City of Lake Charles
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Project No. 2024-746 Capital Project No. 3502
City of Lake Charles, Louisiana
Project No. 2024-746
Capital Project No. 3502
Kirby and Hodges Street Sidewalk Repairs
The general scope of work for this project includes the removal of hard surface pavement and installation of 4” plain concrete for sidewalks and 6” reinforced concrete for driveways or sidewalks (5.8 sack), together with 2-foot wide concrete curb and gutter and all necessary work for a complete project.
| 07/01/2025 07:45 PM UTC |
Number | Deadline |
---|---|
Project No. 2014-627, Capital Project No. 3220
Project No. 2014-627
Capital Project No. 3220
City of Lake Charles, LA ~
The general scope of work for Project No. 2014-627 provides for the renovation of the Cleveland Street Sewer Lift Station, including removal and replacement of the two (2) pumps, valves, piping, construction of temporary driveways for two (2) nearby homes; excavating, backfilling, etc., and any other items necessary to provide a complete system which functions properly to the satisfaction of the Project Engineer and Wastewater Department of the City of Lake Charles.
| 12/15/2015 08:45 PM UTC |
Capital Project No. CP3221, LEI Project No. 15-012
Capital Project No. CP3221
LEI Project No. 15-012
2015 Asphalt Overlay of Various Streets
City of Lake Charles, LA ~
The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract.
The project consists of pavement patching, degrassing edge of road and grading shoulders, adjusting sanitary sewer manholes to grade, adjusting storm drain catch basins to grade, cold planing asphaltic pavement, asphaltic concrete surface course, pavement markings, asphaltic concrete ramps at paved driveways, aggregate surface course on aggregate driveways, topsoil shoulder material, aggregate surface course shoulder material, and hydro-seeding for the following streets at various locations in the City of Lake Charles:
1. Calcasieu Street (Opelousas Street to Jackson Street)
2. N. Lincoln Street (I-10 Service Road to Jackson Street)
3. N. Jake Street (I-10 Service Road to Jackson Street)
4. N. Simmons Street (I-10 Service Road to Jackson Street)
5. Lisle Peters Road (Big Lake Road to Dead End)
6. N. Adams Street (Moeling Street to Commercial Street)
7. N. Adams Street (Opelousas Street to Dead End))
8. Sale Road (Canal Street to Lake Street)
9. Raintree Cove (Lisle Peters Road to River Lane)
10. Goodman Road (Broad Street to Highway 90)
11. Louisiana Avenue (McNeese Street to Dead End)
12. Carriage Lane (Lisle Peters Road to River Lane)
13. 3rd Street (Highway 14 to 6th Avenue)
14. 6th Street (Kayouchee Street to McNabb Street)
15. River Lane
16. Creole Street (Prien Lake Road to I-210)
17. Jackson Street (North Simmons Street to Calcasieu Street)
18. Parking Lot Across from City Hall on Pujo Street
| 11/03/2015 08:45 PM UTC |
Capital Project No. CP3072
Capital Project No. CP3072
Riverside Park Phase 2B
City of Lake Charles, LA ~
This project will include construction of a new enclosed and conditioned pavilion building, parking area, picnic areas and a new playground. A new dock is included as alternate no 1.
The project has a total construction time of 210 calendar days.
The project has liquidated damages of $500 per calendar day.
| 11/03/2015 08:45 PM UTC |
Capital Project No. CP3212
Capital Project No. CP3212
1st Avenue Reconstruction Gieffers St. to Moeling St.
City of Lake Charles, LA ~
I. Scope of Work:
The City of Lake Charles desires to reconstruct four (4) blocks and associated intersections of the 1st Avenue roadway. Reconstruction will consist of existing pavement removal, general excavation, stone base construction and complete PCC pavement reconstruction of the roadway as funds permit not to exceed AFC of $800,000.00. The effected blocks of 1st Avenue upon which work is planned are as follows:
i. 1st Avenue PCC Repairs on the existing PCC blocks (Gieffers St. – Moeling Street)
| 10/20/2015 07:45 PM UTC |
Project No. CP3206
Capital Project No. CP3206
WWTP A Basin A-13 Rehabilitation Project
City of Lake Charles, LA ~
Scope of Work:
A. The City of Lake Charles WWTP ‘A’ is currently under a Compliance Order (CO) with LDEQ. The approved CO schedule requires the rehabilitation of 13 sub basins in the WWTP ‘A’ Basin. The Sub Basins have been prioritized and ranked in order of severity of condition through wastewater modeling of the system.
B. Based on review of CCTV data of the Sub-Basin, recommendations for repair have been made and a cost estimate has been developed.
