OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26
SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory.
PVC Membrane Roof Replacement at Independence Hall.
Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
| 05/22/2026 06:00 PM UTC |
|
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
| 05/28/2026 06:00 PM UTC |
|
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
| 06/05/2026 06:00 PM UTC |
|
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
| 06/09/2026 06:00 PM UTC |
|
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
| 06/18/2026 05:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-210264 Emergency Generator REBID
Enter Project Name and Location
| 11/20/2023 06:00 PM UTC |
|
OSU-220520 Building Control Upgrades FY22
This project includes the replacement of the existing Johnson
Controls Systems for Stillman Hall, Hagerty Hall, Hopkins Hall and
Commissary with Delta Controls.
| 11/16/2023 07:00 PM UTC |
|
OSU-210270 Plumbing Repairs - Veterinary Medical Center
Replacement of existing galvanized steel cold water piping.
Installation of new piping prior to demolition of active mains. Removal
of all obsolete piping. Replacement of aging valves in the hot and
cold water system. Select underslab sanitary work to fix known
issues. Replacement of flooring in areas of underslab work. Select
above ceiling sanitary work to fix known issues/leaks. Abatement of
select valves and flooring mastic. All work required for installation in
an active and occupied veterinary hospital facility
| 11/16/2023 06:00 PM UTC |
|
OSU-230458, East Tower - ADA Improvements REBID
The scope of work in the East Main Building is as identified: Raise the existing drinking fountain outside of toilet rooms R219T & R221T. The scope of work in the East Tower is as identified: Full renovation to ADA improvements for toilet rooms T033T, T034T, C104T and C200T. The existing registration desk located in C141 will need to be renovated to meet ADA. The main entry vestibule will require the removal of the existing walk-off mat and replacement in like-kind.
PHASE I: R219T, R221T, C104T and C141 Reception Desk.
PHASE II: T033T, T034T, C200T and Vestibule.
| 11/15/2023 07:00 PM UTC |
|
OSU-221027, Stillman - Corridor and 4th Floor Renovation (REBID)
Columbus Campus: The scope of work includes a single-phase renovation of the following Areas: Suite 400 2,329 SF, 4th Floor Corridor 1,308 SF, 3rd Floor Corridor 1,348 SF, 2nd Floor Corridor 1,513 SF and Area 425X 265 SF in Suite 425.
| 10/27/2023 06:00 PM UTC |
|
OSU-200080 Riffe - Room 137 Helium Recovery System
The project includes work on the first floor of the Riffe Building to accommodate a new Helium recovery system. Work within Riffe Building is primarily located within the first floor, room R145. Work includes the selective demolition of existing elements to fully renovate approximately 300 sf of an existing laboratory into a new equipment room with new mezzanine level. Limited work also occurs on upper levels and at the roof to accommodate new mechanical equipment and piping pathways. Work includes but is not limited to General Trades, Abatement, HVAC, Electrical and Plumbing.
| 10/26/2023 06:00 PM UTC |
|
OSU-230038 Newark - Reese Center Boiler and Chiller Replacements
This project will replace the existing water-cooled chiller, repair the existing cooling tower and replace the existing gas-fired boilers.
| 10/20/2023 06:00 PM UTC |
|
OSU-230458, East Tower - ADA Improvements
The scope of work in the East Main Building is as identified: Raise the existing drinking fountain outside of toilet rooms R219T & R221T. The scope of work in the East Tower is as identified: Full renovation to ADA improvements for toilet rooms T033T, T034T, C104T and C200T. The existing registration desk located in C141 will need to be renovated to meet ADA. The main entry vestibule will require the removal of the existing walk-off mat and replacement in like-kind.
PHASE I: R219T, R221T, C104T and C141 Reception Desk.
PHASE II: T033T, T034T, C200T and Vestibule.
| 10/13/2023 06:00 PM UTC |
|
OSU-220764, Graves - Rooms 3185 & 3189 Conversion
Interior improvements of approximately 1,548 sf. in two rooms on Graves Hall Third Floor to convert office space into research lab space. Work includes new partition walls, doors, finishes, plumbing, mechanical, electrical, and data improvements. Add Alternates include #1) All work related to enlarging current corridor doors (including modification of CMU corridor walls).
| 10/11/2023 06:00 PM UTC |
|
OSU-210740 Jennings - Envelope Repair
Domes copper roof replacement, stone re-pointing and terra cotta
restoration.
| 10/10/2023 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.