General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
12/17/2025 07:00 PM UTC
OSU-240045, James Care East Refresh
This project will update finishes on the 14th Floor of the OSU East hospital for the James Care East clinic. Updates include ceiling, flooring, and wall finishes. Improvements also include reconfiguration of infusion spaces and ADA upgrades.
12/19/2025 07:00 PM UTC
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24 REBID
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall and 209 Maintenance Building. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes two alternates which involve the removal and replacement of domestic cold water lines at Electroscience Laboratory and Plumb Hall.
12/22/2025 07:00 PM UTC
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
01/05/2026 07:00 PM UTC
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
01/12/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-220456 12th Ave Dom Water & Sanitary
Replacement of waterline and sanitary sewer along west 12th Ave between High Street and College Street. All site work to be performed between May 20 and August 2, 2024.
12/05/2023 06:00 PM UTC
OSU-210264 Emergency Generator REBID
Enter Project Name and Location
11/20/2023 06:00 PM UTC
OSU-220520 Building Control Upgrades FY22
This project includes the replacement of the existing Johnson Controls Systems for Stillman Hall, Hagerty Hall, Hopkins Hall and Commissary with Delta Controls.
11/16/2023 07:00 PM UTC
OSU-210270 Plumbing Repairs - Veterinary Medical Center
Replacement of existing galvanized steel cold water piping. Installation of new piping prior to demolition of active mains. Removal of all obsolete piping. Replacement of aging valves in the hot and cold water system. Select underslab sanitary work to fix known issues. Replacement of flooring in areas of underslab work. Select above ceiling sanitary work to fix known issues/leaks. Abatement of select valves and flooring mastic. All work required for installation in an active and occupied veterinary hospital facility
11/16/2023 06:00 PM UTC
OSU-230458, East Tower - ADA Improvements REBID
The scope of work in the East Main Building is as identified: Raise the existing drinking fountain outside of toilet rooms R219T & R221T. The scope of work in the East Tower is as identified: Full renovation to ADA improvements for toilet rooms T033T, T034T, C104T and C200T. The existing registration desk located in C141 will need to be renovated to meet ADA. The main entry vestibule will require the removal of the existing walk-off mat and replacement in like-kind. PHASE I: R219T, R221T, C104T and C141 Reception Desk. PHASE II: T033T, T034T, C200T and Vestibule.
11/15/2023 07:00 PM UTC
OSU-221027, Stillman - Corridor and 4th Floor Renovation (REBID)
Columbus Campus: The scope of work includes a single-phase renovation of the following Areas: Suite 400 2,329 SF, 4th Floor Corridor 1,308 SF, 3rd Floor Corridor 1,348 SF, 2nd Floor Corridor 1,513 SF and Area 425X 265 SF in Suite 425.
10/27/2023 06:00 PM UTC
OSU-200080 Riffe - Room 137 Helium Recovery System
The project includes work on the first floor of the Riffe Building to accommodate a new Helium recovery system. Work within Riffe Building is primarily located within the first floor, room R145. Work includes the selective demolition of existing elements to fully renovate approximately 300 sf of an existing laboratory into a new equipment room with new mezzanine level. Limited work also occurs on upper levels and at the roof to accommodate new mechanical equipment and piping pathways. Work includes but is not limited to General Trades, Abatement, HVAC, Electrical and Plumbing.
10/26/2023 06:00 PM UTC
OSU-230038 Newark - Reese Center Boiler and Chiller Replacements
This project will replace the existing water-cooled chiller, repair the existing cooling tower and replace the existing gas-fired boilers.
10/20/2023 06:00 PM UTC
OSU-230458, East Tower - ADA Improvements
The scope of work in the East Main Building is as identified: Raise the existing drinking fountain outside of toilet rooms R219T & R221T. The scope of work in the East Tower is as identified: Full renovation to ADA improvements for toilet rooms T033T, T034T, C104T and C200T. The existing registration desk located in C141 will need to be renovated to meet ADA. The main entry vestibule will require the removal of the existing walk-off mat and replacement in like-kind. PHASE I: R219T, R221T, C104T and C141 Reception Desk. PHASE II: T033T, T034T, C200T and Vestibule.
10/13/2023 06:00 PM UTC
OSU-220764, Graves - Rooms 3185 & 3189 Conversion
Interior improvements of approximately 1,548 sf. in two rooms on Graves Hall Third Floor to convert office space into research lab space. Work includes new partition walls, doors, finishes, plumbing, mechanical, electrical, and data improvements. Add Alternates include #1) All work related to enlarging current corridor doors (including modification of CMU corridor walls).
10/11/2023 06:00 PM UTC
111 - 120 of 593 Solicitations
1 2 8 9 10 12 14 15 16 59 60