City of Lake Charles
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
2026-17
Request for Qualifications for Architectural & Engineering Design of Resilient Indoor Multi-Sports & Recreation Complex
| 04/14/2026 07:45 PM UTC |
|
CP3538
City of Lake Charles, Louisiana
Buddy Prejean Park Lighting
CP3538
The overall project will include new field to the existing softball field. The field will be designed for NHSA regulation foot candles. Other miscellaneous components to be provided as per the bid drawings and manual.
| 04/14/2026 07:45 PM UTC |
| Number | Deadline |
|---|---|
|
Capital Project Number CP3305
CITY OF LAKE CHARLES, LOUISIANA
GEORGE H. WEST WATER TREATMENT PLANT
PRESSURE FILTER SYSTEM REHABILITATION AND IMPROVEMENTS
CAPITAL PROJECT NUMBER CP3305
I. Scope of Services:
The City of Lake Charles desires to rehabilitate the six (6) existing horizontal pressure filters at the George H. West Water Treatment Plant. This Work will include but is not limited to the following:
1. Complete Removal and Replacement of Filter Internals within all (6) Filters:
a. Remove 30” of Manganese Anthrasand and Replace with 20” of Manganese GreensandPlus and 10” of Anthracite.
b. Removal and Replacement of Existing Gravel Bed.
c. Replacement of Existing PVC Components with Stainless Steel.
d. Installation of Gravel Retaining Screen.
e. Modify Existing Underdrain Strainers to Accommodate Sandvalves.
f. Conditioning of Filter Media and Disinfection of the Filter Vessels.
2. Modify Air Scour Header to force Draindown.
3. Replacement of Filter Control Panel for additional Control.
4. Removal and Replacement of Existing Air Blower for Air Scour.
5. Modifications to Existing Backwash Pumps and associated Piping.
6. Installation of Slow Fill Line with Modulating Control Valve for Backwash.
7. Replacement of Existing Backwash Pump Controls with VFDs and New Backwash Control Panel.
8. Removal and Replacement of Existing Backwash Flow Meter.
9. Modification of Backwash Line Discharge into Recovery Basin.
10. Coating and Rehabilitation of Fluoride Secondary Containment Vessel.
11. Complete Touch-Ups as Required for Damaged Coating on Filter Vessels.
12. Installation of In-Line Static Mixer on Raw Water Influent Line.
| 07/17/2018 07:45 PM UTC |
|
Project No. 2016-661 Capital Project No. 3224
Project No. 2016-661
Capital Project No. 3224
Muirfield and Turnberry Drainage Outfall Improvements
Across the Lake Charles Country Club
City of Lake Charles, LA ~
The general scope of work for Project No. 2016-661 includes installation of new drainage inlets and pipe, including the associated driveway and pavement work.
| 06/19/2018 07:45 PM UTC |
|
Project No. 2018-677 Capital Project No. 3207
City of Lake Charles, Louisiana
Project No. 2018-677
Capital Project No. 3207
Enterprise Blvd. Paving and Drainage Rehabilitation
Phase 1 (Re-Bid)
The general scope of work for Project No. 2018-677 includes rehabilitation of portions of the existing drainage system on Enterprise Boulevard, including removal and replacement of pipe, pipe bursting, and catch basin construction between 12th Street and Broad Street in the City of Lake Charles, Louisiana.
| 06/05/2018 07:45 PM UTC |
|
Project No. 2018-676 Capital Project No. 3093
City of Lake Charles, Louisiana
Project No. 2018-676
Capital Project No. 3093
Alma Lane Drainage Improvements
The general scope of work for Project No. 2018-676 includes improvements to roadside ditches, including reinforced concrete pipe and catch basin installation.
