General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250054 Newark - Entrances and Circulation Improvements
The project includes a new roadway, traffic signal, shared use path, lighting, and landscape improvements for a new entrance road at Country Club and Londondale intersection onto OSU Newark campus.
10/01/2026 06:00 PM UTC
OSU-255336, James MRI 3T Skyra MRI Upgrade to Vida Fit - Suite C121
This project is the upgrade of finishes and the internal components for two Siemens’s MRI machines. The area of work is approximately 1,390 square feet. The work consists of removal of existing finishes, installation of new finishes, new led lights, minor electrical and data work, new casework in select locations, and updating several doors and spaces for accessibility requirements.
10/01/2026 06:00 PM UTC
OSU-250339, Psychology Cage Washer Update
Installation of a new cage washer in the basement floor of the building, work includes removal of existing cage washer, demo of walls, pit and door, installation of new cage washer (By Tecniplast Vendor), Patching, Repair and final connections as needed, Additional utility upgrades including a new compressor are included. All noisy work is to occur after normal operating hours.
10/06/2026 06:00 PM UTC
OSU-265412, Ackerman Rd, 640 - Additional Office for IT
640 Ackerman Rd – Interior Renovation of 2,400 SF office space to include conference and meeting rooms 670 Ackerman Rd (ALT A-1) – Upgrade of existing HVAC and electrical systems to provide additional workstations in Room B331.
10/08/2026 06:00 PM UTC
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.
10/12/2026 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OSU-220732 East - ADA Parking Lot
Project includes the pavement rehabilitation, replacement of curbing and concrete areas to bring the East – ADA Parking Lot up to current. Accessibility Code. The lot will be re-striped and signed per City of Columbus and Ohio ADA requirements.
05/26/2023 05:00 PM UTC
OSU-220282, Airport - Taxiway A Rehabilitation (REBID)
OSU Airport: Phase 1 - Rehabilitation of Taxiway A
05/11/2023 06:00 PM UTC
OSU - 220522 Mechanical Room Refreshes FY 22 (Re-Bid #3)
This project will Refresh mechanical rooms in multiple buildings.
05/04/2023 05:00 PM UTC
OSU-210651, Faculty Club - Elevator Replacement
OSU Columbus: Replacement of existing elevator at Faculty Club and all associated scope of work.
04/18/2023 06:00 PM UTC
OSU-220998, PAES - ExSci Lab Renovation
OSU Columbus: The project consists of 1,345 SF of office space renovation in the ground floor of the Physical Activity and Educational Services building (PAES), 305 Annie and John Glenn Avenue, at The Ohio State University. Locations of work include refresh of rooms A011, A012, A021, and A023. Scope includes demolition, interior finish upgrades, modification of existing building fire protection and electrical systems.
04/17/2023 06:00 PM UTC
OSU-220051 Enhanced Maintenance FY 22
Aluminum window and aluminum storefront replacement and masonry structural wall and veneer and poured concrete envelope restoration for Postle Hall and Research Center buildings.
04/13/2023 07:00 PM UTC
OSU-220282, Airport - Taxiway A Rehabilitation
OSU Airport: Phase 1 - Rehabilitation of Taxiway A
04/11/2023 06:00 PM UTC
OSU-220259, 700 Ackerman - 4th Floor Improvements
Columbus Campus: The project will consist of the construction of approximately 7,040 Sf of existing office space within suite 400 on the 4th floor of the 700 Ackerman Place building. The renovation will include new entry, finish upgrades, along with mechanical plumbing and electrical upgrades.
03/31/2023 06:00 PM UTC
OSU-210675, Ross - Suite H2260 CT Install and Renovation
Interior renovation to create a CT imaging suite, including imaging equipment and associated mechanical equipment, casework, finishes and accessories. Medical Center will continue to operate during construction. Contractor will follow all Medical Center ICRA and ILSM requirements.
03/30/2023 06:00 PM UTC
OSU-220520 Mechanical Room Refreshes FY 22 (Re-Bid)
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
03/29/2023 05:00 PM UTC
191 - 200 of 643 Solicitations
1 2 … 16 17 18 20 22 23 24 … 64 65