The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork.
Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
| 05/07/2025 05:00 PM UTC |
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof
membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
| 05/13/2025 06:00 PM UTC |
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
| 05/14/2025 06:00 PM UTC |
OSU-240504-1 - Airport - Taxiway A, Phase 2
This project includes the milling of the existing asphalt surface on Taxiway A, full depth reclamation of remaining aggregate base, and asphalt paving. Also included is minor airfield electrical and pavement markings. The project is financed with grant assistance from the Federal Aviation Administration (FAA) and is subject to the Davis-Bacon Act and Related Provisions and compliance with FAA Buy American Preference.
| 05/20/2025 06:00 PM UTC |
OSU-230401, 2001 Polaris Pkwy - Cell Therapy Lab
Site work and utility connections to 4 modular units. Connector vestibules to 2001
Approx 1000 SF steel framed addition. Approx 4000 SF interior alterations for research laboratories and support spaces.
| 05/21/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-210346, East - Renovate for Flouro and ED X-Ray
The Project consists of the renovation of select areas on Level 2 of The Ohio State University Wexner Medical Center East Hospital to support the replacement of existing medical imaging equipment in CT, X-Ray, Rad-Fluoro, and Stress/Echo.
| 09/30/2022 06:00 PM UTC |
OSU-210795 Longaberger Multi-floor Renovations
This project will renovate lower level, 2nd, and 3rd floors including removing walls to open spaces, new flooring, paint, and updating staff desks and furniture.
| 09/30/2022 06:00 PM UTC |
OSU-210393 Healthy Community Center Renovation
Repurpose and renovation of the existing Martin Luther King Library on Long Street into a “Healthy Community Center” including demonstration kitchen, rentable community space, and leasable café
| 09/26/2022 06:00 PM UTC |
OSU-220002, MMP Pavilion - Sola MRI
Removal of existing MRI Equipment and replacement within existing MRI suite. Associated work to include limited demolition and upgrades to associated structural and MEP systems within the suite and on the roof of the existing building. Work to be completed within an active patient environment.
| 09/26/2022 06:00 PM UTC |
OSU-210310, Graves - Pathology Renal Space Phase 1 and Phase
The project will consist of the construction of
approximately 2100 SF of existing space into lab space
and approximately 2175 SF of office space renovations
in the basement of Graves Hall on the Columbus
Campus of The Ohio State University, 333 W. 10th Ave.,
Columbus, Ohio.
| 09/08/2022 06:00 PM UTC |
OSU-220509, Arps Hall - Rms 065, 127, 154J, 192 & Restrooms
Columbus Campus: The scope of work includes the renovation of existing Rooms 065K and 065N to accommodate a new Video Studio (Room 065Q), as well as a new entry (Room 065N) and multi-use room (Room 065P). Renovation of Office Suite 127 which will include (2) private offices, an open office, a reception area, small kitchenette and copy center. New entry into Suite 127 and existing conference room (Room 133). Renovate Rooms 191 and 192 to provide a lactation & meditation space, which will include a small kitchenette. Create a new south entry for office suite 196A. A new single user toilet room - Room 154T. Renovate (2) two existing men's toilet rooms, one on the 2nd Floor Room 263T (Alternate G-1) and the other on the 3rd Floor Room 359T (Alternate G-2).
| 09/07/2022 06:00 PM UTC |
OSU-150031, OSU African-American Extension Center (Community Project) - REBID
Renovation of 4,892 SF of the OSU African-American Community Extension Center located at 905 Mount Vernon Avenue, Columbus, Ohio. The project scope includes: The removal of an existing computer lab, three (3) offices and an equipment storage area to create a new flexible Computer Lab, a new Classroom, new ADA family Toilet Room and new open Gathering/Library Space. See also Alternates.
| 08/31/2022 06:00 PM UTC |
OSU-210542 Rhodes - Room S212 DR X-ray & Room S240F Bi-Plane
Rhodes - Room S212 DR X-ray & Room S240F Bi-Plane
This project will remove and install new DR x-ray equipment.
| 08/31/2022 06:00 PM UTC |
OSU-210456 - Wooster - Lab Bldg USDA Rm 305
This project will improve to shell space and create two offices with costs assumed by USDA and all finished and new spaces to be leased by USDA.
| 08/26/2022 06:00 PM UTC |
OSU-160980 Plumbing System Replacement BP3 - Wilce Piping Replacement
This project will replace deteriorating plumbing systems.
| 08/18/2022 05:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.