DR002
City of Lake Charles, Louisiana
Lake Charles Public Works New Facility Phase 2
DR002
Scope of Project
Build a variety of new buildings on an existing partially developed site. Project to include parking, generators, underground drainage, drainage swales and detention areas, enclosed conditioned buildings, open air pavilions, vehicle canopies, a new fuel station, and other work as noted in plans and specifications.
| 02/16/2026 08:45 PM UTC |
|
LCR 401
City of Lake Charles, Louisiana
Lock Park Inclusive Playground
LCR 401
CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents for the LCR 401 Lock Park Inclusive Playground. The Work includes, but is not limited to:
PROJECT SUMMARY:
• The scope of work that is considered base bid includes:
o Necessary earthwork, grading, tree protection, and utility adjustments to accommodate the proposed playground and parking;
o Demolition of the two (2) stall concrete parking lot off 6th Street, the central pedestrian promenade connecting 6th Street to 7th Street, select removal of concrete paths to accommodate drainage and curb ramps, and the removal of select trees;
o Installation of vehicular rated concrete paving for a parking lot and entry drive, custom playground components, poured-in-place safety surfacing on a gravel and concrete base, engineered wood fiber safety surfacing, two (2) pre-engineered shade structures, concrete curbs and pedestrian paths, subsurface drainage, site lighting, playground fencing, planting, and an irrigation system.
• The scope of work that is considered alternates includes:
o Alternate No. 1: Add vehicular rated paving and curbs east of proposed drive aisle.
o Alternate No. 2: Add planting and irrigation in parking islands and in front of pavilion.
| 02/16/2026 08:45 PM UTC |
|
2026-12
Millennium Park Fall Surface Replacement
In accordance with the specifications, it is the intent of this formal invitation to receive bids from qualified bidders for Materials, Supplies and Labor for the removal of existing poured-in-place rubber surfacing, preparation of the underlying concrete slab, and installation of a synthetic turf playground surfacing system with an impact attenuation pad and silica sand infill for Millennium Park, located on the grounds of the Bord du Lac Park, adjacent to the Lake Charles Event Center.
All work shall be performed in a clean, safe, and workmanlike manner in accordance with manufacturer specifications and ASTM standards for playground surfacing safety and accessibility.
| 03/03/2026 08:45 PM UTC |
|
Project No. 2025-749 Capital Project No. 3309
PROJECT NO. 2025-749
CAPITAL PROJECT NO. 3309
HAM REID ROAD WATERLINE EXTENSION-
ELLIOTT RD. TO BIG LAKE RD.
CITY OF LAKE CHARLES, LA
SCOPE OF WORK:
The scope of work includes the installation of new 12” diameter waterline along the north side of Ham Reid Road between Elliot Road and Big Lake Highway (LA 384). The scope also includes the relocation of the existing 12” diameter water line at the intersection of La 384 and Graywood Parkway in anticipation of a new round-a-bout at this location.
| 03/03/2026 08:45 PM UTC |
| Number | Deadline |
|---|---|
|
Project No. 2018-674 Capital Project No. 3131
Project No. 2018-674
Capital Project No. 3131
Lake Street Reconstruction From Westmoreland Street South to Waverly Street
City of Lake Charles, LA ~
The general scope of work for Project No. 2018-674, Lake Street Extension from Westmoreland Street South to Waverly Street, includes the following:
1. Paving: Construct a new 10 inch thick, 48 to 54 foot wide reinforced concrete pavement with integral curb and 8” compacted stone base. New six foot (6’) wide plain concrete sidewalk on the east side of the street will be constructed. Approximate project length is about 550 linear feet.
2. Water: Replace the existing 8 inch PVC water line crossing Lake Street at Wedgewood with a new 8 inch DR-11 HDPE water pipe via directional drill, including valves, fittings, and fire hydrant. The existing 8 inch PVC water line will be abandoned in place or removed as required.
3. Drainage: Install new underground drainage system.
| 04/17/2018 07:45 PM UTC |
|
Project No. 2017-667 Capital Project No. 3270
Project No. 2017-667
Capital Project No. 3270
CDBG 5th Avenue Sidewalk Improvements
City of Lake Charles, LA ~
The general scope of work for Project No. 2017-667, Capital Project No. 3270, CDBG - 5th Avenue Sidewalk Improvements, includes installation of new concrete sidewalks, complete with ADA compliant surfaces at select locations.
| 04/17/2018 07:45 PM UTC |
|
Project No. 2017-668 Capital Project No. 3207
City of Lake Charles, Louisiana
Project No. 2017-668
Capital Project No. 3207
Enterprise Blvd. Paving and Drainage Rehabilitation
Phase 1
The general scope of work for Project No. 2017-668 includes rehabilitation of portions of the existing drainage system on Enterprise Boulevard, including removal and replacement of pipe, pipe bursting, cured-in-place pipe lining (CIPP), and catch basin construction between 12th Street and Broad Street in the City of Lake Charles, Louisiana.
| 04/03/2018 07:45 PM UTC |
|
Project No. 2017-669 Capital Project No. 3283
Project No. 2017-669
Capital Project No. 3283
Legendre Street Drainage Improvements - Contraband Bayou to McNeese Street Phase One
City of Lake Charles, LA ~
The scope of work for Project No. 2017-669 includes installation of approximately 675 linear feet of 8’ x 7’ Reinforced Concrete Box Culverts (RCB) and drainage inlets in the East roadside ditch of Legendre Street starting at the downstream end near Contraband Bayou and proceeding South to the Cell Tower drive (approximately 260 feet South of Badger Drive).
