General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26 SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory. PVC Membrane Roof Replacement at Independence Hall. Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
05/22/2026 06:00 PM UTC
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
05/28/2026 06:00 PM UTC
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
06/05/2026 06:00 PM UTC
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
06/09/2026 06:00 PM UTC
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
06/18/2026 05:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-220281, Airport - Terminal Apron Rehabilitation
OSU Airport: Phase 1 Rehabilitation of Terminal Apron from Asphalt to Concrete.
03/21/2023 06:00 PM UTC
OSU-200514 Eye & Ear Institute Parking Lot Repaving
This project will repave the parking lot and main drive along with other improvements.
03/16/2023 06:00 PM UTC
OSU-220611 11th Avenue Conversion
This project will convert 11th Avenue
03/03/2023 07:00 PM UTC
OSU-220522 Mechanical Room Refreshes FY 22
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications.
02/28/2023 06:00 PM UTC
OSU-200328 Tunnel System Evaluation BP 02
The Project consists of the permanent abandonment of the 19th Avenue Tunnel and the rehabilitation of the Cockins Hall Vault. The Project will also remove and replace piping within the Cockins Hall Vault and relocate communications cabling within the 19th Avenue Tunnel.
02/23/2023 07:00 PM UTC
OSU-210393 Healthy Community Center Renovation
Repurpose and renovation of the existing Martin Luther King Library on Long Street into a “Healthy Community Center” including demonstration kitchen, rentable community space, and leasable café.
02/14/2023 07:00 PM UTC
OSU-220393 University Hall - Rm 014 Renovation
Renovation of lecture hall to include fixed seating, ADA access to instructor, finishes, and technology
02/08/2023 07:00 PM UTC
OSU-210265 Roof Repairs and Replacements
Roof Repairs and Replacements for 1315 Kinnear Road. Includes associated interior protection, HVAC, plumbing, and electrical work.
01/27/2023 06:00 PM UTC
OSU-210265 Roof Repairs and Replacements
Roof Repairs and Replacements for 1315 Kinnear Road. Includes associated interior protection, HVAC, plumbing, and electrical work.
01/27/2023 11:00 AM UTC
OSU-221154 ESL - Steam & Condensate Piping Replacement
This project will replace steam and condensate piping.
01/26/2023 07:00 PM UTC
181 - 190 of 622 Solicitations
1 2 15 16 17 19 21 22 23 62 63