The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26
SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory.
PVC Membrane Roof Replacement at Independence Hall.
Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
| 05/22/2026 06:00 PM UTC |
|
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
| 05/28/2026 06:00 PM UTC |
|
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
| 06/05/2026 06:00 PM UTC |
|
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
| 06/09/2026 06:00 PM UTC |
|
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
| 06/18/2026 05:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-220071 Exterior Door Control Upgrades FY 22
This project will upgrade door operators in various buildings on campus.
| 08/03/2023 07:00 PM UTC |
|
OSU-210669, OSUWMC - Anesthetizing Location
Doan Hall/Rhodes Hall and Ross Heart Hospital spaces: At areas as indicated on drawings work for Med Gas Upgrades includes: Addition or replacement of Zone Valve Boxes, Alarm Panels, and installation of new outlets at use spots, or replacement of existing outlets to Med Gas. Work also including piping above ceilings and down walls to all new devices and connection to existing. Patching, repair, priming, and paint and/or replacement of finishes is limited to areas where work is being performed.
| 07/31/2023 06:00 PM UTC |
|
OSU-200080, Riffe - Room 137 Helium Recovery System
OSU Columbus: The project includes work on the first floor of the Riffe Building to accommodate a new Helium recovery system. Work within Riffe Building is primarily located within the first floor, room R145. Work includes the selective demolition of existing elements to fully renovate approximately 300 sf of an existing laboratory into a new equipment room with new mezzanine level. Limited work also occurs on upper levels and at the roof to accommodate new mechanical equipment and piping pathways. Work includes but is not limited to General Trades, Abatement, HVAC, Electrical and Plumbing.
| 07/25/2023 06:00 PM UTC |
|
OSU-220298, Lima - Reed Hall Theatre Upgrades
OSU Lima: This project consists of the construction of 4,000 SF interior renovation of the existing theatre in Reed Hall (4240 Campus Drive- Lima, Ohio 45804). The renovation includes refinishing the existing ceiling and upgrades to lighting and mechanical systems.
| 07/25/2023 06:00 PM UTC |
|
OSU-210651 Faculty Club - Elevator Replacement
Faculty Club - Elevator Replacement - 181 S Oval Mall
Columbus, OH 43210. This project will replace the elevator.
| 07/24/2023 06:00 PM UTC |
|
OSU-221103, Crane - Orthopedic Immediate Care Clinic
Tenant improvements of approximately 4,590 sf on the second floor and 130 sf on the third floor to convert shelled space into office, exam, check-out and storage areas matching the finishes of the existing building. Work includes partition walls, doors, borrowed lites, finishes, fire protection, plumbing, mechanical, electrical and data installation.
| 06/22/2023 06:00 PM UTC |
|
OSU-230113 - Campus Hardscape Improvements
This project will improve hardscapes around the OSU Columbus Campus
| 06/15/2023 06:00 PM UTC |
|
OSU-230025 Airport - Taxiway E, Rehabilitation
The Ohio State University Airport/Don Scott Field (KOSU) is home to 150 aircraft and sees an estimated 90,000 flight operations per year. This is the primary facility serving The Ohio State University and the surrounding central Ohio community. KOSU has been identified as a “National Priority” general aviation airport by the FAA, is a Part 139 Certificated Airport, and serves as a general aviation reliever for John Glenn International Airport.
As part of this project, the Airport looks to rehabilitate / reconstruct Taxiway E. Taxiway will need rehabilitated to support the aircraft type and keep taxiing aircraft safe.
| 05/30/2023 06:00 PM UTC |
|
OSU-210272 Electrical Renovations FY 2021
Replace main electrical distribution equipment in the OSU’s
Agricultural Engineering Building including switchboards, motor
control centers, and panelboards. Upgrade egress lighting system.
Separate standby and life safety emergency loads.
| 05/30/2023 05:00 PM UTC |
|
OSU-220732 East - ADA Parking Lot
Project includes the pavement rehabilitation, replacement of curbing and concrete areas to bring the East – ADA Parking Lot up to current. Accessibility Code. The lot will be re-striped and signed per City of Columbus and Ohio ADA requirements.
| 05/26/2023 05:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.