Number Deadline
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
05/07/2025 05:00 PM UTC
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
05/13/2025 06:00 PM UTC
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
05/14/2025 06:00 PM UTC
OSU-240504-1 - Airport - Taxiway A, Phase 2
This project includes the milling of the existing asphalt surface on Taxiway A, full depth reclamation of remaining aggregate base, and asphalt paving. Also included is minor airfield electrical and pavement markings. The project is financed with grant assistance from the Federal Aviation Administration (FAA) and is subject to the Davis-Bacon Act and Related Provisions and compliance with FAA Buy American Preference.
05/20/2025 06:00 PM UTC
OSU-230401, 2001 Polaris Pkwy - Cell Therapy Lab
Site work and utility connections to 4 modular units. Connector vestibules to 2001 Approx 1000 SF steel framed addition. Approx 4000 SF interior alterations for research laboratories and support spaces.
05/21/2025 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-210096, Doan-Rhodes - Replace Imaging Equipment REBID
Replaces two existing fluoroscopy rooms and a nuclear medicine camera along with renovation of surrounding support spaces including an existing toilet to comply with ADA. Scope of work includes associated MEP, Fire Protection Systems, and Hazardous Material removal. The work is to be performed in three phases. Phase One – the Zee MP and Spect CT areas; Phase Two – the Agile area; and Phase Three – the technician work area.
07/29/2022 06:00 PM UTC
OSU-200591, Lima - Galvin Hall Basement Renovation
Lima Campus: The project will renovate approximately 10,022 SF on the Basement Level. The scope of the project is to expand the Student Activity Spaces; rooms include a Commons, Student Lounge, Game Room, Catering Kitchen, Kitchenette, Huddle Rooms, Conference Space, Offices and an Exterior Patio Space directly outside the Commons.
07/26/2022 06:00 PM UTC
OSU-220008 - Neil Ave Building-Cooling Tower Replacement
This project will replace the cooling tower in the Neil Avenue Building.
07/26/2022 06:00 PM UTC
OSU-210329 650 Ackerman Roof Replacement
This project will replace the existing roof, make repairs to the existing deck, and add a roof drain and insulation to improve drainage.
07/21/2022 06:00 PM UTC
OSU-210268 Elevator Safety Repairs and Replacements
Elevator Modernization and related architectural and MEP scopes of work for a total of 7 elevators in 4 buildings on OSU’s Main Campus: Arps Hall (1 passenger elevator base bid) Dulles Hall (2 passenger elevators base bid) Smith Lab (1 passenger, base bid and 1 Freight Elevator, Alternate) University Hall (2 elevators base bid)
06/29/2022 06:00 PM UTC
OSU-200377, Waterman Dairy Improvements
Renovations to the existing Waterman Main Dairy Barn to convert the existing tie stall barn to a free stall barn with new robotic milking, feed, and manure systems. The project will also upgrade the building electrical service and add a new generator.
06/22/2022 06:00 PM UTC
OSU-190279, Wooster - GDAL Swine Finishing
Wooster Campus: Provide and install a new prefabricated, modular building structure, site preparation and all supporting utility infrastructure.
06/21/2022 06:00 PM UTC
OSU-210096, Doan-Rhodes - Replace Imaging Equipment REBID
Replaces two existing fluoroscopy rooms and a nuclear medicine camera along with renovation of surrounding support spaces including an existing toilet to comply with ADA. Scope of work includes associated MEP, Fire Protection Systems, and Hazardous Material removal. The work is to be performed in three phases. Phase One – the Zee MP and Spect CT areas; Phase Two – the Agile area; and Phase Three – the technician work area.
06/21/2022 06:00 PM UTC
OSU-200183 Med Center Traffic Control Devices
Improve crosswalks and traffic control devices for pedestrian safety at the OSU Wexner Medical Center and Health Science areas.
06/15/2022 03:00 PM UTC
OSU-220611 11th Avenue Conversion - Bid Package 1
Convert 11th Avenue to two way traffic between Neil Ave and College Road and add bus stops.
06/14/2022 06:00 PM UTC