General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
10/01/2026 06:00 PM UTC
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
10/01/2026 06:00 PM UTC
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included. All noisy work is to occur after normal operating hours.
10/06/2026 06:00 PM UTC
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms 670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
10/08/2026 06:00 PM UTC
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
10/12/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-230246, EEI - 4th Floor Otolaryngology Redesign
Tenant improvements of approximately 1,364sf on the fourth floor of the EEI Building, to accommodate a new Otolaryngology Research suite. The project will create a large staff workroom with conferencing capabilities, an Exam Room for a portable c-arm and conferencing capabilities, and minor upgrades to an Observation Room and Office.
03/13/2024 06:00 PM UTC
OSU-220591, East - Tower 6 Renovation
Renovation of the existing 6th floor of the patient tower: Approximately 10,450 square feet of patient rooms, corridors, nurses’ station and accessory functions. Patient rooms and corridors include primarily refresh, while the center core area will be reconfigured with associated mechanical, plumbing, electrical and life safety items.
03/12/2024 06:00 PM UTC
OSU-230499 Tunnel Rehabilitation Phase I
The project consists of the removal and abandonment of tunnels on the University’s Midwest campus. The removal and abandonment of tunnels includes the removal of abandoned piping within the tunnels. New direct buried steam, communications, and medium-voltage electric lines will need to be installed as part of the project’s scope of work as well
03/07/2024 03:00 PM UTC
OSU-230107 Electrical Renovations FY23-24
Replace main electrical distribution equipment in The Ohio State University’s Caldwell Laboratory Building and Cockins Hall Building including switchboards and panelboards, upgrade egress lighting systems, and provide circuit tracing and receptacle replacement.
03/04/2024 06:00 PM UTC
OSU-230111 Road/Bridge Renewal FY23-24
The planned scope of work includes rehabilitation three bridges on The Ohio State University’s Main Campus: Woody Hayes over Olentangy River Road, Woody Hayes over Olentangy River, and Drake Pedestrian Bridge over Olentangy River Road and River. Maintenance level repairs generally include concrete patching/repairs, concrete walk repairs/replacement, joint and crack sealing, and deck sealing and repairs
03/01/2024 07:00 PM UTC
OSU-230517 - Ohio Union - CCTV Upgrade
This project will complete a full replacement of the CCTV system at The Ohio State University Ohio Union Building.
02/21/2024 07:00 PM UTC
OSU-220458, Outpatient Care East - Xray Machines
Interior renovation for new x-ray equipment and casework within existing occupied outpatient care facility.
02/16/2024 07:00 PM UTC
OSU-230412, Schottenstein - Fire Alarm Completion
This project will upgrade the remaining fire alarm systems throughout the Schottenstein Center that has not been previously completed through other projects. The scope of the project will require a design to upgrade the system to be compliant with current codes and University design standards and will include new and upgrades/replacement of audio and visual devices, pathways and wiring throughout portions of the building. There will also be work involved with the existing fire suppression systems to replace or add components to coordinate with the new work.
01/25/2024 07:00 PM UTC
OSU-210269 Building Envelope Repairs
The scope of the project include repair of exterior glue-lam arched beams, replacement of exterior T1-11 wood panel siding, limited site work for asphalt walk removal, installation of 2.5” rigid insulation, coverboard and PVC (FiberTite) roof membrane as an overlay on an existing PVC roof membrane. The new insulation and PVC (FiberTite) roof membrane will be provided by OSU as they already own the material.
01/04/2024 07:00 PM UTC
OSU-220221 OSUE West Parking Lot REBID
Construction of a new parking lot to the west of Hughes Street on the western edge of the OSU East Hospital Complex.
12/19/2023 07:00 PM UTC
151 - 160 of 643 Solicitations
1 2 … 12 13 14 16 18 19 20 … 64 65