General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
RFP #2026-25
Request for Proposals for Entertainment, Food and Beverage Establishment on the Lakefront
07/14/2026 07:45 PM UTC
Capital Project Number 3544
City of Lake Charles Hodges Street Waterline Extension Capital Project Number 3544 I. Background: Homes along Hodges Street are experiencing ongoing low water pressure issues. Existing infrastructure along this section of the distribution system is undersized and unable to adequately meet current household demand, resulting in inconsistent and insufficient water pressure within several homes. By extending and upgrading the waterline, the project will improve system capacity, enhance water flow, and provide more reliable service to affected properties. This improvement is intended to ensure adequate water pressure for daily use and to support long-term reliability of the neighborhood’s water distribution system. II. Project Scope of Work: Design and implementation of ~1,500 feet of 6-inch diameter waterline including a looping connection on W. Prien Lake Road and a looping connection on E. Hale Street. Design Services shall be as per the City of Lake Charles A&E Manual.
08/04/2026 07:45 PM UTC
Capital Project No. CP2894
City of Lake Charles, Louisiana WWTP A McNabb and Cline Street Emergency Sewer System Rehabilitation Capital Project No. CP2894 I. Background: Waggoner Engineering, Inc. (Waggoner) was retained by the City of Lake Charles, Louisiana to evaluate and address deficiencies within the existing sanitary sewer collection system along McNabb Street between Broad Street and Cline Street. Approximately 2,250 linear feet of existing 18-inch reinforced concrete sanitary sewer pipe along McNabb Street has been identified as being in poor structural condition. Observed deficiencies include cracking and joint separation. Due to the severity and extent of the deterioration, the sewer line is no longer suitable for spot repairs or lining and requires full replacement. Rehabilitation of this segment will be performed using pipe bursting methods to install new 18-inch high-density polyethylene (HDPE) pipe, minimizing surface disruption while significantly improving the long-term performance and reliability of the sanitary sewer system. II. Project Scope of Work: Design and construction services for the repair and rehabilitation of the existing 18-inch gravity sanitary sewer collection system along McNabb Street, between Broad Street and Cline Street, to address documented system deterioration. Design services shall be as per the City of Lake Charles A&E Manual. The work will include, but is not limited to, the following: • Replacement of the existing 18-inch gravity sewer main via pipe bursting installation. • Reinstating of existing sanitary sewer service laterals to the rehabilitated main. • Furnishing, installation, operation, and maintenance of temporary bypass pumping to maintain continuous sewer service during construction.
08/04/2026 07:45 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
Project No. CP3051, LEI Project No. 18-010
City of Lake Charles, Louisiana 2018 City Wide Striping Project City of Lake Charles Project No. CP3051 LEI Project No. 18-010 The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract. The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles: 1. General Doolittle Street (Highway 14 to General Twinning Street) 2. Holly Hill Road (Chrysler Street to Sale Road) 3. 1st Avenue (Prien Lake Road to Broad Street) 4. 2nd Avenue (Prien Lake Road to Broad Street) 5. 3rd Avenue (Prien Lake Road to Broad Street) 6. 4th Avenue (Prien Lake Road to Broad Street) 7. 6th Avenue (12th Street to 6th Street) 8. 6th Street (4th Avenue to Highway 14) 9. 7th Avenue (Prien Lake Road to 12th Street) 10. Common Street (McNeese Street to Sale Road) 11. Lake Street (Prien Lake Road to Shell Beach Drive) 12. Lake Street (McNeese Street to Sale Road) 13. Louisiana Avenue (Mill Street to 6th Street) 14. North Goos Boulevard (Opelousas Street to Knapp Street) 15. Sallier Street (Lake Street to Hodges Street) 16. 14th Street (Highway 14 to 4th Avenue) 17. School Street (Louisiana Avenue to Lake Street) 18. Power Center Parkway (Highway 14 to 5th Avenue) 19. Pine Street (Lakeshore Drive to Hodges Street) 20. Pryce Street (Lakeshore Drive to Enterprise Boulevard) 21. South Division Street (Kirkman Street to Enterprise Boulevard) 22. Enterprise Parkway (Interstate 10 to Katherine Street) 23. Bord du Lac Drive (Lakeshore Drive to North Lakeshore Drive) 24. 5th Avenue (570 linear feet at new bridge) The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
11/06/2018 08:45 PM UTC
Capital Project Number CP3256
City of Lake Charles, Louisiana Comeaux Street Drainage Improvements and Overlay Project North Grace Street to Dead End Capital Project Number CP3256 ~ I. Scope of Services: The City of Lake Charles desires to construct a closed drainage system and perform an asphalt overlay of Comeaux Street consisting of the following: • Installing 15”, 18” and 24” RCP culverts in existing ditches; • Constructing drop inlets as shown on plans; • Installing a 2 ½“asphalt overlay and other incidentals as required.