C. This scope of work covers the repair of the collection system in the WWTP A Sub Basin A-13. The Work includes, but is not necessarily limited to, the following:
1. Pipe bursting approximately 11,300 linear feet of existing 6” and 8” sewer to new 8”.
2. Open cut replacement of approximately 5,000 linear feet of existing 6” and 8” sewer to new 8”.
3. Replacement of approximately 350 active sewer service laterals.
4. Coating approximately 160 vertical feet of existing and new manholes.
| 10/06/2015 07:45 PM UTC |
Project No. 2015-646, Capital Project No. 3109
PROJECT NO. 2015-646
CAPITAL PROJECT NO. 3109
MALLARD COVE GOLF COURSE NO. 8 HOLE IRRIGATION POND
SLOPE IMPROVEMENTS
CITY OF LAKE CHARLES, LA
SCOPE OF WORK
The general scope of work for Project No. 2015-646 includes improvement of the pond slope near the green for Hole No. 8 at Mallard Cove Golf Course using 3 x 1.5 limestone, as well as required drainage pipe extensions.
| 09/15/2015 07:45 PM UTC |
Project No. 2014-633, Capital Project No. CP3040, State Project No. H.010868
STATE PROJECT NO. H.010868
PROJECT NO. 2014-633
CAPITAL PROJECT NO. 3040
1ST AVENUE MULTI-USE TRAIL PART ONE
12TH STREET TO 7TH STREET
CITY OF LAKE CHARLES, LA
SCOPE OF WORK
The general scope of work for State Project No. H.010868, Project No. 2014-633, 1st Avenue Multi-Use Trail Part One, includes the installation of a new 8 foot wide asphalt trail and the associated concrete sidewalk connectivity enhancements on 1st Avenue from 12th Street North to 7th Street.
| 09/15/2015 07:45 PM UTC |
Project No. CP3003
Capital Project No. 3003
Lake Charles Civic Center Perimeter Power
Holiday Lighting Program Phase II
City of Lake Charles, LA ~
Provide and installing new in-ground pullboxes with electrical distribution capability in the area in front of the Civic Center (West side of Lakeshore Drive from Civic Center Main Entrance due south to Gill Street) and on south side of Gill Street between Lakeshore Drive and Bord Du Lac. Work includes a new 277/480V Service at Gill Street and Lakeshore Drive with capacity to feed a 480V 3 Phase lift station in the future.
| 08/18/2015 07:45 PM UTC |
Capital Project No. CP3210
Capital Project No. CP3210
Blake, Comeaux, Greinwich Village, and Griffin Coulee Lift Stations Rehabilitation
City of Lake Charles, LA ~
I. Scope of Services:
A. Blake Lift Station
1. Demolish existing building around station and replace with new hurricane fence with green slats around site.
2. Replace the two existing pumps with new submersible pumps on a rail system.
3. Replace all valves and valve vault lid. Expand valve vault to expose where the two pump discharge pipes combine into a single forcemain and install a permanent bypass connection.
4. Electrical improvements.
5. Coat wet well.
B. Comeaux Lift Station
1. Install green slats in existing hurricane fence.
2. Replace the two existing pumps with new submersible pumps on a rail system.
3. Replace all valves. Expand valve vault to install a permanent bypass connection.
4. Electrical Improvements.
5. Coat wet well.
C. Greinwich Village Lift Station
1. Demolish existing wooden fence and provide new hurricane fence with green slats.
2. Replace the two existing pumps with new submersible pumps on a rail system.
3. Improve top slab. Coat new wet well.
4. Improve discharge configuration.
5. Replace all valves and evaluate feasibility for permanent bypass connection.
6. Electrical Improvements.
7. Coat wet well.
D. Griffin Coulee Lift Station
1. Replace existing double door and windows.
2. Install green slats on existing hurricane fence.
3. Replace existing pumps with new dry pit submersible pumps.
4. Replace all valves.
5. New wet well access hatch.
6. Provide steps with handrail on entry to station.
7. Electrical Improvements.
8. Coat wet well.
| 08/04/2015 07:45 PM UTC |
Capital Project No. CP3219
Capital Project No. CP3219
George West Water Treatment Plant - Filter Media Replacement Project
City of Lake Charles, LA ~
I. Scope of Work:
a. George West Water Treatment Plant Filter Media Replacement
i. Replacement of Filter Media in Filters No. 1 – 6
ii. Estimated total volume needed: 3,400 ft3
iii. Work includes, placement, disinfection, conditioning, and start up
| 08/04/2015 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.