General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
RFP #2026-25
Request for Proposals for Entertainment, Food and Beverage Establishment on the Lakefront
07/14/2026 07:45 PM UTC
Capital Project Number 3544
City of Lake Charles Hodges Street Waterline Extension Capital Project Number 3544 I. Background: Homes along Hodges Street are experiencing ongoing low water pressure issues. Existing infrastructure along this section of the distribution system is undersized and unable to adequately meet current household demand, resulting in inconsistent and insufficient water pressure within several homes. By extending and upgrading the waterline, the project will improve system capacity, enhance water flow, and provide more reliable service to affected properties. This improvement is intended to ensure adequate water pressure for daily use and to support long-term reliability of the neighborhood’s water distribution system. II. Project Scope of Work: Design and implementation of ~1,500 feet of 6-inch diameter waterline including a looping connection on W. Prien Lake Road and a looping connection on E. Hale Street. Design Services shall be as per the City of Lake Charles A&E Manual.
08/04/2026 07:45 PM UTC
Capital Project No. CP2894
City of Lake Charles, Louisiana WWTP A McNabb and Cline Street Emergency Sewer System Rehabilitation Capital Project No. CP2894 I. Background: Waggoner Engineering, Inc. (Waggoner) was retained by the City of Lake Charles, Louisiana to evaluate and address deficiencies within the existing sanitary sewer collection system along McNabb Street between Broad Street and Cline Street. Approximately 2,250 linear feet of existing 18-inch reinforced concrete sanitary sewer pipe along McNabb Street has been identified as being in poor structural condition. Observed deficiencies include cracking and joint separation. Due to the severity and extent of the deterioration, the sewer line is no longer suitable for spot repairs or lining and requires full replacement. Rehabilitation of this segment will be performed using pipe bursting methods to install new 18-inch high-density polyethylene (HDPE) pipe, minimizing surface disruption while significantly improving the long-term performance and reliability of the sanitary sewer system. II. Project Scope of Work: Design and construction services for the repair and rehabilitation of the existing 18-inch gravity sanitary sewer collection system along McNabb Street, between Broad Street and Cline Street, to address documented system deterioration. Design services shall be as per the City of Lake Charles A&E Manual. The work will include, but is not limited to, the following: • Replacement of the existing 18-inch gravity sewer main via pipe bursting installation. • Reinstating of existing sanitary sewer service laterals to the rehabilitated main. • Furnishing, installation, operation, and maintenance of temporary bypass pumping to maintain continuous sewer service during construction.
08/04/2026 07:45 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
Repair Project HL-SOV-029
City of Lake Charles WWTP B/C Tank Debris Removal and Disposal Project Hurricane Laura (DR-4559-LA) Recovery Program Repair Project HL-SOV-029 Scope of Services: Removal of storm blown debris from open top wastewater tanks at WWTP B/C, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following: A. GENERAL 1. Sludge material in tanks listed below to be dewatered, hauled, and disposed of at an approved landfill. 2. The landfilled product shall have a minimum solids content of 16%. 3. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein. B. WWTP B/C 1. Remove and dispose of debris in Digester No. 1 (SOV 29). 2. Remove and dispose of debris in Aeration Basin No. 1 (SOV 29.A.1).
12/14/2021 08:45 PM UTC
CP 3316
City of Lake Charles, Louisiana Project Name: Mallard Golf Club Lake Charles Clubhouse & Pro Shop Capital Project Number: CP3316 New 7000 SF Clubhouse facility will include Pro Shop, Offices, Restrooms, Dinning/Bar and Kitchen
11/30/2021 08:45 PM UTC
Capital Project Number CP3250
CITY OF LAKE CHARLES, LOUISIANA KIRKMAN AND OPELOUSAS MODIFICATIONS AND RECONSTRUCTION CAPITAL PROJECT NUMBER CP3250 Scope of Services: The City of Lake Charles desires to provide roadway repairs to the existing Kirman Street and Opelousas Street intersection. Repairs to the existing roadway shall consist of the removal of roadway pavement, damaged and/or non-ADA compliant sidewalk pavement, waterline and sewer line relocation/replacement, and drainage improvements required to reconstruct this damaged intersection.
