sheathing, flooring, re-painting etc. g. New retaining wall foundations and waterproofing. h. Fascade replacement of pre-finished metal wall panels. i. Re-stripping of parking area & misc. painting.
07/20/2021 07:45 PM UTC
HL - 02, 06, 135, 136
City of Lake Charles, Louisiana Hurricane Laura storm Repairs – Multiple Ball Park Repairs HL - 02, 06, 135, 136 1. The Work includes repairs to multiple existing park facilities including ball fields, concession stands, restrooms, bleachers and covers. a. Repair existing bleacher cover structures. Replace damaged bleachers. b. Chain-link fencing repair/replacement. c. Repairs to lighting and mechanical systems. d. Repairs to existing buildings including roofing, fascia, soffit, siding, framing, sheathing, flooring, gypsum board, painting etc.
07/20/2021 07:45 PM UTC
HL - 55
City of Lake Charles, Louisiana Hurricane Laura Storm Repairs – Central School - Interiors HL - 55 The general scope of work will include repair to damaged plaster walls and ceilings, repainting, repair/replacement of damaged wood trim, wood floor repair, carpet replacement, installing a new mechanical yard for replaced HVAC systems, electrical repairs, misc. plumbing and site drainage repairs.
07/20/2021 07:45 PM UTC
CP3231
City of Lake Charles, Louisiana 2nd Street Rehabilitation (6th Avenue to 8th Avenue) CP3231 The referenced project will include the following improvements to 2nd Street from 6th Avenue to 8th Avenue: • Rehabilitation of existing asphalt roadway with cement stabilized base and new asphalt pavement • Installation of concrete sidewalk • Installation of subsurface drainage system
07/20/2021 07:45 PM UTC
141 - 150 of 378 Solicitations
1 2 11 12 13 15 17 18 19 37 38