The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
| 12/17/2025 07:00 PM UTC |
|
OSU-240045, James Care East Refresh
This project will update finishes on the 14th Floor of the OSU East hospital for the James Care East clinic. Updates include ceiling, flooring, and wall finishes. Improvements also include reconfiguration of infusion spaces and ADA upgrades.
| 12/19/2025 07:00 PM UTC |
|
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24 REBID
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall and 209 Maintenance Building. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes two alternates which involve the removal and replacement of domestic cold water lines at Electroscience Laboratory and Plumb Hall.
| 12/22/2025 07:00 PM UTC |
|
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
| 01/05/2026 07:00 PM UTC |
|
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
| 01/12/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-220732 East - ADA Parking Lot
Project includes the pavement rehabilitation, replacement of curbing and concrete areas to bring the East – ADA Parking Lot up to current. Accessibility Code. The lot will be re-striped and signed per City of Columbus and Ohio ADA requirements.
| 05/26/2023 05:00 PM UTC |
|
OSU-220282, Airport - Taxiway A Rehabilitation (REBID)
OSU Airport: Phase 1 - Rehabilitation of Taxiway A
| 05/11/2023 06:00 PM UTC |
|
OSU - 220522 Mechanical Room Refreshes FY 22 (Re-Bid #3)
This project will Refresh mechanical rooms in multiple buildings.
| 05/04/2023 05:00 PM UTC |
|
OSU-210651, Faculty Club - Elevator Replacement
OSU Columbus: Replacement of existing elevator at Faculty Club and all associated scope of work.
| 04/18/2023 06:00 PM UTC |
|
OSU-220998, PAES - ExSci Lab Renovation
OSU Columbus: The project consists of 1,345 SF of office space renovation in the ground floor of the Physical Activity and Educational Services building (PAES), 305 Annie and John Glenn Avenue, at The Ohio State University. Locations of work include refresh of rooms A011, A012, A021, and A023. Scope includes demolition, interior finish upgrades, modification of existing building fire protection and electrical systems.
| 04/17/2023 06:00 PM UTC |
|
OSU-220051 Enhanced Maintenance FY 22
Aluminum window and aluminum storefront replacement and masonry structural wall and veneer and poured concrete envelope restoration for Postle Hall and Research Center buildings.
| 04/13/2023 07:00 PM UTC |
|
OSU-220282, Airport - Taxiway A Rehabilitation
OSU Airport: Phase 1 - Rehabilitation of Taxiway A
| 04/11/2023 06:00 PM UTC |
|
OSU-220259, 700 Ackerman - 4th Floor Improvements
Columbus Campus: The project will consist of the construction of approximately 7,040 Sf of existing office space within suite 400 on the 4th floor of the 700 Ackerman Place building. The renovation will include new entry, finish upgrades, along with mechanical plumbing and electrical upgrades.
| 03/31/2023 06:00 PM UTC |
|
OSU-210675, Ross - Suite H2260 CT Install and Renovation
Interior renovation to create a CT imaging suite, including imaging equipment and associated mechanical equipment, casework, finishes and accessories. Medical Center will continue to operate during construction. Contractor will follow all Medical Center ICRA and ILSM requirements.
| 03/30/2023 06:00 PM UTC |
|
OSU-220520 Mechanical Room Refreshes FY 22 (Re-Bid)
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork.
Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
| 03/29/2023 05:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.