11/30/2021 08:45 PM UTC
Capital Project Number 3393
CITY OF LAKE CHARLES, LOUISIANA CONTRABAND SEWER LIFT STATION PERMANENT STAND-BY GENERATOR CAPITAL PROJECT NUMBER CP3393 Scope of Services: Contractor shall complete all Work as specified or indicated in the Contract Documents for Contraband Sewer Lift Station – Permanent Stand-by Generator project. The Work includes, but is not limited to, the following: • Furnish and Install 480V Stand-by Generator with Automatic Transfer Switch • Intercept incoming Entergy Feed and Replace Miscellaneous Electrical Panels • Interconnect Generator Control Panel with Owner’s SCADA and Low Voltage Supply
11/30/2021 08:45 PM UTC
CP 3341
City of Lake Charles, Louisiana Clooney Street Improvement CP 3341 The referenced project will include the following improvements to Clooney Street: • Removal of existing concrete pavement • Reconstruction of roadway with lime-treated subgrade, stone base, and new concrete pavement • Installation of subsurface drainage system • Installation of 6” HDPE water main • CIPP lining of existing sanitary sewer main and services
11/30/2021 08:45 PM UTC
Repair Project HL-SOV-081
City of Lake Charles WWTP A Tank Debris Removal and Disposal Project Hurricane Laura (DR-4559-LA) Recovery Program Repair Project HL-SOV-081 Scope of Services: Removal of storm blown debris from open top wastewater tanks at WWTP A, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following: A. GENERAL 1. Sludge material in tanks listed below to be dewatered, hauled, and disposed of at an approved landfill. 2. The landfilled product shall have a minimum solids content of 16%. 3. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein. B. WWTP A 1. Remove and dispose of settled debris in Digester No. 1 (SOV 81.F.1). 2. Remove and dispose of settled debris in Digester No. 2 (SOV 81.F.2). 3. Remove and dispose of settled debris in Aeration Basin No. 1 (SOV 81.G.1). 4. Remove and dispose of settled debris in Aeration Basin No. 2 (SOV 81.G.2). 5. Remove and dispose of settled debris in Aeration Basin No. 3 (SOV 81.G.3). 6. Remove and dispose of settled debris in Aeration Basin No. 4 (SOV 81.G.4).
11/30/2021 08:45 PM UTC
Repair Project HL-SOV-126
City of Lake Charles WWTP D Tank Debris Removal and Disposal Project Hurricane Laura (DR-4559-LA) Recovery Program Repair Project HL-SOV-126 Scope of Services: Removal of storm blown debris from open top wastewater tanks at WWTP D, in response to damage incurred as a result of Hurricane Laura (DR-4559-LA). This Work shall include the following: A. GENERAL 1. Sludge material in tanks listed below to be dewatered, hauled, and disposed of at an approved landfill. 2. The landfilled product shall have a minimum solids content of 16%. 3. It shall be the contractor’s responsibility to provide means and methods for the completion of all specified criteria listed herein. B. WWTP D 1. Remove and dispose of debris in Digester No. 1 (SOV 126.B.1). 2. Remove and dispose of debris in Digester No. 2 (SOV 126.B.2). 3. Remove and dispose of debris in Digester No. 3 (SOV 126.B.3). 4. Remove and dispose of debris in Oxidation Ditch No. 1 (SOV 126.A.1). 5. Remove and dispose of debris in Oxidation Ditch No. 2 (SOV 126.A.2). 6. Remove and dispose of debris in Oxidation Ditch No. 3 (SOV 126.A.3). 7. Remove and dispose of debris in Anoxic Tank No. 1 (SOV 126.A.4). 8. Remove and dispose of debris in Anoxic Tank No. 2 (SOV 126.A.5). 9. Remove and dispose of debris in Anoxic Tank No. 3 (SOV 126.A.6).
11/30/2021 08:45 PM UTC
Hurricane Laura Storm Repairs - Park Fencing Repairs
City of Lake Charles, Louisiana Hurricane Laura storm Repairs – Park Fencing Repairs HL-01 DREW PARK HL-03 GOOSPORT PARK HL-05 BELLARD PARK HL-07 NORTH BEACH HL-08 CLIFTON PARK HL-09 LOCK PARK HL-12 LANZA PARK HL-18 MILLENNIUM PLAYGROUND HL-20 McMILLIAN PARK HL-120 COLUMBUS CIRCLE HL-137 LaGRANGE SOCCER PARK HL-139 RIVERSIDE PARK HL-140 TUTEN PARK HL-142 ADMIRAL NIMITZ PARK HL-143 GRACE AND MEDORA PARK HL-144 MARY BELLE PARK HL-145 GENERAL MOORE PARK HL-146 HOLMES STREET PARK HL-147 GRACE AND CHURCH PARK 1. The Work includes repairs to existing fencing at park facilities a. Chain-link fencing repair/replacement. b. Steel fencing repairs. c. Aluminum fencing repairs/replacement.
11/16/2021 08:45 PM UTC
Project No. 2021-715
Project No. 2021-715 Lake Charles City Capital Project No. HL-15 Bord du Lac Drive - Marina Repairs (RE-BID) City of Lake Charles, LA The general scope of work is the restoration of the Lake Charles Civic Center Marina Docks A, B, and C to pre-hurricane loss conditions. The general scope of repair includes the following general items: • Complete removal of damaged float assemblies and walers, water line, electrical conductors, gangway, service pedestals, and related side pile guides. • Installation of new float assemblies and walers, side pile guides, thru rods, water and electrical system, service pedestals, and missing filler panels and covers. • Re-coat damaged guide piles.
11/16/2021 08:45 PM UTC
HL-67 & HL-68
City of Lake Charles, Louisiana Communications Tower – 706 Enterprise Boulevard Project #HL-67 & HL-68 The scope of work: Base Bid: 1. Provide a new 350’ tall communications with associated site and foundation concrete drill shafts. 2. Attached antennae and cabling. 3. Commission tower to designed function & capacity. Alternate #1: 1. Extend tower height to 450’ as specified.
11/16/2021 08:45 PM UTC
141 - 150 of 402 Solicitations
1 2 11 12 13 15 17 18 19 40 41