General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
10/01/2026 06:00 PM UTC
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
10/01/2026 06:00 PM UTC
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included. All noisy work is to occur after normal operating hours.
10/06/2026 06:00 PM UTC
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms 670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
10/08/2026 06:00 PM UTC
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
10/12/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-220456 12th Ave Dom Water & Sanitary
Replacement of waterline and sanitary sewer along west 12th Ave between High Street and College Street. All site work to be performed between May 20 and August 2, 2024.
12/05/2023 06:00 PM UTC
OSU-210264 Emergency Generator REBID
Enter Project Name and Location
11/20/2023 06:00 PM UTC
OSU-220520 Building Control Upgrades FY22
This project includes the replacement of the existing Johnson Controls Systems for Stillman Hall, Hagerty Hall, Hopkins Hall and Commissary with Delta Controls.
11/16/2023 07:00 PM UTC
OSU-210270 Plumbing Repairs - Veterinary Medical Center
Replacement of existing galvanized steel cold water piping. Installation of new piping prior to demolition of active mains. Removal of all obsolete piping. Replacement of aging valves in the hot and cold water system. Select underslab sanitary work to fix known issues. Replacement of flooring in areas of underslab work. Select above ceiling sanitary work to fix known issues/leaks. Abatement of select valves and flooring mastic. All work required for installation in an active and occupied veterinary hospital facility
11/16/2023 06:00 PM UTC
OSU-230458, East Tower - ADA Improvements REBID
The scope of work in the East Main Building is as identified: Raise the existing drinking fountain outside of toilet rooms R219T & R221T. The scope of work in the East Tower is as identified: Full renovation to ADA improvements for toilet rooms T033T, T034T, C104T and C200T. The existing registration desk located in C141 will need to be renovated to meet ADA. The main entry vestibule will require the removal of the existing walk-off mat and replacement in like-kind. PHASE I: R219T, R221T, C104T and C141 Reception Desk. PHASE II: T033T, T034T, C200T and Vestibule.
11/15/2023 07:00 PM UTC
OSU-221027, Stillman - Corridor and 4th Floor Renovation (REBID)
Columbus Campus: The scope of work includes a single-phase renovation of the following Areas: Suite 400 2,329 SF, 4th Floor Corridor 1,308 SF, 3rd Floor Corridor 1,348 SF, 2nd Floor Corridor 1,513 SF and Area 425X 265 SF in Suite 425.
10/27/2023 06:00 PM UTC
OSU-200080 Riffe - Room 137 Helium Recovery System
The project includes work on the first floor of the Riffe Building to accommodate a new Helium recovery system. Work within Riffe Building is primarily located within the first floor, room R145. Work includes the selective demolition of existing elements to fully renovate approximately 300 sf of an existing laboratory into a new equipment room with new mezzanine level. Limited work also occurs on upper levels and at the roof to accommodate new mechanical equipment and piping pathways. Work includes but is not limited to General Trades, Abatement, HVAC, Electrical and Plumbing.
10/26/2023 06:00 PM UTC
OSU-230038 Newark - Reese Center Boiler and Chiller Replacements
This project will replace the existing water-cooled chiller, repair the existing cooling tower and replace the existing gas-fired boilers.
10/20/2023 06:00 PM UTC
OSU-230458, East Tower - ADA Improvements
The scope of work in the East Main Building is as identified: Raise the existing drinking fountain outside of toilet rooms R219T & R221T. The scope of work in the East Tower is as identified: Full renovation to ADA improvements for toilet rooms T033T, T034T, C104T and C200T. The existing registration desk located in C141 will need to be renovated to meet ADA. The main entry vestibule will require the removal of the existing walk-off mat and replacement in like-kind. PHASE I: R219T, R221T, C104T and C141 Reception Desk. PHASE II: T033T, T034T, C200T and Vestibule.
10/13/2023 06:00 PM UTC
OSU-220764, Graves - Rooms 3185 & 3189 Conversion
Interior improvements of approximately 1,548 sf. in two rooms on Graves Hall Third Floor to convert office space into research lab space. Work includes new partition walls, doors, finishes, plumbing, mechanical, electrical, and data improvements. Add Alternates include #1) All work related to enlarging current corridor doors (including modification of CMU corridor walls).
10/11/2023 06:00 PM UTC
161 - 170 of 643 Solicitations
1 2 … 13 14 15 17 19 20 21 … 64 65