General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-210742, Arps - Masonry & Parapet
OSU Columbus Campus: Masonry wall repairs and low-slope roof replacement for Arps Hall.
04/06/2026 06:00 PM UTC
OSU-250040 Fire Systems Renovations - FY25-26
Kuhn Honors and Scholars House, Graves Hall, Tzagournis Medical Research Facility
04/08/2026 06:00 PM UTC
OSU-255631, Morehouse Medical Plaza - Concourse - Medical Gas Enclosure and Upgrade
This project entails the addition of a new dedicated medical gas storage enclosure at the facility to safely house increased medical oxygen cylinder capacity in compliance with NFPA 99 standards, featuring secure noncombustible construction, proper ventilation, cylinder restraints, and required safety signage. The scope includes installation of additional medical oxygen drops in targeted patient care areas via new copper piping, zone valves, and alarm integrations, along with the strategic relocation of existing medical gas equipment to optimize accessibility, maintenance, and system redundancy. All work will involve phased implementation to minimize disruptions, full system purging, pressure testing, third party certification, and verification to ensure code-compliant, safe, and reliable medical gas delivery supporting current operations and future facility expansion.
04/10/2026 06:00 PM UTC
OSU-250039 Elevator Renovations - FY 25-26
Elevator Modernization and related architectural and MEP scopes of work at Pressey Hall on OSU’s Main Campus.
04/16/2026 06:02 PM UTC
OSU-230102 Roof Renewal FY23-24 BP 1
Work includes roof replacements on Agriculture Administration or “Ag Admin”, located at The Ohio State University Columbus Campus in Columbus, Ohio
04/23/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-220480 Sullivant - AHU Duct Replacement
This project will replace the AHU ducts in Sullivant Hall, 1813 North High Street, Columbus, OH 43210
11/16/2022 05:00 PM UTC
OSU-220012 Wooster - National Greenhouse HVAC
This project will remove existing steam boiler, piping and heating equipment and provide new air distribution and heating equipment
11/11/2022 07:00 PM UTC
OSU-160980 Plumbing System Replacement BP3 REBID
This project will replace deteriorating plumbing systems.
11/04/2022 05:00 PM UTC
OSU-210236, Parks - 3rd Floor Lab Renovations
The project includes work on the third floor of Parks Hall. Work within Parks Hall is primarily located within the third floor in the South end of the building. Work includes the selective demolition of existing elements to fully renovate 4,600 sf of existing third floor laboratory (Suites 319, 323 and Rooms 316 and 320) into a new laboratory space. Work includes but is not limited to General Trades, Abatement, HVAC, Electrical and Plumbing.
11/03/2022 06:00 PM UTC
OSU-190865, Polaris - Cytogenetics Lab Expansion
Selective renovation for expansion of Cytogenetics Labs, including multiple lab areas and the addition of an additional emergency generator.
11/02/2022 06:00 PM UTC
OSU-210682 - Mansfield - Civic Plaza Improvements REBID
This project will create a new outdoor plaza area between Eisenhower Memorial Center and Conard Hall - approx. 4,000 SF
10/27/2022 06:00 PM UTC
OSU-210267 HVAC Repair and Replacements FY 21
This project will repair or replace HVAC systems across campus.
10/18/2022 06:00 PM UTC
OSU-210310, Graves - Pathology Renal Space Phase 1 and Phase 2 REBID
The project will consist of the construction of approximately 2100 SF of existing space into lab space and approximately 2175 SF of office space renovations in the basement of Graves Hall on the Columbus Campus of The Ohio State University, 333 W. 10th Ave., Columbus, Ohio.
10/14/2022 06:00 PM UTC
OSU-190025-BP2 Roof Replacements FY 2019
This project will replace roofs on various campus buildings.
10/12/2022 06:00 PM UTC
OSU-210287, Marion - Alber Student Center Renovation Ph 2 (REBID)
Marion Campus: Interior renovation and improvement of selected areas of the Alber Student Center, including the existing public restrooms, locker rooms, game room, and gymnasium.
10/05/2022 06:00 PM UTC
191 - 200 of 608 Solicitations
1 2 16 17 18 20 22 23 24 60 61