General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
12/17/2025 07:00 PM UTC
OSU-240045, James Care East Refresh
This project will update finishes on the 14th Floor of the OSU East hospital for the James Care East clinic. Updates include ceiling, flooring, and wall finishes. Improvements also include reconfiguration of infusion spaces and ADA upgrades.
12/19/2025 07:00 PM UTC
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24 REBID
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall and 209 Maintenance Building. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes two alternates which involve the removal and replacement of domestic cold water lines at Electroscience Laboratory and Plumb Hall.
12/22/2025 07:00 PM UTC
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
01/05/2026 07:00 PM UTC
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
01/12/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-220052 Campus Traffic Signal Upgrades
Establish fiber optic communication with OSU owned traffic signal and the City of Columbus CTSS.
08/07/2023 06:00 PM UTC
OSU-220071 Exterior Door Control Upgrades FY 22
This project will upgrade door operators in various buildings on campus.
08/03/2023 07:00 PM UTC
OSU-210669, OSUWMC - Anesthetizing Location
Doan Hall/Rhodes Hall and Ross Heart Hospital spaces: At areas as indicated on drawings work for Med Gas Upgrades includes: Addition or replacement of Zone Valve Boxes, Alarm Panels, and installation of new outlets at use spots, or replacement of existing outlets to Med Gas. Work also including piping above ceilings and down walls to all new devices and connection to existing. Patching, repair, priming, and paint and/or replacement of finishes is limited to areas where work is being performed.
07/31/2023 06:00 PM UTC
OSU-200080, Riffe - Room 137 Helium Recovery System
OSU Columbus: The project includes work on the first floor of the Riffe Building to accommodate a new Helium recovery system. Work within Riffe Building is primarily located within the first floor, room R145. Work includes the selective demolition of existing elements to fully renovate approximately 300 sf of an existing laboratory into a new equipment room with new mezzanine level. Limited work also occurs on upper levels and at the roof to accommodate new mechanical equipment and piping pathways. Work includes but is not limited to General Trades, Abatement, HVAC, Electrical and Plumbing.
07/25/2023 06:00 PM UTC
OSU-220298, Lima - Reed Hall Theatre Upgrades
OSU Lima: This project consists of the construction of 4,000 SF interior renovation of the existing theatre in Reed Hall (4240 Campus Drive- Lima, Ohio 45804). The renovation includes refinishing the existing ceiling and upgrades to lighting and mechanical systems.
07/25/2023 06:00 PM UTC
OSU-210651 Faculty Club - Elevator Replacement
Faculty Club - Elevator Replacement - 181 S Oval Mall Columbus, OH 43210. This project will replace the elevator.
07/24/2023 06:00 PM UTC
OSU-221103, Crane - Orthopedic Immediate Care Clinic
Tenant improvements of approximately 4,590 sf on the second floor and 130 sf on the third floor to convert shelled space into office, exam, check-out and storage areas matching the finishes of the existing building. Work includes partition walls, doors, borrowed lites, finishes, fire protection, plumbing, mechanical, electrical and data installation.
06/22/2023 06:00 PM UTC
OSU-230113 - Campus Hardscape Improvements
This project will improve hardscapes around the OSU Columbus Campus
06/15/2023 06:00 PM UTC
OSU-230025 Airport - Taxiway E, Rehabilitation
The Ohio State University Airport/Don Scott Field (KOSU) is home to 150 aircraft and sees an estimated 90,000 flight operations per year. This is the primary facility serving The Ohio State University and the surrounding central Ohio community. KOSU has been identified as a “National Priority” general aviation airport by the FAA, is a Part 139 Certificated Airport, and serves as a general aviation reliever for John Glenn International Airport. As part of this project, the Airport looks to rehabilitate / reconstruct Taxiway E. Taxiway will need rehabilitated to support the aircraft type and keep taxiing aircraft safe.
05/30/2023 06:00 PM UTC
OSU-210272 Electrical Renovations FY 2021
Replace main electrical distribution equipment in the OSU’s Agricultural Engineering Building including switchboards, motor control centers, and panelboards. Upgrade egress lighting system. Separate standby and life safety emergency loads.
05/30/2023 05:00 PM UTC
131 - 140 of 593 Solicitations
1 2 10 11 12 14 16 17 18 59 60