General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-210742, Arps - Masonry & Parapet
OSU Columbus Campus: Masonry wall repairs and low-slope roof replacement for Arps Hall.
04/06/2026 06:00 PM UTC
OSU-250040 Fire Systems Renovations - FY25-26
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
04/08/2026 06:00 PM UTC
OSU-255631, Morehouse Medical Plaza - Concourse - Medical Gas Enclosure and Upgrade
This project entails the addition of a new dedicated medical gas storage enclosure at the facility to safely house increased medical oxygen cylinder capacity in compliance with NFPA 99 standards, featuring secure noncombustible construction, proper ventilation, cylinder restraints, and required safety signage. The scope includes installation of additional medical oxygen drops in targeted patient care areas via new copper piping, zone valves, and alarm integrations, along with the strategic relocation of existing medical gas equipment to optimize accessibility, maintenance, and system redundancy. All work will involve phased implementation to minimize disruptions, full system purging, pressure testing, third party certification, and verification to ensure code-compliant, safe, and reliable medical gas delivery supporting current operations and future facility expansion.
04/10/2026 06:00 PM UTC
OSU-250039 Elevator Renovations - FY 25-26
Elevator Modernization and related architectural and MEP scopes of work at Pressey Hall on OSU’s Main Campus.
04/16/2026 06:02 PM UTC
OSU-230102 Roof Renewal FY23-24 BP 1
Work includes roof replacements on Agriculture Administration or “Ag Admin”, located at The Ohio State University Columbus Campus in Columbus, Ohio
04/23/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-220051 Enhanced Maintenance FY 22
Aluminum window and aluminum storefront replacement and masonry structural wall and veneer and poured concrete envelope restoration for Postle Hall and Research Center buildings.
04/13/2023 07:00 PM UTC
OSU-220282, Airport - Taxiway A Rehabilitation
OSU Airport: Phase 1 - Rehabilitation of Taxiway A
04/11/2023 06:00 PM UTC
OSU-220259, 700 Ackerman - 4th Floor Improvements
Columbus Campus: The project will consist of the construction of approximately 7,040 Sf of existing office space within suite 400 on the 4th floor of the 700 Ackerman Place building. The renovation will include new entry, finish upgrades, along with mechanical plumbing and electrical upgrades.
03/31/2023 06:00 PM UTC
OSU-210675, Ross - Suite H2260 CT Install and Renovation
Interior renovation to create a CT imaging suite, including imaging equipment and associated mechanical equipment, casework, finishes and accessories. Medical Center will continue to operate during construction. Contractor will follow all Medical Center ICRA and ILSM requirements.
03/30/2023 06:00 PM UTC
OSU-220520 Mechanical Room Refreshes FY 22 (Re-Bid)
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
03/29/2023 05:00 PM UTC
OSU-210270 - Plumbing Repairs VMC
Replacement of existing galvanized steel cold water piping. Installation of new piping prior to demolition of active mains. Removal of all obsolete piping. Replacement of aging valves in the hot and cold-water system. Select under slab sanitary work to fix known issues. Replacement of flooring in areas of under slab work. Select above ceiling sanitary work to fix known issues/leaks. Abatement of select valves and flooring mastic. All work required for installation in an active and occupied veterinary hospital facility.
03/24/2023 05:00 PM UTC
OSU-220281, Airport - Terminal Apron Rehabilitation
OSU Airport: Phase 1 Rehabilitation of Terminal Apron from Asphalt to Concrete.
03/21/2023 06:00 PM UTC
OSU-200514 Eye & Ear Institute Parking Lot Repaving
This project will repave the parking lot and main drive along with other improvements.
03/16/2023 06:00 PM UTC
OSU-220611 11th Avenue Conversion
This project will convert 11th Avenue
03/03/2023 07:00 PM UTC
OSU-220522 Mechanical Room Refreshes FY 22
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications.
02/28/2023 06:00 PM UTC
161 - 170 of 608 Solicitations
1 2 13 14 15 17 19 20 21 60 61