General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
10/01/2026 06:00 PM UTC
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
10/01/2026 06:00 PM UTC
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included. All noisy work is to occur after normal operating hours.
10/06/2026 06:00 PM UTC
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms 670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
10/08/2026 06:00 PM UTC
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
10/12/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-220052 Campus Traffic Signal Upgrades
Establish fiber optic communication with OSU owned traffic signal and the City of Columbus CTSS.
08/07/2023 06:00 PM UTC
OSU-220071 Exterior Door Control Upgrades FY 22
This project will upgrade door operators in various buildings on campus.
08/03/2023 07:00 PM UTC
OSU-210669, OSUWMC - Anesthetizing Location
Doan Hall/Rhodes Hall and Ross Heart Hospital spaces: At areas as indicated on drawings work for Med Gas Upgrades includes: Addition or replacement of Zone Valve Boxes, Alarm Panels, and installation of new outlets at use spots, or replacement of existing outlets to Med Gas. Work also including piping above ceilings and down walls to all new devices and connection to existing. Patching, repair, priming, and paint and/or replacement of finishes is limited to areas where work is being performed.
07/31/2023 06:00 PM UTC
OSU-200080, Riffe - Room 137 Helium Recovery System
OSU Columbus: The project includes work on the first floor of the Riffe Building to accommodate a new Helium recovery system. Work within Riffe Building is primarily located within the first floor, room R145. Work includes the selective demolition of existing elements to fully renovate approximately 300 sf of an existing laboratory into a new equipment room with new mezzanine level. Limited work also occurs on upper levels and at the roof to accommodate new mechanical equipment and piping pathways. Work includes but is not limited to General Trades, Abatement, HVAC, Electrical and Plumbing.
07/25/2023 06:00 PM UTC
OSU-220298, Lima - Reed Hall Theatre Upgrades
OSU Lima: This project consists of the construction of 4,000 SF interior renovation of the existing theatre in Reed Hall (4240 Campus Drive- Lima, Ohio 45804). The renovation includes refinishing the existing ceiling and upgrades to lighting and mechanical systems.
07/25/2023 06:00 PM UTC
OSU-210651 Faculty Club - Elevator Replacement
Faculty Club - Elevator Replacement - 181 S Oval Mall Columbus, OH 43210. This project will replace the elevator.
07/24/2023 06:00 PM UTC
OSU-221103, Crane - Orthopedic Immediate Care Clinic
Tenant improvements of approximately 4,590 sf on the second floor and 130 sf on the third floor to convert shelled space into office, exam, check-out and storage areas matching the finishes of the existing building. Work includes partition walls, doors, borrowed lites, finishes, fire protection, plumbing, mechanical, electrical and data installation.
06/22/2023 06:00 PM UTC
OSU-230113 - Campus Hardscape Improvements
This project will improve hardscapes around the OSU Columbus Campus
06/15/2023 06:00 PM UTC
OSU-230025 Airport - Taxiway E, Rehabilitation
The Ohio State University Airport/Don Scott Field (KOSU) is home to 150 aircraft and sees an estimated 90,000 flight operations per year. This is the primary facility serving The Ohio State University and the surrounding central Ohio community. KOSU has been identified as a “National Priority” general aviation airport by the FAA, is a Part 139 Certificated Airport, and serves as a general aviation reliever for John Glenn International Airport. As part of this project, the Airport looks to rehabilitate / reconstruct Taxiway E. Taxiway will need rehabilitated to support the aircraft type and keep taxiing aircraft safe.
05/30/2023 06:00 PM UTC
OSU-210272 Electrical Renovations FY 2021
Replace main electrical distribution equipment in the OSU’s Agricultural Engineering Building including switchboards, motor control centers, and panelboards. Upgrade egress lighting system. Separate standby and life safety emergency loads.
05/30/2023 05:00 PM UTC
181 - 190 of 643 Solicitations
1 2 … 15 16 17 19 21 22 23 … 64 65