| 03/06/2018 08:45 PM UTC |
|
Project No. 2016-658, Capital Project No. 3288
Project No. 2016-658
Capital Project No. 3288
48” CIPP Lining from The Holly Hill Road/Prien Lake Road Roundabout
North to the Contraband Bayou Lift Station
City of Lake Charles, LA ~
The general scope of work for Project No. 2016-658, Capital Project No. 3288, includes the rehabilitation of approximately 2600 feet of 48 inch sewer main by cured-in-place (CIPP) lining from the Holly Hill Road/Prien Lake Road Roundabout North to the Contraband Bayou Lift Station. A system for bypass pumping to manage sewage flow must be furnished and maintained. Manhole tops will require removal and re construction to facilitate liner installation. Concrete and/or brick manholes will also be rehabilitated with new interior liners.
| 02/20/2018 08:45 PM UTC |
|
Capital Project Number CP3302
Capital Project Number CP3302
Southwest Water Treatment Plant
Horizontal Pressure Filter Rehabilitation
City of Lake Charles, LA ~
I. Scope of Services:
The City of Lake Charles desires to rehabilitate the six (6) existing horizontal pressure filters at the Southwest Water Treatment Plant. This Work will include but is not limited to the following:
1. Removal and replacement of the Filter Media within Filters #1 – 6
a. Estimated Total Volume Needed: 4,320 ft.3
b. 24” Layer of Manganese Greensand & 12” Layer of Anthracite
2. Removal and replacement of the Existing Gravel Bed and Retaining Screen
3. Removal and replacement of the Existing Underdrain Valves
4. Removal and replacement of additional Filter Internals as Required
5. Removal and replacement of the existing air scour piping and discharge nozzles.
6. Removal and replacement of the existing backwash water flow meter.
| 02/20/2018 08:45 PM UTC |
|
Project No. 2016-650, Capital Project No. 3268
Project No. 2016-650
Capital Project No. CP3268
Nelson Road Sewer Force Main Upgrade
Country Club Road to Linden Lane
City of Lake Charles, LA ~
This scope of work for Project No. 2016-650, Nelson Road Sewer Force Main Upgrade – Country Club Road to Linden Lane, includes the installation of a new 10 inch diameter force main from the intersection of Nelson Road and Country Club Road South to tie into an existing 10 inch diameter force main North of Linden Lane. This new force main will service the existing Pecan Acres sewer lift station and will include a connection for the option of receiving flow from the Nelson Pointe Apartments sewer lift station.
| 02/06/2018 08:45 PM UTC |
|
Capital Project No. CP3128
WWTP B/C Expansion and Rehabilitation Project
Phase I Demolition
Capital Project Number CP3128
City of Lake Charles, LA ~
I. Scope of Services:
A. A new WWTP B/C facility is currently under construction for The City of Lake Charles. Decommissioning of the existing WWTP B/C has been divided into two phases.
B. This scope of work covers Phase I of the demolition. The Work includes, but is not necessarily limited to, the following:
1. Removal and disposal of mechanical and electrical equipment from existing tankage at existing WWTPs B and C.
2. Demolition and filling of existing tankage at existing WWTPs B and C.
3. Installation of approximately 250 linear feet of 8-inch PVC, 20 linear feet of 24-inch ductile iron pipe, 90 linear feet of 30-inch HDPE, 372 linear feet of 48-inch ductile iron pipe, one new reinforced cast in place concrete collection box, and one 8-ft diameter FRP manhole.
4. Coating of two existing manholes and one new reinforced cast in place concrete collection box.
| 01/16/2018 08:45 PM UTC |
|
Capital Project No. CP3264
Capital Project No. CP3264
Interstate Corridor Beautification Project Phase I
REBID
City of Lake Charles, LA ~
NORTH I-10 EXIT RAMP 30 B AND SERVICE ROAD- LaDOTD PERMIT 153562
SOUTH I-10 SERVICE ROAD LaDOTD PERMIT 153565
COVE LANE AND ROUNDABOUT- LaDOTD PERMIT 153586
SCOPE OF WORK
The general scope of work for Project Interstate Corridor Beautification Phase I, Capital Project No. 3264, includes the following.
North I-10 Exit Ramp 30 B and Service Road - Installation of trees, palms, and shrubs.
South I-10 Service Road - Installation of trees, palms, and shrubs.
Cove Lane and Roundabout - installation of trees, palms, shrubs, and installation within the roundabout borrow fill material, concrete curbing, aluminum edging, and decorative stone with binding solution.
| 01/16/2018 08:45 PM UTC |
|
Project No. CP3264 Interstate Corridor Beautification Phase I (REBID)
Capital Project No. CP3264
Interstate Corridor Beautification Project Phase I
REBID
City of Lake Charles, LA ~
NORTH I-10 EXIT RAMP 30 B AND SERVICE ROAD- LaDOTD PERMIT 153562
SOUTH I-10 SERVICE ROAD LaDOTD PERMIT 153565
COVE LANE AND ROUNDABOUT- LaDOTD PERMIT 153586
SCOPE OF WORK
The general scope of work for Project Interstate Corridor Beautification Phase I, Capital Project No. 3264, includes the following.
North I-10 Exit Ramp 30 B and Service Road - Installation of trees, palms, and shrubs.
South I-10 Service Road - Installation of trees, palms, and shrubs.
Cove Lane and Roundabout - installation of trees, palms, shrubs, and installation within the roundabout borrow fill material, concrete curbing, aluminum edging, and decorative stone with binding solution.
| 01/16/2018 08:45 AM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.