The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-240175, Research Admin Bldg - 4th Floor Renovation
Project consists of an interior renovation of approximately 10,466
SF of the 4th floor including minor demolition, construction of new
interior partitions, new ceiling grid and tile, new doors, new
finishes, associated mechanical, electrical, plumbing and fire
protection work. An accessible restroom is being added to the
floor. A break area will also be added with associated plumbing,
casework and fixtures.
| 11/19/2026 07:00 PM UTC |
|
OSU-255058, James Hospital D232A Brachytherapy CT Replacement
This project will install a new Siemens CT-on-rails in an existing
imaging room at the James Cancer Center. The scope includes
new conduit pathways, power, floor CT rails, ceiling coordination,
process chilled water and other infrastructure to support the new equipment.
| 11/20/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-210651, Faculty Club - Elevator Replacement REBID
OSU Columbus, Franklin County: Replacement of existing elevator at Faculty Club
and all associated scope of work
| 04/10/2024 06:00 PM UTC |
|
OSU-220456 12th Ave Dom Water & Sanitary REBID
Replacement of waterline and sanitary sewer along west 12th Ave
between High Street and College Street. All site work to be
performed between May 20 and August 2, 2024.
| 04/09/2024 05:00 PM UTC |
|
OSU-230111 Road/Bridge Renewal FY 23-24
The planned scope of work includes rehabilitation three bridges on
The Ohio State University’s Main Campus: Woody Hayes over
Olentangy River Road, Woody Hayes over Olentangy River.
Maintenance level repairs generally include concrete
patching/repairs, concrete walk repairs/replacement, joint and crack
sealing, and deck sealing and repair
| 04/05/2024 06:00 PM UTC |
|
OSU-240102 - Norton House - Chiller Replacement
The project will replace the chiller in Norton House dormitory.
| 04/01/2024 06:00 PM UTC |
|
OSU-230832 - Ohio Stadium - Heat Trace to Piping (Phase 1)
This project will repair and add
heat tracing in Ohio Stadium.
| 03/29/2024 06:00 PM UTC |
|
OSU-180390-4, 12th Avenue Bus Connector
12the Avenue Bus Connector
| 03/22/2024 06:00 PM UTC |
|
OSU-230304 Converse Hall - Bathroom/Shower Renovation
The renovation of OSU Converse Hall includes a multi-floor restroom renovation including an accessible restroom in the basement, changing room, and partial renovation of an office suite with a kitchenette.
| 03/20/2024 06:00 PM UTC |
|
OSU-230113 Campus Hardscape Improvements Phase 1 REBID
This project will improve campus hardscapes.
| 03/19/2024 06:00 PM UTC |
|
OSU-230414 - Smith Lab - Forensic Lab 4097 Renovation
The Ohio State University is seeking a general contractor to execute the renovation and conversion of a classroom space into a forensic anthropology laboratory. The renovation will include the removal/ abatement of ACM materials, the augmentation of the space surfaces to allow for cleaning, installation of requisite fixed and mobile dry and wet equipment. Plumbing scope includes backflow prevention, coring concrete for floor drains, and necessary sanitary and supply distribution piping to the sink. Mechanically, the project will remove the space from building air, and tie the space into the existing DOAS air handler. A capture hood, ductwork to a new roof-mounted exhaust fan, as well as air balancing are also included in the project scope. Controls modifications are included. Electrical modifications to supply the equipment include the addition of a sub-panel, and distribution circuiting in the space. Additionally, electrical work in the penthouse to feed the exhaust fan VFD, and smoke and fire separation at the floor are included.
| 03/14/2024 06:00 PM UTC |
|
OSU-230246, EEI - 4th Floor Otolaryngology Redesign
Tenant improvements of approximately 1,364sf on the fourth floor of the EEI Building, to accommodate a new Otolaryngology Research suite. The project will create a large staff workroom with conferencing capabilities, an Exam Room for a portable c-arm and conferencing capabilities, and minor upgrades to an Observation Room and Office.
| 03/13/2024 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.