OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
| 12/17/2025 07:00 PM UTC |
|
OSU-240045, James Care East Refresh
This project will update finishes on the 14th Floor of the OSU East hospital for the James Care East clinic. Updates include ceiling, flooring, and wall finishes. Improvements also include reconfiguration of infusion spaces and ADA upgrades.
| 12/19/2025 07:00 PM UTC |
|
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24 REBID
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall and 209 Maintenance Building. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes two alternates which involve the removal and replacement of domestic cold water lines at Electroscience Laboratory and Plumb Hall.
| 12/22/2025 07:00 PM UTC |
|
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
| 01/05/2026 07:00 PM UTC |
|
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
| 01/12/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-220509, Arps Hall - Rms 065, 127, 154J, 192 & Restrooms
Columbus Campus: The scope of work includes the renovation of existing Rooms 065K and 065N to accommodate a new Video Studio (Room 065Q), as well as a new entry (Room 065N) and multi-use room (Room 065P). Renovation of Office Suite 127 which will include (2) private offices, an open office, a reception area, small kitchenette and copy center. New entry into Suite 127 and existing conference room (Room 133). Renovate Rooms 191 and 192 to provide a lactation & meditation space, which will include a small kitchenette. Create a new south entry for office suite 196A. A new single user toilet room - Room 154T. Renovate (2) two existing men's toilet rooms, one on the 2nd Floor Room 263T (Alternate G-1) and the other on the 3rd Floor Room 359T (Alternate G-2).
| 09/07/2022 06:00 PM UTC |
|
OSU-150031, OSU African-American Extension Center (Community Project) - REBID
Renovation of 4,892 SF of the OSU African-American Community Extension Center located at 905 Mount Vernon Avenue, Columbus, Ohio. The project scope includes: The removal of an existing computer lab, three (3) offices and an equipment storage area to create a new flexible Computer Lab, a new Classroom, new ADA family Toilet Room and new open Gathering/Library Space. See also Alternates.
| 08/31/2022 06:00 PM UTC |
|
OSU-210542 Rhodes - Room S212 DR X-ray & Room S240F Bi-Plane
Rhodes - Room S212 DR X-ray & Room S240F Bi-Plane
This project will remove and install new DR x-ray equipment.
| 08/31/2022 06:00 PM UTC |
|
OSU-210456 - Wooster - Lab Bldg USDA Rm 305
This project will improve to shell space and create two offices with costs assumed by USDA and all finished and new spaces to be leased by USDA.
| 08/26/2022 06:00 PM UTC |
|
OSU-160980 Plumbing System Replacement BP3 - Wilce Piping Replacement
This project will replace deteriorating plumbing systems.
| 08/18/2022 05:00 PM UTC |
|
OSU-210096, Doan-Rhodes - Replace Imaging Equipment REBID
Replaces two existing fluoroscopy rooms and a nuclear medicine camera along with renovation of surrounding support spaces including an existing toilet to comply with ADA. Scope of work includes associated MEP, Fire Protection Systems, and Hazardous Material removal. The work is to be performed in three phases. Phase One – the Zee MP and Spect CT areas; Phase Two – the Agile area; and Phase Three – the technician work area.
| 07/29/2022 06:00 PM UTC |
|
OSU-200591, Lima - Galvin Hall Basement Renovation
Lima Campus: The project will renovate approximately 10,022 SF on the Basement Level. The scope of the project is to expand the Student Activity Spaces; rooms include a Commons, Student Lounge, Game Room, Catering Kitchen, Kitchenette, Huddle Rooms, Conference Space, Offices and an Exterior Patio Space directly outside the Commons.
| 07/26/2022 06:00 PM UTC |
|
OSU-220008 - Neil Ave Building-Cooling Tower Replacement
This project will replace the cooling tower in the Neil Avenue Building.
| 07/26/2022 06:00 PM UTC |
|
OSU-210329 650 Ackerman Roof Replacement
This project will replace the existing roof, make repairs to the existing deck, and add a roof drain and insulation to improve drainage.
| 07/21/2022 06:00 PM UTC |
|
OSU-210268 Elevator Safety Repairs and Replacements
Elevator Modernization and related architectural and MEP scopes of
work for a total of 7 elevators in 4 buildings on OSU’s Main Campus:
Arps Hall (1 passenger elevator base bid)
Dulles Hall (2 passenger elevators base bid)
Smith Lab (1 passenger, base bid and 1 Freight Elevator, Alternate)
University Hall (2 elevators base bid)
| 06/29/2022 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.