10/16/2018 07:45 PM UTC
Capital Project No. CP#3298
CITY OF LAKE CHARLES, LOUISIANA Common St. and Legion Street Lift St. Rehabilitation Capital Project No. CP#3298 ~ I. Scope of Services: A. Common St. 1. Replace the two existing pumps with new dry pit submersible pumps. 2. Replace all discharge piping and valves. 3. Demolish existing wooden fence and replace with green slatted hurricane fence. 4. Electrical improvements. 5. Coat wet well. B. Legion 1. Replace the two existing pumps with new submersible pumps on a rail system. 2. Replace all discharge piping and valves. 3. Demolish existing top deck and replace with new reinforced concrete top deck with access hatch. 4. Demolish existing hurricane fence and replace with green slatted hurricane fence. 5. Electrical improvements. 6. Coat wet well.
10/16/2018 07:45 PM UTC
Project No. 2017-670 Capital Project No. 2894
City of Lake Charles, Louisiana Project No. 2017-670 Capital Project No. 2894 Sewer Main Rehabilitation 3rd & 9th Ave., 5th, 6th, 8th, 10th St., Legion St., Oklahoma St. The general scope of work for Project No. 2017-670 includes the rehabilitation of existing sewer mains by cured-in-place pipe lining and pipe bursting, with service line reinstatement and all incidental pavement repair, as required, dress-up, and manhole rehabilitation.
10/02/2018 07:45 PM UTC
Project No. 2018-679 (OP0403)
City of Lake Charles, Louisiana Project No. 2018-679 (OP0403) Fire Station No. 7 Building Repairs The scope of work includes the installation of “push piers” under grade beams for foundation stabilization, replacement of the front porch and front sidewalk to establish positive drainage, cleaning and repairs to the exterior CMU and brick wall surfaces, roof flashing repairs, waterproofing with caulking around wall penetrations and water repellent on wall surfaces, and repainting of door frames, doors, and damaged areas of the interior of the truck bay walls.
09/18/2018 07:45 PM UTC
Capital Project Number CP3234
CITY OF LAKE CHARLES, LOUISIANA HIGHWAY STREET AND NORTH GRACE STREET DRAINAGE IMPROVEMENTS – PHASE II CAPITAL PROJECT NUMBER CP3234 The City of Lake Charles desires to improve the drainage conditions to portions of N. Grace St. and Highway St. sub basing as funds permit: 1. Highway Street - North Side (Martin Luther King Hwy. to N. Grace Street) a. Removing existing culverts for existing driveway crossings and installing a new closed drainage system. 2. N. Grace Street – East Side (Hwy St. to Guinn Street) a. Removing existing culverts for existing driveway crossings and installing a new closed drainage system.
