The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-210742, Arps - Masonry & Parapet
OSU Columbus Campus: Masonry wall repairs and low-slope roof replacement for Arps Hall.
| 04/06/2026 06:00 PM UTC |
|
OSU-250040 Fire Systems Renovations - FY25-26
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
| 04/08/2026 06:00 PM UTC |
|
OSU-255631, Morehouse Medical Plaza - Concourse - Medical Gas Enclosure and Upgrade
This project entails the addition of a new dedicated medical gas
storage enclosure at the facility to safely house increased medical oxygen cylinder capacity in compliance with NFPA 99 standards, featuring secure noncombustible construction, proper ventilation, cylinder restraints, and required safety signage. The scope includes installation of additional medical oxygen drops in targeted patient care areas via new copper piping, zone valves, and alarm integrations, along with the strategic relocation of existing medical gas equipment to optimize accessibility, maintenance, and system redundancy. All work will involve phased implementation to minimize disruptions, full system purging, pressure testing, third party certification, and verification to ensure code-compliant, safe, and reliable medical gas delivery supporting current operations and future facility expansion.
| 04/10/2026 06:00 PM UTC |
|
OSU-250039 Elevator Renovations - FY 25-26
Elevator Modernization and related architectural and MEP scopes of work at Pressey Hall on OSU’s Main Campus.
| 04/16/2026 06:02 PM UTC |
|
OSU-230102 Roof Renewal FY23-24 BP 1
Work includes roof replacements on Agriculture Administration or “Ag Admin”, located at The Ohio State University Columbus Campus in Columbus, Ohio
| 04/23/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-220236, Lima- Public Service Building Renovation
OSU Lima: 3,600 sf renovation of the existing Public Service Building and HVAC upgrades.
| 09/18/2023 06:00 PM UTC |
|
OSU-220221 OSUE West Parking Lot
Construction of a new parking lot to the west of Hughes Street on the
western edge of the OSU East Hospital Complex.)
| 09/13/2023 05:00 PM UTC |
|
OSU-230203, Harding - First Floor Restrooms
A two phased renovation of the existing public restrooms located on the first floor of Ohio State Harding Hospital, 1670 Upham Drive in Columbus, Ohio. The project scope includes Rooms 100T (Women’s 212 SF), 101T (Men’s 174 SF), 115T (Men’s 34 SF), 116T (Women’s 34 SF), 118T (Women’s 122 SF), 119T (Men’s 122 SF), 111T (Unisex 39 SF) and 112T (Unisex 39SF). Restrooms 100T and 101T will need to be ADA Accessible. Alternate G-1 will be an Add Alternate to provide new doors and hardware for Restrooms 100T, 101T, 115T, 116T, 118T, and 119T. Rooms 111T and 112T will be designed and advertised as Add Alternate G-2 and will be equipped with anti-ligature fixtures and accessories.
Phases One Restrooms 100T, 101T, and 115T as well as 112T if Alternate G-2 is accepted,
Phase Two Restrooms 118T, 119T and 116T as well as 111T if Alternate G-2 is accepted.
| 08/31/2023 06:00 PM UTC |
|
OSU-190008, Road and Bridge Improvements, FY2019 Bid Package #4
Trash Compactor Storage Area-Hess Road Rehabilitation
| 08/15/2023 06:00 PM UTC |
|
OSU-210264 Emergency Generators
Replaces existing interior emergency generators at Sisson Hall and Agricultural (Ag) Engineering with exterior generators. Scope of work includes associated Civil, MEP, Fire Protection Systems, and Hazardous Material removal.
| 08/10/2023 05:00 PM UTC |
|
OSU-220052 Campus Traffic Signal Upgrades
Establish fiber optic communication with OSU owned traffic signal
and the City of Columbus CTSS.
| 08/07/2023 06:00 PM UTC |
|
OSU-220071 Exterior Door Control Upgrades FY 22
This project will upgrade door operators in various buildings on campus.
| 08/03/2023 07:00 PM UTC |
|
OSU-210669, OSUWMC - Anesthetizing Location
Doan Hall/Rhodes Hall and Ross Heart Hospital spaces: At areas as indicated on drawings work for Med Gas Upgrades includes: Addition or replacement of Zone Valve Boxes, Alarm Panels, and installation of new outlets at use spots, or replacement of existing outlets to Med Gas. Work also including piping above ceilings and down walls to all new devices and connection to existing. Patching, repair, priming, and paint and/or replacement of finishes is limited to areas where work is being performed.
| 07/31/2023 06:00 PM UTC |
|
OSU-200080, Riffe - Room 137 Helium Recovery System
OSU Columbus: The project includes work on the first floor of the Riffe Building to accommodate a new Helium recovery system. Work within Riffe Building is primarily located within the first floor, room R145. Work includes the selective demolition of existing elements to fully renovate approximately 300 sf of an existing laboratory into a new equipment room with new mezzanine level. Limited work also occurs on upper levels and at the roof to accommodate new mechanical equipment and piping pathways. Work includes but is not limited to General Trades, Abatement, HVAC, Electrical and Plumbing.
| 07/25/2023 06:00 PM UTC |
|
OSU-220298, Lima - Reed Hall Theatre Upgrades
OSU Lima: This project consists of the construction of 4,000 SF interior renovation of the existing theatre in Reed Hall (4240 Campus Drive- Lima, Ohio 45804). The renovation includes refinishing the existing ceiling and upgrades to lighting and mechanical systems.
| 07/25/2023 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.