The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
| 10/01/2026 06:00 PM UTC |
|
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
| 10/01/2026 06:00 PM UTC |
|
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included.
All noisy work is to occur after normal operating hours.
| 10/06/2026 06:00 PM UTC |
|
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms
670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
| 10/08/2026 06:00 PM UTC |
|
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
| 10/12/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
Project OSU-230111 Road/Bridge Renewal FY23/24 RB 4
The planned scope of work includes rehabilitation of two bridges on The Ohio State University’s Main Campus: Woody Hayes over Olentangy River Road, Woody Hayes over Olentangy River. Maintenance level repairs generally include concrete patching/repairs, concrete walk repairs/replacement, joint and crack sealing, and deck sealing and repairs.
| 12/11/2024 07:00 PM UTC |
|
OSU-230499 Tunnel Rehabilitation Phase I BP 2
The project consists of the removal and replacement of the North McCracken tunnel roof, the complete removal of the North McCracken tunnel bypass, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct a new steam line within the North McCracken Tunnel. Under the Alternate 1 scope of work, a new water main will be constructed from the east end of the Oval to the west end and then up to the Cockins/Dulles loading dock area. The Alternate 2 scope of work provides alternate restoration methods to the North Oval Mall.
| 12/06/2024 06:00 PM UTC |
|
OSU-240260, Newton - Lab Renovations
This project will renovate about 3,000 SF of existing space on the first floor of Newton Hall for Research Labs for the College of Nursing. Their current space is in the basement of the building so moving the Labs to the first floor will provide much more visibility. The required spaces will include a Flexible Laboratory, Tissue Culture Laboratory, Work Area, Freezer Rooms, Imaging Room, and Director’s Office.
| 12/05/2024 07:00 PM UTC |
|
OSU-250002 - Ohio Stadium - Heat Trace to Piping (Phase 2)
This project is to add new heat trace to existing Ohio Stadium piping.
| 11/20/2024 07:00 PM UTC |
|
OSU-221019, Pressey - 90/92 ULAR Expansion
1. INTERIOR PROJECT TO CONVERT AN EXISTING COMMON SPACE AT THE LOWER LEVEL OF PRESSEY HALL INTO TWO NEW ANIMAL HOLDING ROOMS.
2. THE TWO NEW HOLDING ROOMS WILL BE SERVED BY AN EXPANDED HVAC SYSTEM, LOCAL FIRE-PROTECTION SYSTEM, AND ANIMAL WATERING SYSTEM. ELECTRICAL CONNECTIONS WILL BE MADE BACK TO EXISTING PANELS.
| 11/15/2024 07:00 PM UTC |
|
OSU-230109 Emergency Generator Replacement FY23 24
Replace existing diesel generator with new diesel generator and separate electrical distribution system into life safety, stand-by, and fire pump in accordance with NEC. The generator, and diesel day tank shall be located interior to the building with a remote radiator. Demolition of abandoned equipment will be required for installation of new generator.
| 10/31/2024 05:00 PM UTC |
|
OSU-240566 - Molecular Microbiology Lab Renovation
This project includes the renovation of two vacant laboratory rooms into space for a new molecular microbiology lab. Work includes but is not limited to demolition, access controls, finishes, plumbing, HVAC, Electrical, Technology and Fire Protection. This project will be constructed in multiple phases
| 10/30/2024 06:00 PM UTC |
|
OSU-230107 Electrical Renovation FY 23-24 BP#2
Replace main electrical distribution equipment in The Ohio State
University’s Cockins Hall.
| 10/30/2024 05:00 PM UTC |
|
OSU-240495 - Airport - Runway 9R/27L Drainage Improvements
This project involves the installation of HDPE culvert pipes and other
stormwater structures on both ends of Runway 9/27.n
| 10/17/2024 06:00 PM UTC |
|
OSU-240566, Molecular Microbiology Lab Renovation
This project includes the renovation of two vacant laboratory rooms
into space for a new molecular microbiology lab. Work includes but
is not limited to demolition, access controls, finishes, plumbing,
HVAC, Electrical, Technology and Fire Protection. This project will
be constructed in multiple phases.
| 10/11/2024 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.