09/18/2018 07:45 PM UTC
Capital Project Number CP3301
CITY OF LAKE CHARLES, LOUISIANA DOME LIFT STATION REHABILITATION CAPITAL PROJECT NUMBER CP3301 ~ The Dome Lift Station Rehabilitation Scope of Work includes, but is not necessarily limited to, the following: • Furnishing, installation, maintenance, and operation of a temporary bypass sewer pumping system inclusive of traffic controls. • Removal of existing pumps, valves, and electrical components for salvage by the City of Lake Charles Wastewater Division. • Demolition of structural, mechanical, and electrical portions of the existing Dome Lift Station as noted on the project drawings. • Cleaning of the interior of the remaining RCP wet well. • Construction of new reinforced concrete top slab for wet well inclusive of furnishing and installing aluminum access hatchway and fall through protection system. • Furnishing and installation of interior liner and coating system for inside of wet well and underside of top slab. • Furnishing and installation of mechanical systems including all duplex submersible pumps, guiderails, piping, valves, fittings, and specialties. • Furnishing and installation of specified components necessary for the installation a new electrical service separate from the existing electrical service from the Lake Charles Housing Authority office building. • Furnishing and installation of new electrical switchgear, controls panels, conduit and wiring, SCADA system, and other electrical components necessary for proper operation of the pump stations as shown on the drawings and as specified. • Furnishing of all site civil work including excavation, trenching, backfill, new aggregate surfaces, chain link fencing and gates, etc. as shown on the drawings and as specified.
09/04/2018 07:45 PM UTC
Capital Project Number CP3128
City of Lake Charles, Louisiana WWTP B/C Expansion and Rehabilitation Project Phase II Demolition Capital Project Number CP3128 I. Scope of Services: A. A new WWTP B/C facility is currently operational for The City of Lake Charles. Decommissioning of the existing WWTP B/C has been divided into two phases. B. This scope of work covers Phase II of the demolition. The Work includes, but is not necessarily limited to, the following: 1. Removal and disposal of mechanical and electrical equipment and demolition of existing tankage at existing WWTPs B and C. 2. Installation of a sludge return pump and skid mounted gravity belt thickening system. 3. Installation of a pre-engineered aluminum canopy. 4. Removal and disposal of existing motor control center and installation of new motor control center. 5. Miscellaneous civil/site improvements.
08/14/2018 07:45 PM UTC
Capital Project Number CP3305
CITY OF LAKE CHARLES, LOUISIANA GEORGE H. WEST WATER TREATMENT PLANT PRESSURE FILTER SYSTEM REHABILITATION AND IMPROVEMENTS CAPITAL PROJECT NUMBER CP3305 I. Scope of Services: The City of Lake Charles desires to rehabilitate the six (6) existing horizontal pressure filters at the George H. West Water Treatment Plant. This Work will include but is not limited to the following: 1. Complete Removal and Replacement of Filter Internals within all (6) Filters: a. Remove 30” of Manganese Anthrasand and Replace with 20” of Manganese GreensandPlus and 10” of Anthracite. b. Removal and Replacement of Existing Gravel Bed. c. Replacement of Existing PVC Components with Stainless Steel. d. Installation of Gravel Retaining Screen. e. Modify Existing Underdrain Strainers to Accommodate Sandvalves. f. Conditioning of Filter Media and Disinfection of the Filter Vessels. 2. Modify Air Scour Header to force Draindown. 3. Replacement of Filter Control Panel for additional Control. 4. Removal and Replacement of Existing Air Blower for Air Scour. 5. Modifications to Existing Backwash Pumps and associated Piping. 6. Installation of Slow Fill Line with Modulating Control Valve for Backwash. 7. Replacement of Existing Backwash Pump Controls with VFDs and New Backwash Control Panel. 8. Removal and Replacement of Existing Backwash Flow Meter. 9. Modification of Backwash Line Discharge into Recovery Basin. 10. Coating and Rehabilitation of Fluoride Secondary Containment Vessel. 11. Complete Touch-Ups as Required for Damaged Coating on Filter Vessels. 12. Installation of In-Line Static Mixer on Raw Water Influent Line.
07/17/2018 07:45 PM UTC
Project No. 2016-661 Capital Project No. 3224
Project No. 2016-661 Capital Project No. 3224 Muirfield and Turnberry Drainage Outfall Improvements Across the Lake Charles Country Club City of Lake Charles, LA ~ The general scope of work for Project No. 2016-661 includes installation of new drainage inlets and pipe, including the associated driveway and pavement work.
06/19/2018 07:45 PM UTC
271 - 280 of 402 Solicitations
1 2 24 25 26 28 30 31 32 40 41