| 06/05/2018 07:45 PM UTC |
|
Capital Project Number CP3253
City of Lake Charles, Louisiana
West McNeese Street Drainage and Sidewalk
Improvements – Barbe High School Property to
Nelson Road – Capital Project Number CP3253
Substantial Completion – 150 Calendar Days
I. Scope of Services:
The City of Lake Charles desires to install closed drainage and a sidewalk along the north side of W. McNeese Street. The scope of work to complete these improvements will include, but is not limited to the following:
1. W. McNeese Street (End of Barbe HS Property to Nelson Road)
a. Remove the existing drainage and install new, closed drainage to promote positive drainage within the area.
b. Install a curb and gutter section along the existing edge of road.
c. Install a sidewalk along the north side of the road to assist with pedestrian and school traffic.
| 04/17/2018 07:45 PM UTC |
|
Project No. 2018-674 Capital Project No. 3131
Project No. 2018-674
Capital Project No. 3131
Lake Street Reconstruction From Westmoreland Street South to Waverly Street
City of Lake Charles, LA ~
The general scope of work for Project No. 2018-674, Lake Street Extension from Westmoreland Street South to Waverly Street, includes the following:
1. Paving: Construct a new 10 inch thick, 48 to 54 foot wide reinforced concrete pavement with integral curb and 8” compacted stone base. New six foot (6’) wide plain concrete sidewalk on the east side of the street will be constructed. Approximate project length is about 550 linear feet.
2. Water: Replace the existing 8 inch PVC water line crossing Lake Street at Wedgewood with a new 8 inch DR-11 HDPE water pipe via directional drill, including valves, fittings, and fire hydrant. The existing 8 inch PVC water line will be abandoned in place or removed as required.
3. Drainage: Install new underground drainage system.
| 04/17/2018 07:45 PM UTC |
|
Project No. 2017-667 Capital Project No. 3270
Project No. 2017-667
Capital Project No. 3270
CDBG 5th Avenue Sidewalk Improvements
City of Lake Charles, LA ~
The general scope of work for Project No. 2017-667, Capital Project No. 3270, CDBG - 5th Avenue Sidewalk Improvements, includes installation of new concrete sidewalks, complete with ADA compliant surfaces at select locations.
| 04/17/2018 07:45 PM UTC |
|
Project No. 2017-668 Capital Project No. 3207
City of Lake Charles, Louisiana
Project No. 2017-668
Capital Project No. 3207
Enterprise Blvd. Paving and Drainage Rehabilitation
Phase 1
The general scope of work for Project No. 2017-668 includes rehabilitation of portions of the existing drainage system on Enterprise Boulevard, including removal and replacement of pipe, pipe bursting, cured-in-place pipe lining (CIPP), and catch basin construction between 12th Street and Broad Street in the City of Lake Charles, Louisiana.
| 04/03/2018 07:45 PM UTC |
|
Project No. 2017-669 Capital Project No. 3283
Project No. 2017-669
Capital Project No. 3283
Legendre Street Drainage Improvements - Contraband Bayou to McNeese Street Phase One
City of Lake Charles, LA ~
The scope of work for Project No. 2017-669 includes installation of approximately 675 linear feet of 8’ x 7’ Reinforced Concrete Box Culverts (RCB) and drainage inlets in the East roadside ditch of Legendre Street starting at the downstream end near Contraband Bayou and proceeding South to the Cell Tower drive (approximately 260 feet South of Badger Drive).
| 03/06/2018 08:45 PM UTC |
|
Project No. 2016-658, Capital Project No. 3288
Project No. 2016-658
Capital Project No. 3288
48” CIPP Lining from The Holly Hill Road/Prien Lake Road Roundabout
North to the Contraband Bayou Lift Station
City of Lake Charles, LA ~
The general scope of work for Project No. 2016-658, Capital Project No. 3288, includes the rehabilitation of approximately 2600 feet of 48 inch sewer main by cured-in-place (CIPP) lining from the Holly Hill Road/Prien Lake Road Roundabout North to the Contraband Bayou Lift Station. A system for bypass pumping to manage sewage flow must be furnished and maintained. Manhole tops will require removal and re construction to facilitate liner installation. Concrete and/or brick manholes will also be rehabilitated with new interior liners.
| 02/20/2018 08:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.