General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
05/07/2025 05:00 PM UTC
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
05/13/2025 06:00 PM UTC
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
05/14/2025 06:00 PM UTC
OSU-240504-1 - Airport - Taxiway A, Phase 2
This project includes the milling of the existing asphalt surface on Taxiway A, full depth reclamation of remaining aggregate base, and asphalt paving. Also included is minor airfield electrical and pavement markings. The project is financed with grant assistance from the Federal Aviation Administration (FAA) and is subject to the Davis-Bacon Act and Related Provisions and compliance with FAA Buy American Preference.
05/20/2025 06:00 PM UTC
OSU-230401, 2001 Polaris Pkwy - Cell Therapy Lab
Site work and utility connections to 4 modular units. Connector vestibules to 2001 Approx 1000 SF steel framed addition. Approx 4000 SF interior alterations for research laboratories and support spaces.
05/21/2025 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-220480 Sullivant - AHU Duct Replacement
This project will replace the AHU ducts in Sullivant Hall, 1813 North High Street, Columbus, OH 43210
11/16/2022 05:00 PM UTC
OSU-220012 Wooster - National Greenhouse HVAC
This project will remove existing steam boiler, piping and heating equipment and provide new air distribution and heating equipment
11/11/2022 07:00 PM UTC
OSU-160980 Plumbing System Replacement BP3 REBID
This project will replace deteriorating plumbing systems.
11/04/2022 05:00 PM UTC
OSU-210236, Parks - 3rd Floor Lab Renovations
The project includes work on the third floor of Parks Hall. Work within Parks Hall is primarily located within the third floor in the South end of the building. Work includes the selective demolition of existing elements to fully renovate 4,600 sf of existing third floor laboratory (Suites 319, 323 and Rooms 316 and 320) into a new laboratory space. Work includes but is not limited to General Trades, Abatement, HVAC, Electrical and Plumbing.
11/03/2022 06:00 PM UTC
OSU-190865, Polaris - Cytogenetics Lab Expansion
Selective renovation for expansion of Cytogenetics Labs, including multiple lab areas and the addition of an additional emergency generator.
11/02/2022 06:00 PM UTC
OSU-210682 - Mansfield - Civic Plaza Improvements REBID
This project will create a new outdoor plaza area between Eisenhower Memorial Center and Conard Hall - approx. 4,000 SF
10/27/2022 06:00 PM UTC
OSU-210267 HVAC Repair and Replacements FY 21
This project will repair or replace HVAC systems across campus.
10/18/2022 06:00 PM UTC
OSU-210310, Graves - Pathology Renal Space Phase 1 and Phase 2 REBID
The project will consist of the construction of approximately 2100 SF of existing space into lab space and approximately 2175 SF of office space renovations in the basement of Graves Hall on the Columbus Campus of The Ohio State University, 333 W. 10th Ave., Columbus, Ohio.
10/14/2022 06:00 PM UTC
OSU-190025-BP2 Roof Replacements FY 2019
This project will replace roofs on various campus buildings.
10/12/2022 06:00 PM UTC
OSU-210287, Marion - Alber Student Center Renovation Ph 2 (REBID)
Marion Campus: Interior renovation and improvement of selected areas of the Alber Student Center, including the existing public restrooms, locker rooms, game room, and gymnasium.
10/05/2022 06:00 PM UTC
141 - 150 of 558 Solicitations
1 2 11 12 13 15 17 18 19 55 56