The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OSU-250037 Roof Renewal FY25-26 REBID
Roof Renewal FY25-26
SBS Modified Bitumen Roof Replacement at Physical Activity and Education Services Building, Parks Hall and Scott Laboratory.
PVC Membrane Roof Replacement at Independence Hall.
Minor electrical and mechanical work to facilitate re-roofing, including removal of an abandoned chiller
| 05/22/2026 06:00 PM UTC |
|
OSU-240264, James - Envelope Remediation
The Work primarily includes replacement of joint sealants, gasketing, and cleaning and sealing of existing masonry. See Specification section 01 10 00 for detailed description of the Work.
| 05/28/2026 06:00 PM UTC |
|
OSU-255557, Morehouse Medical Plaza - 2400 GIM refresh
Phased renovation of selected areas within the Morehouse Medical Plaza, Suite 2400 General Internal Medicine Suite.
| 06/05/2026 06:00 PM UTC |
|
OSU-265050, Ackerman Rd, 660 - chiller replacement
Replacement of water-cooled chiller, cooling tower, and miscellaneous related modifications.
| 06/09/2026 06:00 PM UTC |
|
OSU-230109 Emergency Generator Replacements FY23-24 REBID
Provide new diesel generator with sub-base fuel tank, and multiple automatic transfer switches for the separation of life-safety and stand-by electrical distribution systems. The generator will be located exterior of Mershon Auditorium and Wexner Center. Provide required site work, including modification of existing planters and new metal fence for installation of generator.
| 06/18/2026 05:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-221154 ESL - Steam & Condensate Piping Replacement
This project will replace steam and condensate piping.
| 01/26/2023 05:00 AM UTC |
|
OSU-210626, Doan - Room 425 Pre Op Refresh
Interior renovation including ceilings, flooring, paint, and other general construction.
| 01/25/2023 07:00 PM UTC |
|
OSU-210456 Wooster - Lab Bldg USDA Rm 305 Build Out REBID
This project will improve the shell space and create two offices with costs assumed by USDA and all finished and new spaces to be leased by USDA.
| 01/24/2023 07:00 PM UTC |
|
OSU-220002, MMP Pavilion - SOLA MRI REBID
Removal of existing MRI Equipment and replacement within existing MRI suite. Associated work to include limited demolition and upgrades to associated structural and MEP systems within the suite and on the roof of the existing building. Work to be completed within an active patient environment.
| 01/19/2023 07:00 PM UTC |
|
OSU-190128 Envelope Modernization
This project will repair Larkins Plaza waterproofing, drains, and concrete as well as portions of the curtain walls on RPAC. Project will add lighting and repair concrete ramps and stairs.
| 01/11/2023 08:00 PM UTC |
|
OSU-210420, Newark - Founders Hall Enhancements
Full abatement services to the Founders Hall building on the OSU/COTC Newark Campus.
| 01/05/2023 07:00 PM UTC |
|
OSU-210267 HVAC Repair and Replacements FY 21 Re Bid
This project will repair or replace HVAC systems across campus.
| 12/22/2022 06:00 PM UTC |
|
OSU-210573, East Hospital-Talbot Hall 1st and 3rd Floor Renovation
3rd Floor: Demo of existing Office Area, approximately 3,700 sq ft. Construction of new offices with associated ME and Fire Suppression work.
1st Floor: Selective demo of existing Office, Restroom and Meeting Areas, approximately 4,300 sq ft. Renovations of Restrooms and selective rooms for new 30 day stay patient rooms, meeting rooms, laundry and living area with associated MEP and Fire Suppression work.
| 12/20/2022 07:00 PM UTC |
|
OSU-210542 Rhodes - Room S212 DR X-ray & Room S240F Bi-Plane
Rhodes Biplane and Xray Equipment Replacement
Interior renovation to replace existing Biplane and Xray equipment. Includes equipment replacement, relocation of walls, new doors and viewing windows, ceilings, fixtures and renovation of interior finishes.
| 12/07/2022 07:00 PM UTC |
|
OSU-220257, Dulles Hall - Room 106 Renovation
Columbus Campus: The project will consist of the construction of approximately 2,765 SF of existing office space in Dulles Hall Room 106. The renovation will include a new entry, reception area, work area and finish upgrades throughout along with mechanical, plumbing, and electrical upgrades.
| 11/30/2022 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.